|
|
PREPARING ROW
|
STA
|
86.000
|
$3,000.000
|
$570.000
|
$1,136.160
|
$600.000
|
$200.000
|
$3,400.000
|
$4,017.840
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
146.000
|
$25.000
|
$13.000
|
$16.650
|
$10.000
|
$19.000
|
$16.000
|
$9.660
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,402.000
|
$15.000
|
$10.500
|
$15.690
|
$15.000
|
$16.000
|
$10.000
|
$17.420
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
24,627.000
|
$15.000
|
$11.390
|
$15.420
|
$15.000
|
$18.000
|
$20.000
|
$12.750
|
|
|
BLADING
|
HR
|
399.000
|
$100.000
|
$80.000
|
$96.900
|
$125.000
|
$115.000
|
$100.000
|
$121.040
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
266,618.000
|
$0.350
|
$0.270
|
$0.270
|
$0.300
|
$0.300
|
$0.300
|
$0.330
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
66,668.000
|
$0.350
|
$0.250
|
$0.250
|
$0.300
|
$0.250
|
$0.290
|
$0.310
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
66,668.000
|
$0.350
|
$0.250
|
$0.250
|
$0.300
|
$0.250
|
$0.290
|
$0.310
|
|
|
VEGETATIVE WATERING
|
MG
|
2,247.000
|
$20.000
|
$18.000
|
$13.320
|
$5.000
|
$27.000
|
$15.000
|
$27.040
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
58,597.000
|
$74.000
|
$79.660
|
$69.650
|
$70.000
|
$80.000
|
$75.500
|
$82.100
|
|
|
FL BS (RDWY DEL) (TY E GR 1-2)
|
TON
|
1,634.000
|
$55.000
|
$51.570
|
$34.320
|
$40.000
|
$34.000
|
$40.000
|
$39.750
|
|
|
CEMENT
|
TON
|
2,561.000
|
$150.000
|
$130.000
|
$136.500
|
$148.000
|
$140.000
|
$140.000
|
$156.370
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
281,285.000
|
$1.500
|
$1.840
|
$2.050
|
$2.500
|
$1.150
|
$2.000
|
$3.700
|
|
|
ASPH (RC-250)
|
GAL
|
49,195.000
|
$4.000
|
$3.840
|
$4.060
|
$3.500
|
$3.450
|
$3.700
|
$4.920
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
1,754.000
|
$140.000
|
$102.290
|
$76.690
|
$115.000
|
$122.000
|
$130.000
|
$110.770
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
2,897.000
|
$120.000
|
$106.100
|
$82.570
|
$105.000
|
$119.000
|
$95.000
|
$124.310
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
1,895.000
|
$120.000
|
$107.160
|
$82.580
|
$95.000
|
$89.000
|
$100.000
|
$124.310
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
182,190.000
|
$3.100
|
$3.340
|
$3.170
|
$3.000
|
$2.550
|
$3.000
|
$4.180
|
|
|
CEM STABIL BKFL
|
CY
|
302.000
|
$115.000
|
$100.000
|
$110.250
|
$120.000
|
$110.000
|
$100.000
|
$68.680
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
13.000
|
$600.000
|
$450.000
|
$496.110
|
$460.000
|
$550.000
|
$450.000
|
$400.010
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
48.000
|
$150.000
|
$100.000
|
$110.250
|
$145.000
|
$195.000
|
$100.000
|
$238.590
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
52.000
|
$400.000
|
$550.000
|
$606.360
|
$460.000
|
$550.000
|
$550.000
|
$861.750
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
100.000
|
$75.000
|
$45.000
|
$49.610
|
$65.000
|
$78.000
|
$45.000
|
$292.660
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
28.000
|
$95.000
|
$85.000
|
$93.710
|
$70.000
|
$83.000
|
$85.000
|
$187.330
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
3.000
|
$1,400.000
|
$600.000
|
$661.480
|
$600.000
|
$1,100.000
|
$600.000
|
$1,511.360
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
7.000
|
$1,450.000
|
$650.000
|
$716.610
|
$700.000
|
$725.000
|
$650.000
|
$1,376.050
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
40.000
|
$1,400.000
|
$850.000
|
$937.100
|
$800.000
|
$400.000
|
$850.000
|
$1,099.800
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
8.000
|
$85.000
|
$45.000
|
$49.610
|
$55.000
|
$220.000
|
$45.000
|
$292.110
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,324.000
|
$60.000
|
$48.000
|
$52.920
|
$60.000
|
$120.000
|
$48.000
|
$161.660
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
138.000
|
$85.000
|
$90.000
|
$99.220
|
$80.000
|
$175.000
|
$90.000
|
$234.670
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
21.000
|
$120.000
|
$130.000
|
$143.320
|
$100.000
|
$200.000
|
$130.000
|
$216.640
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
32.000
|
$350.000
|
$165.000
|
$181.910
|
$130.000
|
$240.000
|
$165.000
|
$276.770
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
50.000
|
$375.000
|
$200.000
|
$220.490
|
$200.000
|
$375.000
|
$200.000
|
$424.200
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
1.000
|
$4,000.000
|
$3,000.000
|
$3,307.420
|
$2,800.000
|
$9,800.000
|
$3,000.000
|
$4,738.530
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
3.000
|
$5,000.000
|
$4,000.000
|
$4,409.890
|
$3,300.000
|
$10,250.000
|
$4,000.000
|
$5,538.540
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$6,500.000
|
$7,000.000
|
$7,717.310
|
$5,100.000
|
$13,000.000
|
$7,000.000
|
$7,015.480
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$8,500.000
|
$7,500.000
|
$8,268.550
|
$5,400.000
|
$15,750.000
|
$7,500.000
|
$5,969.310
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$12,000.000
|
$13,000.000
|
$14,332.150
|
$10,900.000
|
$21,000.000
|
$13,000.000
|
$9,292.440
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$15,000.000
|
$18,000.000
|
$19,844.520
|
$17,500.000
|
$24,000.000
|
$18,000.000
|
$19,446.420
|
|
|
HEADWALL (CH - PW - 0)(DIA= 24 IN)(MOD)
|
EA
|
1.000
|
$10,000.000
|
$4,500.000
|
$4,961.130
|
$5,300.000
|
$13,500.000
|
$4,500.000
|
$9,292.440
|
|
|
HEADWALL (CH - PW - S)(DIA= 30 IN)(MOD)
|
EA
|
1.000
|
$12,500.000
|
$6,500.000
|
$7,166.080
|
$8,600.000
|
$13,000.000
|
$6,500.000
|
$9,600.130
|
|
|
HEADWALL (CH-PW-S)(DIA = 24 IN)(MOD)
|
EA
|
1.000
|
$11,500.000
|
$5,000.000
|
$5,512.370
|
$9,000.000
|
$15,000.000
|
$5,000.000
|
$7,261.640
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
6.000
|
$6,500.000
|
$7,500.000
|
$8,268.550
|
$5,500.000
|
$8,100.000
|
$7,500.000
|
$24,120.950
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$8,000.000
|
$9,500.000
|
$10,473.500
|
$6,400.000
|
$13,000.000
|
$9,500.000
|
$26,879.140
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,000.000
|
$850.000
|
$937.100
|
$625.000
|
$1,850.000
|
$850.000
|
$1,316.940
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
62.000
|
$1,200.000
|
$950.000
|
$1,047.350
|
$750.000
|
$1,075.000
|
$950.000
|
$1,156.940
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
35.000
|
$1,250.000
|
$900.000
|
$992.230
|
$700.000
|
$1,275.000
|
$900.000
|
$1,231.490
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
191.000
|
$1,350.000
|
$950.000
|
$1,047.350
|
$900.000
|
$1,400.000
|
$950.000
|
$1,464.060
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
14.000
|
$1,400.000
|
$1,200.000
|
$1,322.970
|
$950.000
|
$1,300.000
|
$1,200.000
|
$1,217.250
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
30.000
|
$1,500.000
|
$1,000.000
|
$1,102.470
|
$1,000.000
|
$1,550.000
|
$1,000.000
|
$1,596.950
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
22.000
|
$1,750.000
|
$1,200.000
|
$1,322.970
|
$1,200.000
|
$1,675.000
|
$1,200.000
|
$1,596.950
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,200.000
|
$2,000.000
|
$2,204.950
|
$1,450.000
|
$2,900.370
|
$2,000.000
|
$1,993.870
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,600.000
|
$3,000.000
|
$3,307.420
|
$1,950.000
|
$5,000.000
|
$3,000.000
|
$2,283.720
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
14.000
|
$5,000.000
|
$4,000.000
|
$4,409.890
|
$3,950.000
|
$7,400.000
|
$4,000.000
|
$4,201.290
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
20.000
|
$1,000.000
|
$2,000.000
|
$2,204.950
|
$1,600.000
|
$1,100.000
|
$2,000.000
|
$369.240
|
|
|
REMOV STR (SMALL)
|
EA
|
27.000
|
$1,250.000
|
$750.000
|
$826.850
|
$350.000
|
$400.000
|
$750.000
|
$576.520
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,012,000.000
|
$432,800.000
|
$887,775.240
|
$952,250.000
|
$900,000.000
|
$1,000,000.000
|
$164,666.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$5,000.000
|
$2,895.000
|
$3,396.210
|
$2,500.000
|
$3,300.000
|
$10,000.000
|
$9,582.310
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
260.000
|
$30.000
|
$31.960
|
$31.960
|
$25.000
|
$34.000
|
$26.000
|
$39.340
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
260.000
|
$10.000
|
$11.110
|
$11.110
|
$5.000
|
$12.000
|
$10.000
|
$13.670
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
58,849.000
|
$3.000
|
$2.090
|
$2.090
|
$3.000
|
$2.250
|
$2.750
|
$2.570
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
58,849.000
|
$1.000
|
$0.400
|
$0.400
|
$0.500
|
$0.500
|
$0.250
|
$0.490
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
5,602.000
|
$40.000
|
$21.840
|
$35.040
|
$22.000
|
$19.000
|
$40.000
|
$31.680
|
|
|
DRIVEWAYS (CONC)
|
SY
|
123.000
|
$100.000
|
$100.000
|
$105.000
|
$82.000
|
$115.000
|
$100.000
|
$73.850
|
|
|
DRIVEWAYS (ACP)
|
SY
|
317.000
|
$60.000
|
$99.020
|
$52.380
|
$42.000
|
$40.000
|
$90.000
|
$49.880
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
5,336.000
|
$35.000
|
$28.760
|
$30.660
|
$26.000
|
$18.000
|
$40.000
|
$31.680
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
1,810.000
|
$40.000
|
$38.920
|
$30.660
|
$22.000
|
$19.000
|
$40.000
|
$31.680
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
700.000
|
$25.000
|
$17.000
|
$19.980
|
$23.000
|
$23.250
|
$18.000
|
$20.920
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,400.000
|
$2,576.000
|
$3,400.000
|
$2,375.000
|
$2,400.000
|
$2,923.120
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$300.000
|
$300.000
|
$300.000
|
$425.000
|
$325.000
|
$300.000
|
$510.780
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
61.000
|
$200.000
|
$125.000
|
$125.000
|
$190.000
|
$135.000
|
$120.000
|
$227.700
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
11.000
|
$250.000
|
$160.000
|
$160.000
|
$260.000
|
$175.000
|
$160.000
|
$295.390
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$550.000
|
$405.000
|
$405.000
|
$350.000
|
$450.000
|
$400.000
|
$406.160
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$650.000
|
$520.000
|
$520.000
|
$530.000
|
$550.000
|
$520.000
|
$633.850
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$700.000
|
$495.000
|
$495.000
|
$550.000
|
$550.000
|
$510.000
|
$640.010
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
4.000
|
$800.000
|
$735.000
|
$735.000
|
$875.000
|
$800.000
|
$720.000
|
$1,040.010
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
33.000
|
$300.000
|
$265.000
|
$265.000
|
$250.000
|
$300.000
|
$270.000
|
$283.080
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
23.000
|
$350.000
|
$325.000
|
$325.000
|
$320.000
|
$350.000
|
$318.000
|
$356.930
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
74.000
|
$75.000
|
$50.000
|
$50.000
|
$70.000
|
$80.000
|
$80.000
|
$73.850
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
92.000
|
$85.000
|
$55.000
|
$55.000
|
$55.000
|
$60.000
|
$50.000
|
$59.080
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$75.000
|
$28.000
|
$28.000
|
$32.000
|
$30.000
|
$27.000
|
$34.460
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
156,378.000
|
$0.350
|
$0.140
|
$0.200
|
$0.220
|
$0.250
|
$0.200
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
12,660.000
|
$0.350
|
$0.160
|
$0.250
|
$0.280
|
$0.300
|
$0.250
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
98,422.000
|
$0.350
|
$0.140
|
$0.200
|
$0.220
|
$0.250
|
$0.200
|
$0.140
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
17,886.000
|
$1.500
|
$1.500
|
$1.800
|
$1.000
|
$0.500
|
$1.000
|
$2.770
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
4,380.000
|
$0.500
|
$0.360
|
$0.350
|
$0.380
|
$0.400
|
$0.350
|
$1.050
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
4,216.000
|
$0.500
|
$0.360
|
$0.350
|
$0.380
|
$0.400
|
$0.350
|
$1.050
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
151,563.000
|
$0.800
|
$0.580
|
$0.500
|
$0.550
|
$0.600
|
$0.500
|
$0.650
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
12,586.000
|
$0.800
|
$0.650
|
$0.500
|
$0.550
|
$0.600
|
$0.500
|
$0.680
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
92,657.000
|
$0.800
|
$0.600
|
$0.500
|
$0.550
|
$0.650
|
$0.500
|
$0.650
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
72.000
|
$15.000
|
$14.400
|
$12.000
|
$12.500
|
$16.000
|
$12.000
|
$39.390
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,843.000
|
$4.500
|
$3.200
|
$4.000
|
$4.500
|
$4.000
|
$4.000
|
$4.800
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$17,500.000
|
$7,739.030
|
$7,500.000
|
$10,000.000
|
$15,000.000
|
$28,308.080
|
|
|
TMA (STATIONARY)
|
DAY
|
15.000
|
$250.000
|
$500.000
|
$361.150
|
$250.000
|
$225.000
|
$500.000
|
$292.930
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$350.000
|
$300.000
|
$877.090
|
$350.000
|
$100.000
|
$500.000
|
$356.930
|
|
Totals: |
$11,229,045.700
|
$9,952,579.140
|
$10,034,801.520
|
$10,087,587.780
|
$10,646,063.110
|
$11,047,097.440
|
$11,962,350.750
|