|
|
PREPARING ROW
|
AC
|
25.700
|
$275.000
|
$170.670
|
$400.000
|
$700.000
|
$31,100.000
|
$1,000.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
6.000
|
$1,000.000
|
$1,137.810
|
$925.000
|
$900.000
|
$750.000
|
$2,000.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
2.000
|
$1,800.000
|
$2,450.850
|
$1,900.000
|
$450.000
|
$900.000
|
$2,850.000
|
|
|
PREPARING ROW (TREE) (36" TO 48" DIA)
|
EA
|
1.000
|
$2,200.000
|
$4,036.960
|
$5,550.000
|
$500.000
|
$1,000.000
|
$3,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
500.000
|
$5.000
|
$11.500
|
$20.400
|
$32.000
|
$4.000
|
$28.750
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
106.000
|
$50.000
|
$12.800
|
$32.850
|
$35.000
|
$15.000
|
$50.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
8.250
|
$1,500.000
|
$490.710
|
$1,065.000
|
$2,200.000
|
$1,200.000
|
$3,000.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
323.000
|
$25.000
|
$28.930
|
$55.400
|
$45.000
|
$12.000
|
$22.000
|
|
|
BACKFILL (TY A)
|
STA
|
1,120.000
|
$175.000
|
$201.920
|
$230.000
|
$175.000
|
$200.000
|
$240.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
25.350
|
$350.000
|
$392.540
|
$385.000
|
$345.000
|
$450.000
|
$400.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR 4)(9")
|
SY
|
1,445.000
|
$18.000
|
$27.660
|
$24.350
|
$35.000
|
$18.000
|
$40.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
361.000
|
$10.000
|
$4.510
|
$5.900
|
$8.000
|
$3.500
|
$10.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
12,269.000
|
$3.500
|
$3.970
|
$4.100
|
$3.500
|
$3.500
|
$5.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
549.000
|
$10.000
|
$6.340
|
$4.300
|
$8.000
|
$6.000
|
$10.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
13.000
|
$140.000
|
$711.170
|
$295.000
|
$700.000
|
$95.000
|
$1,300.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
|
TON
|
56,356.000
|
$95.000
|
$100.000
|
$100.500
|
$128.000
|
$118.000
|
$143.000
|
|
|
TACK COAT
|
GAL
|
65,733.000
|
$4.000
|
$3.860
|
$4.500
|
$0.010
|
$3.000
|
$7.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
31,106.000
|
$23.000
|
$25.610
|
$25.450
|
$24.000
|
$19.000
|
$30.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,380.000
|
$2.250
|
$8.140
|
$6.400
|
$22.000
|
$1.650
|
$8.050
|
|
|
PLANE ASPH CONC PAV (10")
|
SY
|
415.000
|
$4.500
|
$10.620
|
$29.550
|
$34.000
|
$14.500
|
$32.200
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
39.000
|
$200.000
|
$123.530
|
$202.400
|
$185.000
|
$75.000
|
$220.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
2.000
|
$7,500.000
|
$6,599.310
|
$8,400.000
|
$15,000.000
|
$2,750.000
|
$9,500.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
1.000
|
$2,500.000
|
$3,527.220
|
$4,200.000
|
$3,000.000
|
$1,750.000
|
$4,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$3,641.000
|
$4,200.000
|
$3,100.000
|
$1,500.000
|
$4,000.000
|
|
|
REMOV STR (SET)
|
EA
|
5.000
|
$500.000
|
$1,137.810
|
$1,600.000
|
$1,000.000
|
$750.000
|
$1,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$630,000.000
|
$897,222.560
|
$916,000.000
|
$1,000,000.000
|
$1,050,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$1,200.000
|
$20,000.000
|
$22,500.000
|
$25,000.000
|
$5,500.000
|
$20,300.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
200.000
|
$6.000
|
$5.920
|
$9.000
|
$10.000
|
$4.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$2.000
|
$1.140
|
$6.650
|
$2.000
|
$0.250
|
$2.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
197,377.000
|
$0.130
|
$0.160
|
$0.150
|
$0.200
|
$0.150
|
$0.120
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,275.000
|
$28.000
|
$31.130
|
$28.250
|
$23.000
|
$25.000
|
$26.450
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,300.000
|
$1,382.440
|
$1,715.000
|
$1,295.000
|
$1,150.000
|
$1,489.250
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,125.000
|
$3.000
|
$8.530
|
$3.350
|
$4.000
|
$2.000
|
$4.600
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$275.000
|
$470.260
|
$335.000
|
$350.000
|
$125.000
|
$402.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$3,000.000
|
$2,483.840
|
$3,320.000
|
$2,725.000
|
$2,700.000
|
$3,133.750
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$315.000
|
$74.640
|
$330.000
|
$350.000
|
$200.000
|
$402.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
20.000
|
$900.000
|
$659.930
|
$920.000
|
$370.000
|
$450.000
|
$871.700
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
13.000
|
$1,000.000
|
$807.850
|
$1,085.000
|
$530.000
|
$585.000
|
$1,118.950
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,100.000
|
$773.710
|
$1,050.000
|
$1,000.000
|
$725.000
|
$1,070.650
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
3.000
|
$1,000.000
|
$910.250
|
$1,080.000
|
$1,300.000
|
$520.000
|
$1,112.050
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
49.000
|
$1,300.000
|
$1,160.570
|
$1,290.000
|
$765.000
|
$725.000
|
$1,421.400
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,300.000
|
$1,160.570
|
$1,295.000
|
$835.000
|
$825.000
|
$1,368.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,200.000
|
$1,365.370
|
$1,350.000
|
$1,325.000
|
$785.000
|
$1,431.750
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
110.000
|
$110.000
|
$113.780
|
$120.000
|
$65.000
|
$95.000
|
$172.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
100.000
|
$100.000
|
$113.780
|
$155.000
|
$120.000
|
$80.000
|
$143.750
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
44.000
|
$90.000
|
$113.780
|
$155.000
|
$115.000
|
$60.000
|
$143.750
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
122.000
|
$140.000
|
$113.780
|
$155.000
|
$120.000
|
$75.000
|
$143.750
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
362.000
|
$12.000
|
$17.070
|
$17.000
|
$15.000
|
$20.000
|
$23.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
21.000
|
$30.000
|
$45.510
|
$11.000
|
$40.000
|
$25.000
|
$44.850
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
38,737.000
|
$0.800
|
$0.170
|
$0.170
|
$0.150
|
$0.750
|
$0.170
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
114,819.000
|
$0.700
|
$0.170
|
$0.170
|
$0.150
|
$0.750
|
$0.170
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
5,492.000
|
$1.300
|
$0.300
|
$0.290
|
$0.260
|
$1.000
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
114,819.000
|
$0.800
|
$0.170
|
$0.170
|
$0.150
|
$0.750
|
$0.170
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
14,521.000
|
$1.000
|
$2.280
|
$1.200
|
$1.000
|
$1.000
|
$2.900
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
5,741.000
|
$1.000
|
$2.280
|
$1.250
|
$1.000
|
$1.300
|
$2.900
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
5,492.000
|
$0.800
|
$0.730
|
$0.710
|
$0.640
|
$1.000
|
$0.740
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
267.000
|
$9.000
|
$8.530
|
$8.300
|
$7.500
|
$9.000
|
$8.630
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
18.000
|
$160.000
|
$199.120
|
$194.000
|
$175.000
|
$125.000
|
$201.250
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
18.000
|
$230.000
|
$256.010
|
$250.000
|
$225.000
|
$200.000
|
$258.750
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
473.000
|
$17.000
|
$22.760
|
$22.150
|
$20.000
|
$50.000
|
$23.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
28,210.000
|
$0.400
|
$0.360
|
$0.350
|
$0.320
|
$0.350
|
$0.370
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
110,404.000
|
$0.400
|
$0.360
|
$0.350
|
$0.320
|
$0.300
|
$0.370
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
96,550.000
|
$0.400
|
$0.360
|
$0.350
|
$0.320
|
$0.300
|
$0.370
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,410.000
|
$3.300
|
$3.700
|
$3.600
|
$3.250
|
$4.000
|
$3.740
|
|
|
UNDERSEAL COURSE
|
GAL
|
80,875.000
|
$3.400
|
$2.750
|
$4.050
|
$5.550
|
$4.500
|
$5.360
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,500.000
|
$23,471.430
|
$24,700.000
|
$12,000.000
|
$7,500.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
110.000
|
$350.000
|
$354.840
|
$675.000
|
$600.000
|
$175.000
|
$460.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
768.000
|
$45.000
|
$83.390
|
$67.500
|
$5.000
|
$30.000
|
$100.000
|
|
Totals: |
$8,316,512.910
|
$8,973,976.406
|
$9,262,033.050
|
$10,554,061.760
|
$10,629,869.300
|
$11,900,663.360
|