PREPARING ROW
|
STA
|
160.000
|
$2,000.000
|
$136.440
|
$500.000
|
$250.000
|
$1,621.700
|
$815.000
|
$1,130.000
|
$1,002.560
|
$77.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
96.000
|
$20.850
|
$18.560
|
$100.000
|
$30.000
|
$14.000
|
$24.000
|
$36.000
|
$181.000
|
$60.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
45,661.000
|
$3.500
|
$2.520
|
$4.500
|
$2.600
|
$1.440
|
$3.000
|
$2.450
|
$2.100
|
$4.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,290.000
|
$13.750
|
$10.380
|
$20.000
|
$13.400
|
$23.600
|
$21.000
|
$14.300
|
$24.000
|
$22.190
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
55.000
|
$17.000
|
$58.660
|
$150.000
|
$56.000
|
$192.500
|
$30.000
|
$31.000
|
$180.000
|
$150.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
4,992.000
|
$35.150
|
$8.080
|
$16.000
|
$16.600
|
$16.400
|
$11.000
|
$44.700
|
$33.000
|
$34.120
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
30.000
|
$20.000
|
$53.540
|
$25.000
|
$34.400
|
$216.500
|
$28.000
|
$69.600
|
$360.000
|
$80.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
79,628.000
|
$1.170
|
$1.750
|
$0.500
|
$1.150
|
$1.200
|
$0.800
|
$1.600
|
$2.450
|
$3.250
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
79,628.000
|
$0.280
|
$0.320
|
$0.220
|
$0.290
|
$0.290
|
$0.320
|
$0.310
|
$0.290
|
$0.200
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
79,628.000
|
$0.170
|
$0.240
|
$0.110
|
$0.220
|
$0.220
|
$0.240
|
$0.230
|
$0.220
|
$0.130
|
|
|
VEGETATIVE WATERING
|
MG
|
1,242.000
|
$22.250
|
$17.990
|
$15.000
|
$24.000
|
$21.000
|
$30.000
|
$27.100
|
$33.000
|
$30.000
|
|
|
PROOF ROLLING
|
HR
|
16.000
|
$160.000
|
$77.170
|
$100.000
|
$140.000
|
$237.600
|
$120.000
|
$82.500
|
$210.000
|
$150.000
|
|
|
FLBS (CMP IN PLC)(TY D GR 1-2 OR 5)(8")
|
SY
|
64,963.000
|
$17.200
|
$13.410
|
$15.000
|
$15.250
|
$15.850
|
$16.000
|
$18.150
|
$16.300
|
$19.100
|
|
|
REWORK BS MTL (TY C)(4")(ORD COMP)
|
SY
|
66,710.000
|
$2.000
|
$0.590
|
$1.000
|
$1.840
|
$1.560
|
$2.600
|
$1.000
|
$2.000
|
$1.130
|
|
|
CEMENT
|
TON
|
991.000
|
$235.000
|
$256.770
|
$205.000
|
$229.000
|
$236.500
|
$210.000
|
$267.000
|
$250.000
|
$210.340
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
66,710.000
|
$2.000
|
$1.860
|
$1.300
|
$2.750
|
$2.700
|
$3.000
|
$1.880
|
$3.000
|
$4.770
|
|
|
ASPH (RC-250)
|
GAL
|
12,993.000
|
$6.720
|
$6.030
|
$5.000
|
$4.500
|
$6.460
|
$5.000
|
$4.700
|
$4.450
|
$5.000
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
464.000
|
$146.000
|
$120.470
|
$150.000
|
$111.000
|
$95.780
|
$125.000
|
$100.000
|
$95.000
|
$98.000
|
|
|
CEM STABIL BKFL
|
CY
|
75.000
|
$325.000
|
$142.090
|
$200.000
|
$150.000
|
$208.850
|
$128.000
|
$134.000
|
$260.000
|
$225.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
25.000
|
$350.000
|
$175.270
|
$250.000
|
$150.000
|
$251.690
|
$166.000
|
$175.000
|
$280.000
|
$525.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
86.000
|
$425.000
|
$656.590
|
$550.000
|
$480.000
|
$530.150
|
$530.000
|
$558.000
|
$550.000
|
$900.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
70.000
|
$150.000
|
$213.500
|
$160.000
|
$300.000
|
$276.260
|
$205.000
|
$215.000
|
$580.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
20.000
|
$585.000
|
$924.810
|
$575.000
|
$900.000
|
$583.700
|
$550.000
|
$579.000
|
$590.000
|
$900.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
14.000
|
$110.000
|
$279.250
|
$130.000
|
$165.000
|
$133.880
|
$122.000
|
$129.000
|
$460.000
|
$150.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
52.000
|
$320.000
|
$441.320
|
$400.000
|
$450.000
|
$455.180
|
$415.000
|
$438.000
|
$820.000
|
$800.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
101.000
|
$350.000
|
$525.940
|
$475.000
|
$600.000
|
$581.560
|
$450.000
|
$473.000
|
$730.000
|
$900.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
388.000
|
$47.030
|
$104.290
|
$100.000
|
$95.000
|
$95.320
|
$80.000
|
$84.700
|
$150.000
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
17.000
|
$98.000
|
$243.180
|
$120.000
|
$375.000
|
$131.740
|
$106.000
|
$112.000
|
$450.000
|
$220.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
58.000
|
$118.000
|
$154.480
|
$150.000
|
$400.000
|
$166.010
|
$138.000
|
$145.000
|
$500.000
|
$300.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
47.000
|
$147.000
|
$254.450
|
$200.000
|
$700.000
|
$192.780
|
$190.000
|
$201.000
|
$590.000
|
$365.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
66.000
|
$309.250
|
$334.010
|
$300.000
|
$700.000
|
$262.400
|
$294.000
|
$309.000
|
$600.000
|
$455.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
2.000
|
$7,130.000
|
$8,635.870
|
$10,000.000
|
$8,300.000
|
$4,819.580
|
$7,560.000
|
$7,960.000
|
$15,000.000
|
$8,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
3.000
|
$7,375.000
|
$8,792.630
|
$10,500.000
|
$7,000.000
|
$5,033.790
|
$7,460.000
|
$7,860.000
|
$9,400.000
|
$9,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$3,362.000
|
$9,418.660
|
$9,000.000
|
$6,500.000
|
$5,033.790
|
$7,830.000
|
$8,250.000
|
$9,600.000
|
$11,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$2,013.410
|
$1,366.420
|
$2,500.000
|
$1,700.000
|
$1,670.790
|
$1,630.000
|
$1,720.000
|
$3,300.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$1,661.420
|
$2,000.000
|
$2,000.000
|
$2,088.490
|
$1,740.000
|
$1,830.000
|
$3,600.000
|
$1,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$4,088.000
|
$2,419.470
|
$3,200.000
|
$3,000.000
|
$2,570.440
|
$2,440.000
|
$2,570.000
|
$3,900.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
10.000
|
$4,200.000
|
$4,356.160
|
$5,000.000
|
$3,500.000
|
$3,105.950
|
$3,500.000
|
$3,690.000
|
$5,000.000
|
$4,500.000
|
|
|
SET (TY II) (DES 3) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$3,200.000
|
$4,488.950
|
$2,500.000
|
$1,800.000
|
$2,249.140
|
$1,472.000
|
$1,550.000
|
$3,600.000
|
$3,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$2,500.000
|
$2,181.280
|
$3,000.000
|
$1,500.000
|
$2,677.550
|
$3,330.000
|
$3,510.000
|
$4,200.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
178.000
|
$26.000
|
$19.280
|
$25.000
|
$35.000
|
$23.560
|
$111.000
|
$117.000
|
$25.000
|
$80.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$441,838.940
|
$253,273.600
|
$425,000.000
|
$430,490.000
|
$418,612.730
|
$475,000.000
|
$400,000.000
|
$529,352.600
|
$410,450.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$3,000.000
|
$1,052.690
|
$10,000.000
|
$7,000.000
|
$2,839.030
|
$1,880.000
|
$5,650.000
|
$12,000.000
|
$5,858.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
320.000
|
$49.000
|
$35.440
|
$25.000
|
$33.200
|
$33.200
|
$37.000
|
$35.100
|
$33.000
|
$24.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
320.000
|
$11.500
|
$8.260
|
$10.000
|
$6.500
|
$6.480
|
$7.000
|
$6.900
|
$6.500
|
$6.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
156.000
|
$29.000
|
$52.440
|
$15.000
|
$48.800
|
$48.800
|
$54.000
|
$51.600
|
$49.000
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$2.800
|
$21.780
|
$10.000
|
$19.600
|
$19.600
|
$22.000
|
$20.700
|
$19.500
|
$20.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
8.000
|
$77.000
|
$87.320
|
$150.000
|
$117.000
|
$211.200
|
$80.000
|
$141.000
|
$119.000
|
$100.000
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
8.000
|
$81.250
|
$112.870
|
$200.000
|
$117.000
|
$211.200
|
$80.000
|
$186.000
|
$135.000
|
$150.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
15,227.000
|
$2.350
|
$3.540
|
$2.500
|
$3.250
|
$3.250
|
$3.600
|
$3.450
|
$3.250
|
$2.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
15,227.000
|
$0.750
|
$0.320
|
$0.750
|
$0.250
|
$0.250
|
$0.300
|
$0.260
|
$0.250
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
400.000
|
$6.100
|
$5.980
|
$6.000
|
$5.250
|
$5.250
|
$6.000
|
$5.600
|
$5.250
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
400.000
|
$1.000
|
$1.280
|
$1.000
|
$1.000
|
$1.000
|
$1.100
|
$1.050
|
$1.000
|
$0.500
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
48.000
|
$150.000
|
$73.840
|
$125.000
|
$80.000
|
$211.200
|
$140.000
|
$72.300
|
$210.000
|
$125.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,188.000
|
$84.000
|
$46.500
|
$60.000
|
$65.000
|
$41.400
|
$75.000
|
$83.200
|
$68.000
|
$46.150
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
31,491.000
|
$0.250
|
$0.190
|
$0.200
|
$0.170
|
$0.310
|
$0.250
|
$0.110
|
$0.100
|
$0.210
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
15,756.000
|
$0.250
|
$0.270
|
$0.250
|
$0.250
|
$0.340
|
$0.250
|
$0.110
|
$0.100
|
$0.240
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$29.200
|
$26.560
|
$30.000
|
$26.500
|
$28.360
|
$33.000
|
$27.900
|
$30.000
|
$26.350
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,272.000
|
$2,356.670
|
$3,500.000
|
$3,225.000
|
$3,469.910
|
$3,820.000
|
$3,400.000
|
$3,400.000
|
$3,220.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
10.000
|
$430.000
|
$298.080
|
$400.000
|
$275.000
|
$350.000
|
$940.000
|
$370.000
|
$280.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
18.000
|
$595.000
|
$665.580
|
$750.000
|
$625.000
|
$725.000
|
$800.000
|
$766.000
|
$630.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$770.000
|
$865.080
|
$850.000
|
$815.000
|
$835.000
|
$926.000
|
$882.000
|
$820.000
|
$835.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,090.000
|
$980.580
|
$1,100.000
|
$925.000
|
$1,025.000
|
$1,140.000
|
$1,080.000
|
$930.000
|
$1,025.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,465.000
|
$1,111.830
|
$1,400.000
|
$1,050.000
|
$1,250.000
|
$1,380.000
|
$1,320.000
|
$1,050.000
|
$1,250.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
1.000
|
$1,465.000
|
$1,269.330
|
$1,300.000
|
$1,200.000
|
$1,150.000
|
$1,280.000
|
$1,220.000
|
$1,200.000
|
$1,150.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$130.000
|
$135.330
|
$100.000
|
$120.000
|
$80.000
|
$90.000
|
$84.500
|
$120.000
|
$80.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
16.000
|
$82.000
|
$77.580
|
$100.000
|
$65.000
|
$90.000
|
$100.000
|
$95.100
|
$65.000
|
$90.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
2.000
|
$345.000
|
$403.080
|
$500.000
|
$375.000
|
$475.000
|
$530.000
|
$502.000
|
$380.000
|
$475.000
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
2.000
|
$345.000
|
$403.080
|
$500.000
|
$375.000
|
$475.000
|
$530.000
|
$502.000
|
$380.000
|
$475.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$33.000
|
$35.580
|
$40.000
|
$40.000
|
$35.000
|
$38.000
|
$37.000
|
$25.000
|
$40.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
16,196.000
|
$0.650
|
$0.880
|
$0.850
|
$0.850
|
$0.850
|
$1.000
|
$0.900
|
$0.830
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
94.000
|
$5.550
|
$13.310
|
$12.000
|
$12.000
|
$12.000
|
$13.000
|
$12.700
|
$11.000
|
$9.800
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
1,800.000
|
$0.850
|
$0.990
|
$0.850
|
$0.850
|
$0.850
|
$1.000
|
$0.900
|
$0.890
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,415.000
|
$0.650
|
$0.900
|
$0.850
|
$0.850
|
$0.850
|
$1.000
|
$0.900
|
$0.830
|
$0.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,257.000
|
$2.000
|
$1.550
|
$0.500
|
$1.100
|
$1.600
|
$1.500
|
$1.550
|
$2.500
|
$1.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,344.000
|
$2.000
|
$1.730
|
$0.500
|
$1.100
|
$1.600
|
$1.500
|
$1.550
|
$2.500
|
$1.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,389.000
|
$1.750
|
$1.690
|
$0.500
|
$1.200
|
$1.600
|
$1.500
|
$1.550
|
$2.500
|
$1.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
304.000
|
$1.250
|
$1.900
|
$1.000
|
$0.880
|
$0.880
|
$1.000
|
$0.930
|
$1.200
|
$2.800
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
22.000
|
$10.000
|
$13.550
|
$17.000
|
$16.000
|
$16.000
|
$18.000
|
$16.900
|
$8.850
|
$9.800
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$200.000
|
$202.340
|
$175.000
|
$150.000
|
$150.000
|
$166.000
|
$159.000
|
$148.000
|
$160.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$200.000
|
$234.620
|
$250.000
|
$225.000
|
$225.000
|
$250.000
|
$238.000
|
$179.000
|
$160.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
41,429.000
|
$0.240
|
$0.450
|
$0.200
|
$0.180
|
$0.180
|
$0.200
|
$0.190
|
$0.420
|
$0.350
|
|
|
PAVEMENT SEALER 8"
|
LF
|
304.000
|
$0.600
|
$1.420
|
$0.300
|
$0.300
|
$0.300
|
$0.330
|
$0.320
|
$0.770
|
$0.900
|
|
|
PAVEMENT SEALER 24"
|
LF
|
22.000
|
$3.000
|
$8.910
|
$6.000
|
$6.000
|
$6.000
|
$7.000
|
$6.300
|
$4.450
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$72.000
|
$121.540
|
$65.000
|
$65.000
|
$65.000
|
$72.000
|
$68.700
|
$71.000
|
$60.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$72.000
|
$135.870
|
$85.000
|
$85.000
|
$85.000
|
$95.000
|
$89.800
|
$85.000
|
$60.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
31,571.000
|
$0.650
|
$0.810
|
$0.700
|
$0.670
|
$0.670
|
$0.750
|
$0.710
|
$0.760
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
3,380.000
|
$0.720
|
$0.830
|
$0.700
|
$0.660
|
$0.660
|
$0.750
|
$0.700
|
$0.760
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
6,478.000
|
$0.720
|
$0.810
|
$0.700
|
$0.660
|
$0.660
|
$0.750
|
$0.700
|
$0.760
|
$0.450
|
|
REFL PAV MRKR TY I-C
|
EA
|
16.000
|
$6.500
|
$13.160
|
$5.000
|
$4.500
|
$4.500
|
$5.000
|
$4.750
|
$7.000
|
$3.800
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
244.000
|
$6.500
|
$5.040
|
$4.000
|
$3.850
|
$3.850
|
$4.000
|
$4.050
|
$4.450
|
$3.800
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$4,267.390
|
$2,019.780
|
$1,500.000
|
$2,150.000
|
$2,800.000
|
$2,500.000
|
$4,860.000
|
$3,100.000
|
$6,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$1,415.500
|
$3,388.620
|
$2,000.000
|
$1,723.000
|
$2,281.820
|
$1,740.000
|
$3,670.000
|
$1,290.000
|
$2,000.000
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
10,904.000
|
$186.000
|
$101.960
|
$100.000
|
$101.000
|
$114.000
|
$113.000
|
$107.000
|
$101.000
|
$117.680
|
|
|
TACK COAT
|
GAL
|
6,516.000
|
$1.760
|
$3.970
|
$3.250
|
$3.000
|
$3.540
|
$4.300
|
$3.150
|
$3.000
|
$3.300
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$14,600.000
|
$14,898.460
|
$25,000.000
|
$6,200.000
|
$11,255.090
|
$8,000.000
|
$9,610.000
|
$30,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
18.000
|
$250.000
|
$293.540
|
$250.000
|
$200.000
|
$243.560
|
$175.000
|
$125.000
|
$470.000
|
$250.000
|
|
Totals: |
$5,877,527.340
|
$4,025,335.990
|
$4,397,598.340
|
$4,481,247.240
|
$4,761,338.900
|
$4,795,771.800
|
$4,920,023.380
|
$5,346,995.760
|
$5,382,213.960
|