REMOVING CONCRETE(MOW STRIP)
|
LF
|
463.000
|
$9.000
|
$8.000
|
$4.470
|
$10.000
|
$5.500
|
$10.000
|
$3.150
|
|
|
|
BACKFILL (TY B)
|
STA
|
785.000
|
$95.000
|
$150.000
|
$94.650
|
$125.000
|
$200.000
|
$100.000
|
$190.000
|
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
27,134.000
|
$1.350
|
$1.050
|
$1.820
|
$1.500
|
$1.400
|
$1.890
|
$0.860
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
27,134.000
|
$0.300
|
$0.400
|
$0.350
|
$0.370
|
$0.330
|
$0.350
|
$0.370
|
|
|
|
VEGETATIVE WATERING
|
MG
|
423.000
|
$18.000
|
$13.000
|
$19.980
|
$19.000
|
$30.000
|
$30.000
|
$110.000
|
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
227,861.000
|
$1.270
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
6,604.000
|
$28.640
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
|
TON
|
88,926.000
|
$80.000
|
$68.000
|
$83.920
|
$89.000
|
$97.250
|
$84.680
|
$109.190
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
9,313.000
|
$35.000
|
$42.000
|
$37.150
|
$40.250
|
$50.000
|
$45.000
|
$44.920
|
|
|
|
PLANE ASPH CONC PAV (1" TO 3")
|
SY
|
748,514.000
|
$2.500
|
$1.050
|
$1.280
|
$1.000
|
$1.250
|
$1.260
|
$1.000
|
|
|
|
PLANE ASPH CONC PAV (2" TO 6")
|
SY
|
11,019.000
|
$3.750
|
$1.150
|
$2.330
|
$1.500
|
$4.500
|
$2.840
|
$5.000
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
3.000
|
$140.000
|
$200.000
|
$199.000
|
$180.000
|
$870.000
|
$190.000
|
$800.000
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
41.600
|
$350.000
|
$900.000
|
$866.000
|
$770.000
|
$1,310.000
|
$825.000
|
$1,245.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,112.000
|
$450.000
|
$450.000
|
$419.000
|
$490.000
|
$400.000
|
$425.000
|
$425.000
|
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
1,620.000
|
$10.000
|
$16.000
|
$8.500
|
$11.000
|
$9.500
|
$9.500
|
$8.930
|
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
2,342.300
|
$150.000
|
$155.000
|
$120.000
|
$139.000
|
$110.000
|
$128.000
|
$125.000
|
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
272.000
|
$350.000
|
$520.000
|
$387.760
|
$445.000
|
$425.000
|
$388.000
|
$407.150
|
|
|
|
JOINT SEALANT
|
LF
|
1,620.000
|
$6.750
|
$12.000
|
$6.500
|
$7.000
|
$7.250
|
$6.500
|
$6.830
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$982,000.000
|
$800,000.000
|
$1,082,550.270
|
$1,094,000.000
|
$215,000.000
|
$1,260,000.000
|
$300,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$6,000.000
|
$12,000.000
|
$4,721.800
|
$3,300.000
|
$2,500.000
|
$5,000.000
|
$5,000.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
23,213.000
|
$3.750
|
$3.500
|
$3.000
|
$3.000
|
$3.750
|
$2.750
|
$2.890
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
23,213.000
|
$1.000
|
$0.700
|
$0.700
|
$0.600
|
$1.500
|
$0.600
|
$0.690
|
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
4,920.000
|
$12.000
|
$50.000
|
$21.000
|
$20.000
|
$13.000
|
$24.000
|
$13.000
|
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
4,530.000
|
$4.000
|
$8.000
|
$10.500
|
$10.000
|
$9.500
|
$14.000
|
$9.000
|
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
4,920.000
|
$4.000
|
$12.000
|
$16.500
|
$10.000
|
$12.500
|
$16.000
|
$12.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
287,712.000
|
$0.150
|
$0.130
|
$0.190
|
$0.150
|
$0.120
|
$0.090
|
$0.240
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
19,550.000
|
$25.000
|
$20.000
|
$16.600
|
$21.000
|
$24.000
|
$16.600
|
$17.450
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
45.000
|
$1,800.000
|
$1,575.000
|
$2,060.000
|
$2,170.000
|
$1,550.000
|
$2,200.000
|
$1,785.000
|
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
26.000
|
$1,225.000
|
$860.000
|
$700.000
|
$960.000
|
$1,250.000
|
$700.000
|
$735.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
47.000
|
$1,000.000
|
$1,100.000
|
$950.000
|
$1,000.000
|
$1,100.000
|
$950.000
|
$997.500
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
19,550.000
|
$3.000
|
$1.000
|
$1.000
|
$1.500
|
$1.100
|
$1.000
|
$1.050
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
46.000
|
$150.000
|
$110.000
|
$100.000
|
$220.000
|
$135.000
|
$104.000
|
$105.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$250.000
|
$195.000
|
$100.000
|
$220.000
|
$110.000
|
$104.000
|
$105.000
|
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
53.000
|
$165.000
|
$25.000
|
$100.000
|
$110.000
|
$110.000
|
$104.000
|
$105.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
45.000
|
$2,500.000
|
$2,715.000
|
$2,200.000
|
$2,400.000
|
$3,000.000
|
$2,300.000
|
$2,310.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
46.000
|
$250.000
|
$116.000
|
$150.000
|
$200.000
|
$215.000
|
$155.000
|
$157.500
|
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
8.000
|
$10,500.000
|
$7,300.000
|
$7,300.000
|
$7,700.000
|
$8,000.000
|
$7,590.000
|
$7,665.000
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$900.000
|
$970.000
|
$500.000
|
$990.000
|
$1,000.000
|
$520.000
|
$525.000
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$660.000
|
$265.000
|
$100.000
|
$550.000
|
$750.000
|
$104.000
|
$105.000
|
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
500.500
|
$23.000
|
$30.000
|
$25.300
|
$27.800
|
$27.500
|
$30.000
|
$26.570
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
46.000
|
$48.000
|
$52.000
|
$43.950
|
$48.000
|
$50.000
|
$51.000
|
$46.150
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
232.000
|
$18.000
|
$28.000
|
$15.000
|
$14.000
|
$15.000
|
$27.000
|
$15.750
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
80.000
|
$16.000
|
$28.000
|
$15.000
|
$14.000
|
$15.000
|
$27.000
|
$15.750
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
55,030.000
|
$0.450
|
$0.660
|
$0.630
|
$0.690
|
$0.690
|
$0.650
|
$0.470
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
231,957.000
|
$0.450
|
$0.600
|
$0.570
|
$0.630
|
$0.620
|
$0.600
|
$0.470
|
|
|
|
WK ZN PAV MRK REMOV (W)(ENTR GORE)
|
EA
|
12.000
|
$2.000
|
$785.000
|
$750.000
|
$825.000
|
$800.000
|
$780.000
|
$525.000
|
|
|
|
WK ZN PAV MRK REMOV (W)(EXIT GORE)
|
EA
|
13.000
|
$680.000
|
$785.000
|
$750.000
|
$825.000
|
$800.000
|
$780.000
|
$525.000
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
230,509.000
|
$0.450
|
$0.600
|
$0.570
|
$0.630
|
$0.600
|
$0.600
|
$0.470
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
44,815.000
|
$1.000
|
$1.250
|
$1.250
|
$0.850
|
$0.700
|
$1.500
|
$0.690
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
17,332.000
|
$0.500
|
$1.250
|
$1.250
|
$0.850
|
$0.700
|
$1.500
|
$0.790
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
378.000
|
$0.900
|
$0.740
|
$0.700
|
$0.770
|
$0.750
|
$0.750
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,143.000
|
$3.000
|
$2.570
|
$2.440
|
$2.680
|
$2.650
|
$2.500
|
$2.630
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,125.000
|
$5.500
|
$5.250
|
$5.000
|
$5.500
|
$5.250
|
$5.200
|
$5.250
|
|
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
3.000
|
$120.000
|
$117.000
|
$111.000
|
$120.000
|
$120.000
|
$115.000
|
$99.750
|
|
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
3.000
|
$235.000
|
$198.000
|
$188.000
|
$200.000
|
$200.000
|
$195.000
|
$131.250
|
|
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
3.000
|
$150.000
|
$130.000
|
$124.000
|
$135.000
|
$135.000
|
$130.000
|
$131.250
|
|
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
14.000
|
$750.000
|
$900.000
|
$850.000
|
$925.000
|
$900.000
|
$880.000
|
$420.000
|
|
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
14.000
|
$650.000
|
$900.000
|
$850.000
|
$925.000
|
$900.000
|
$880.000
|
$420.000
|
|
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
6.000
|
$200.000
|
$420.000
|
$400.000
|
$440.000
|
$425.000
|
$415.000
|
$157.500
|
|
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
16.000
|
$35.000
|
$47.000
|
$44.000
|
$48.000
|
$50.000
|
$46.000
|
$26.250
|
|
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
249.000
|
$6.000
|
$5.250
|
$5.000
|
$5.500
|
$5.500
|
$5.200
|
$5.250
|
|
|
|
PAVEMENT SEALER 4"
|
LF
|
313.000
|
$0.150
|
$0.460
|
$0.440
|
$0.480
|
$0.500
|
$0.500
|
$0.160
|
|
|
|
PAVEMENT SEALER 6"
|
LF
|
386,921.000
|
$0.150
|
$0.180
|
$0.170
|
$0.190
|
$0.180
|
$0.200
|
$0.160
|
|
|
|
PAVEMENT SEALER 8"
|
LF
|
378.000
|
$0.300
|
$0.530
|
$0.500
|
$0.550
|
$0.550
|
$0.500
|
$0.320
|
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,143.000
|
$0.400
|
$1.150
|
$1.090
|
$1.200
|
$1.150
|
$1.100
|
$0.530
|
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,374.000
|
$2.500
|
$2.550
|
$2.440
|
$2.680
|
$2.600
|
$2.500
|
$1.050
|
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
3.000
|
$45.000
|
$66.000
|
$63.000
|
$65.000
|
$70.000
|
$65.000
|
$57.750
|
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
3.000
|
$45.000
|
$70.000
|
$67.000
|
$70.000
|
$75.000
|
$70.000
|
$68.250
|
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
3.000
|
$100.000
|
$116.000
|
$109.000
|
$110.000
|
$120.000
|
$114.000
|
$78.750
|
|
|
|
PAVEMENT SEALER (ENTR GORE)
|
EA
|
14.000
|
$450.000
|
$475.000
|
$450.000
|
$490.000
|
$475.000
|
$470.000
|
$157.500
|
|
|
|
PAVEMENT SEALER (EXIT GORE)
|
EA
|
14.000
|
$450.000
|
$475.000
|
$450.000
|
$490.000
|
$475.000
|
$470.000
|
$157.500
|
|
|
|
PAVEMENT SEALER (SYMBOL)
|
EA
|
6.000
|
$35.000
|
$126.000
|
$120.000
|
$130.000
|
$130.000
|
$125.000
|
$78.750
|
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
16.000
|
$16.000
|
$24.000
|
$22.000
|
$24.000
|
$25.000
|
$23.000
|
$10.500
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
313.000
|
$0.450
|
$0.520
|
$0.500
|
$0.550
|
$0.550
|
$0.520
|
$0.320
|
|
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
40,054.000
|
$0.600
|
$0.520
|
$0.500
|
$0.550
|
$0.530
|
$0.520
|
$0.370
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
174,205.000
|
$0.500
|
$0.500
|
$0.480
|
$0.530
|
$0.500
|
$0.500
|
$0.370
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
172,662.000
|
$0.500
|
$0.500
|
$0.480
|
$0.530
|
$0.500
|
$0.500
|
$0.370
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
18.000
|
$3.500
|
$5.250
|
$5.000
|
$5.500
|
$5.500
|
$5.200
|
$3.150
|
|
|
|
REFL PAV MRKR TY I-R
|
EA
|
224.000
|
$3.400
|
$5.250
|
$5.000
|
$5.500
|
$5.450
|
$5.200
|
$10.500
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,908.000
|
$3.750
|
$3.500
|
$3.330
|
$3.500
|
$3.500
|
$3.500
|
$4.200
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
37,450.000
|
$0.400
|
$0.500
|
$0.470
|
$0.520
|
$0.680
|
$0.500
|
$0.260
|
|
|
|
FULL - WIDTH MOWING
|
CYC
|
8.000
|
$2,900.000
|
$4,000.000
|
$4,000.000
|
$1,700.000
|
$1,750.000
|
$13,300.000
|
$3,150.000
|
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
22.000
|
$1,700.000
|
$3,000.000
|
$4,000.000
|
$1,320.000
|
$1,750.000
|
$2,180.000
|
$3,150.000
|
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
165.000
|
$80.000
|
$116.000
|
$90.000
|
$138.000
|
$135.000
|
$94.000
|
$94.500
|
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
3.000
|
$125.000
|
$475.000
|
$200.000
|
$247.000
|
$250.000
|
$210.000
|
$210.000
|
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
3.000
|
$215.000
|
$500.000
|
$500.000
|
$385.000
|
$400.000
|
$2,080.000
|
$525.000
|
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
3.000
|
$475.000
|
$2,940.000
|
$500.000
|
$3,270.000
|
$3,250.000
|
$520.000
|
$525.000
|
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
1,500.000
|
$1.000
|
$14.700
|
$6.000
|
$2.700
|
$2.750
|
$6.000
|
$6.300
|
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
11.000
|
$200.000
|
$1,155.000
|
$150.000
|
$550.000
|
$545.000
|
$156.000
|
$157.500
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$15,000.000
|
$7,036.250
|
$5,000.000
|
$15,000.000
|
$25,300.000
|
$15,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
571.000
|
$165.000
|
$200.000
|
$200.260
|
$25.000
|
$125.000
|
$210.000
|
$400.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
1,197.000
|
$130.000
|
$250.000
|
$108.250
|
$25.000
|
$75.000
|
$210.000
|
$400.000
|
|
1
|
|
MEMBRANE UNDERSEAL
|
GAL
|
227,868.000
|
$2.100
|
$3.000
|
$2.520
|
$2.500
|
$2.650
|
$4.000
|
$2.750
|
|
Totals: |
$14,773,289.180
|
$12,910,717.480
|
$13,842,968.540
|
$14,098,632.470
|
$14,391,682.100
|
$14,840,013.610
|
$15,649,249.735
|