|
|
PREPARING ROW
|
STA
|
38.400
|
$3,000.000
|
$1,000.000
|
$6,000.000
|
$10,000.000
|
$3,500.000
|
$2,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
367.000
|
$15.000
|
$35.000
|
$15.000
|
$20.000
|
$20.000
|
$25.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
3,477.000
|
$7.000
|
$6.000
|
$5.500
|
$4.500
|
$7.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,240.000
|
$10.000
|
$8.000
|
$12.000
|
$10.000
|
$13.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
24,166.000
|
$15.000
|
$10.000
|
$10.500
|
$16.000
|
$16.000
|
$17.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
19,130.000
|
$0.750
|
$2.000
|
$1.000
|
$2.000
|
$2.750
|
$3.000
|
|
|
BLOCK SODDING
|
SY
|
400.000
|
$3.000
|
$5.250
|
$6.000
|
$5.500
|
$6.000
|
$5.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
9,565.000
|
$0.100
|
$0.130
|
$0.150
|
$0.150
|
$0.150
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
9,565.000
|
$0.100
|
$0.130
|
$0.150
|
$0.150
|
$0.150
|
$0.500
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
19,130.000
|
$0.300
|
$0.330
|
$0.300
|
$0.350
|
$0.350
|
$0.750
|
|
|
VEGETATIVE WATERING
|
MG
|
768.000
|
$15.000
|
$20.000
|
$1.000
|
$5.000
|
$0.010
|
$10.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
9,288.000
|
$1.000
|
$0.960
|
$1.000
|
$1.200
|
$1.000
|
$5.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
124.000
|
$5.000
|
$1.000
|
$1.000
|
$0.010
|
$22.000
|
$10.000
|
|
|
PROOF ROLLING
|
HR
|
4.000
|
$70.000
|
$150.000
|
$1.000
|
$200.000
|
$110.000
|
$80.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
7,217.000
|
$40.000
|
$45.000
|
$50.000
|
$45.000
|
$44.000
|
$35.000
|
|
|
CEMENT
|
TON
|
265.000
|
$180.000
|
$160.000
|
$200.000
|
$205.000
|
$180.000
|
$180.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
879.000
|
$4.000
|
$7.500
|
$8.000
|
$5.500
|
$5.000
|
$5.000
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
11,288.000
|
$4.000
|
$2.500
|
$3.000
|
$2.800
|
$5.000
|
$4.000
|
|
|
ASPH (RC-250)
|
TON
|
18.000
|
$800.000
|
$750.000
|
$1,600.000
|
$1,400.000
|
$1,200.000
|
$5.000
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
105.000
|
$250.000
|
$200.000
|
$300.000
|
$210.000
|
$195.000
|
$180.000
|
|
|
AGGR (TY E OR L, PE OR PL GR 4)
|
CY
|
98.000
|
$250.000
|
$325.000
|
$300.000
|
$220.000
|
$175.000
|
$180.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
91.000
|
$250.000
|
$335.000
|
$300.000
|
$270.000
|
$200.000
|
$180.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
GAL
|
11,201.000
|
$4.250
|
$4.000
|
$7.000
|
$4.500
|
$3.600
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
378.000
|
$190.000
|
$175.000
|
$200.000
|
$200.000
|
$230.000
|
$180.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,136.000
|
$160.000
|
$150.000
|
$155.000
|
$225.000
|
$205.000
|
$350.000
|
|
|
CL C CONC (ABUT)
|
CY
|
102.800
|
$1,000.000
|
$1,125.000
|
$920.000
|
$1,250.000
|
$1,100.000
|
$1,100.000
|
|
|
CL C CONC (CAP)
|
CY
|
244.600
|
$1,000.000
|
$1,000.000
|
$920.000
|
$1,250.000
|
$1,200.000
|
$1,200.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
66.100
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
$1,250.000
|
$1,200.000
|
$1,120.000
|
|
|
REINF CONC SLAB
|
SF
|
54,740.000
|
$20.000
|
$18.000
|
$17.000
|
$22.000
|
$23.000
|
$25.000
|
|
|
APPROACH SLAB
|
CY
|
142.000
|
$450.000
|
$800.000
|
$600.000
|
$575.000
|
$640.000
|
$650.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
7,098.240
|
$180.000
|
$135.000
|
$155.000
|
$157.000
|
$197.000
|
$160.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,453.000
|
$120.000
|
$100.000
|
$150.000
|
$170.000
|
$139.000
|
$185.000
|
|
|
RAIL (TY T223)
|
LF
|
2,452.000
|
$100.000
|
$100.000
|
$100.000
|
$88.000
|
$116.000
|
$165.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
364.000
|
$100.000
|
$92.000
|
$90.000
|
$125.000
|
$140.000
|
$180.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
69.000
|
$75.000
|
$90.000
|
$60.000
|
$75.000
|
$93.000
|
$60.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,000.000
|
$815.000
|
$2,500.000
|
$1,100.000
|
$1,200.000
|
$300.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$55,000.000
|
$25,000.000
|
$30,000.000
|
$150,000.000
|
$58,000.000
|
$100,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
2.000
|
$350.000
|
$500.000
|
$50.000
|
$350.000
|
$290.000
|
$500.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
99.000
|
$10.000
|
$10.000
|
$2.000
|
$6.500
|
$7.000
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$530,000.000
|
$400,000.000
|
$515,000.000
|
$700,000.000
|
$1,075,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$5,000.000
|
$15,000.000
|
$3,000.000
|
$2,000.000
|
$4,850.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
160.000
|
$30.000
|
$36.230
|
$1.000
|
$38.000
|
$40.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
160.000
|
$5.000
|
$8.930
|
$1.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
266.000
|
$15.000
|
$10.000
|
$1.000
|
$25.000
|
$25.500
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
266.000
|
$5.000
|
$2.000
|
$1.000
|
$9.000
|
$9.500
|
$10.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
638.000
|
$3.000
|
$3.000
|
$1.000
|
$5.000
|
$5.000
|
$17.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,316.000
|
$3.000
|
$3.100
|
$1.000
|
$3.250
|
$3.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,316.000
|
$0.750
|
$0.890
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
322.000
|
$30.000
|
$35.000
|
$50.000
|
$80.000
|
$52.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,550.000
|
$25.000
|
$23.780
|
$24.000
|
$25.000
|
$26.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,900.000
|
$1,627.500
|
$1,600.000
|
$1,705.000
|
$2,700.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
900.000
|
$2.000
|
$2.630
|
$2.000
|
$3.000
|
$3.000
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,700.000
|
$2,493.750
|
$2,600.000
|
$2,615.000
|
$2,800.000
|
$2,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$250.000
|
$262.500
|
$100.000
|
$275.000
|
$300.000
|
$500.000
|
|
|
GATE (REMOVE)
|
EA
|
3.000
|
$400.000
|
$500.000
|
$100.000
|
$300.000
|
$115.000
|
$500.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
99.000
|
$15.000
|
$25.000
|
$15.000
|
$25.000
|
$23.000
|
$17.000
|
|
|
GATE (TY 1)
|
EA
|
3.000
|
$1,500.000
|
$850.000
|
$1,000.000
|
$750.000
|
$1,500.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
1.000
|
$225.000
|
$246.750
|
$300.000
|
$260.000
|
$275.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
6.000
|
$500.000
|
$341.250
|
$400.000
|
$360.000
|
$375.000
|
$850.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$80.000
|
$99.750
|
$50.000
|
$105.000
|
$85.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
26.000
|
$30.000
|
$15.750
|
$20.000
|
$17.000
|
$18.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
34.000
|
$30.000
|
$28.880
|
$30.000
|
$30.000
|
$32.000
|
$75.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
768.000
|
$0.650
|
$0.500
|
$5.000
|
$1.200
|
$1.600
|
$5.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
7,680.000
|
$0.150
|
$0.160
|
$0.800
|
$0.140
|
$0.150
|
$2.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
7,680.000
|
$0.150
|
$0.160
|
$0.800
|
$0.140
|
$0.150
|
$2.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
5,080.000
|
$2.200
|
$0.110
|
$0.150
|
$0.550
|
$0.600
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
7,680.000
|
$2.000
|
$0.740
|
$0.800
|
$1.300
|
$1.400
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
7,680.000
|
$2.000
|
$0.740
|
$0.800
|
$1.300
|
$1.400
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
96.000
|
$10.000
|
$2.630
|
$4.000
|
$5.500
|
$6.000
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
5,080.000
|
$1.000
|
$0.160
|
$0.200
|
$0.550
|
$0.600
|
$1.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
281.000
|
$125.000
|
$150.000
|
$140.000
|
$150.000
|
$185.000
|
$180.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$7,500.000
|
$8,000.000
|
$9,500.000
|
$18,000.000
|
$5,000.000
|
$17,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
3.000
|
$175.000
|
$225.000
|
$250.000
|
$350.000
|
$500.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$900.000
|
$500.000
|
$250.000
|
$350.000
|
$300.000
|
$500.000
|
|
Totals: |
$5,973,730.150
|
$5,264,189.370
|
$5,719,385.200
|
$7,037,212.920
|
$7,254,367.860
|
$7,357,909.900
|