|
|
PREPARING ROW
|
STA
|
16.000
|
$2,500.000
|
$4,000.000
|
$1,600.000
|
$1,092.050
|
$4,500.000
|
$5,000.000
|
$2,800.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,529.000
|
$10.000
|
$12.000
|
$12.000
|
$30.350
|
$10.000
|
$10.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
10,705.000
|
$10.000
|
$11.500
|
$17.000
|
$20.000
|
$16.750
|
$15.000
|
$20.000
|
|
|
BLADING
|
HR
|
16.000
|
$85.000
|
$100.000
|
$65.000
|
$132.570
|
$100.000
|
$30.000
|
$60.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
19,212.000
|
$0.500
|
$0.250
|
$0.300
|
$0.310
|
$0.350
|
$0.300
|
$0.500
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
4,803.000
|
$0.500
|
$0.220
|
$0.300
|
$0.270
|
$0.350
|
$0.300
|
$1.000
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
4,803.000
|
$0.500
|
$0.220
|
$0.300
|
$0.270
|
$0.350
|
$0.300
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
539.100
|
$25.000
|
$6.500
|
$14.000
|
$10.000
|
$28.000
|
$20.000
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
2,038.900
|
$60.000
|
$82.000
|
$78.000
|
$58.420
|
$76.600
|
$80.000
|
$60.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
7,610.400
|
$3.000
|
$2.600
|
$3.900
|
$3.580
|
$4.900
|
$2.000
|
$6.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
90.800
|
$165.000
|
$154.000
|
$185.000
|
$204.380
|
$172.000
|
$150.000
|
$200.000
|
|
|
ASPH (RC-250)
|
GAL
|
1,388.200
|
$5.000
|
$6.700
|
$12.000
|
$13.870
|
$6.000
|
$7.000
|
$8.000
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
47.900
|
$120.000
|
$280.000
|
$250.000
|
$284.900
|
$155.000
|
$120.000
|
$300.000
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
177.000
|
$100.000
|
$145.000
|
$160.000
|
$184.070
|
$140.000
|
$150.000
|
$300.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
6,118.000
|
$3.000
|
$3.500
|
$7.350
|
$8.360
|
$4.280
|
$5.000
|
$7.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
707.500
|
$80.000
|
$91.000
|
$109.000
|
$123.710
|
$87.500
|
$150.000
|
$220.000
|
|
|
D-GR HMA TY-D PG64-22(LEVEL-UP)
|
TON
|
43.500
|
$100.000
|
$140.000
|
$275.000
|
$312.150
|
$330.000
|
$150.000
|
$300.000
|
|
|
CEM STABIL BKFL
|
CY
|
189.000
|
$100.000
|
$120.000
|
$45.000
|
$122.190
|
$77.000
|
$50.000
|
$200.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
1,328.000
|
$95.000
|
$94.000
|
$103.000
|
$106.990
|
$97.000
|
$190.000
|
$120.000
|
|
|
PRESTR CONC PIL (24 IN SQ)
|
LF
|
966.000
|
$125.000
|
$107.000
|
$120.000
|
$155.330
|
$148.000
|
$200.000
|
$130.000
|
|
|
CL C CONC (ABUT)
|
CY
|
54.600
|
$825.000
|
$800.000
|
$900.000
|
$929.010
|
$735.000
|
$1,500.000
|
$1,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
37.800
|
$900.000
|
$800.000
|
$1,100.000
|
$1,486.420
|
$1,150.000
|
$1,500.000
|
$1,200.000
|
|
|
REINF CONC SLAB
|
SF
|
9,870.000
|
$16.000
|
$16.000
|
$17.500
|
$18.350
|
$19.000
|
$12.000
|
$22.000
|
|
|
APPROACH SLAB
|
CY
|
64.200
|
$500.000
|
$550.000
|
$615.000
|
$743.210
|
$661.000
|
$900.000
|
$600.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,451.000
|
$135.000
|
$140.000
|
$162.000
|
$150.540
|
$162.000
|
$190.000
|
$180.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
30.000
|
$125.000
|
$180.000
|
$176.000
|
$105.310
|
$226.000
|
$120.000
|
$120.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,150.000
|
$100.000
|
$130.000
|
$170.000
|
$105.310
|
$196.000
|
$80.000
|
$120.000
|
|
|
RAIL (TY T223)
|
LF
|
526.000
|
$110.000
|
$85.000
|
$82.000
|
$132.640
|
$95.000
|
$80.000
|
$110.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
76.000
|
$100.000
|
$85.000
|
$52.000
|
$80.010
|
$79.000
|
$38.450
|
$100.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
117.000
|
$150.000
|
$160.000
|
$210.000
|
$123.870
|
$235.000
|
$150.000
|
$80.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$3,000.000
|
$2,800.000
|
$3,300.000
|
$3,096.700
|
$3,900.000
|
$2,100.000
|
$3,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$85,000.000
|
$25,000.000
|
$52,000.000
|
$40,015.550
|
$77,000.000
|
$40,000.000
|
$60,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$150,000.000
|
$136,000.000
|
$200,000.000
|
$200,000.000
|
$139,100.000
|
$200,000.000
|
$186,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$2,500.000
|
$3,000.000
|
$800.000
|
$548.920
|
$890.000
|
$2,000.000
|
$4,600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
130.000
|
$28.000
|
$29.000
|
$33.000
|
$29.730
|
$26.000
|
$30.000
|
$20.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
130.000
|
$10.000
|
$7.000
|
$7.000
|
$9.910
|
$8.700
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,523.000
|
$3.000
|
$2.500
|
$3.000
|
$3.410
|
$3.000
|
$4.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,523.000
|
$1.000
|
$0.500
|
$1.000
|
$0.930
|
$0.820
|
$1.000
|
$1.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
360.000
|
$25.000
|
$33.000
|
$75.000
|
$37.630
|
$12.790
|
$65.000
|
$60.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
360.000
|
$10.000
|
$23.000
|
$17.000
|
$17.130
|
$12.790
|
$15.000
|
$20.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
397.000
|
$18.000
|
$42.000
|
$87.000
|
$33.570
|
$68.000
|
$50.000
|
$40.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$24.000
|
$21.000
|
$22.000
|
$24.590
|
$95.000
|
$25.000
|
$28.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
4.000
|
$1,600.000
|
$1,800.000
|
$1,800.000
|
$1,793.610
|
$2,825.000
|
$1,600.000
|
$1,800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$2.500
|
$3.000
|
$3.050
|
$3.720
|
$8.700
|
$5.000
|
$6.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,400.000
|
$2,800.000
|
$3,040.000
|
$3,400.180
|
$3,587.000
|
$2,480.000
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$100.000
|
$250.000
|
$278.000
|
$309.670
|
$435.000
|
$250.000
|
$400.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,200.000
|
$500.000
|
$1,400.000
|
$1,981.890
|
$5.000
|
$1,600.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$500.000
|
$500.000
|
$1,100.000
|
$771.960
|
$1,630.000
|
$800.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$7,500.000
|
$8,500.000
|
$4,374.370
|
$11,630.000
|
$8,600.000
|
$8,000.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$180.000
|
$250.000
|
$265.000
|
$296.660
|
$380.000
|
$350.000
|
$400.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
1.000
|
$500.000
|
$400.000
|
$500.000
|
$495.470
|
$434.000
|
$400.000
|
$600.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$18.000
|
$13.000
|
$15.000
|
$16.100
|
$38.000
|
$28.000
|
$60.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
2.000
|
$60.000
|
$48.000
|
$50.000
|
$56.920
|
$54.000
|
$60.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$15.000
|
$17.500
|
$19.000
|
$20.440
|
$44.000
|
$45.000
|
$60.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
7,053.000
|
$0.750
|
$0.800
|
$0.850
|
$0.990
|
$0.870
|
$0.800
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
210.000
|
$1.250
|
$1.200
|
$1.250
|
$1.420
|
$1.250
|
$1.150
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
5,540.000
|
$0.750
|
$0.800
|
$0.900
|
$0.990
|
$0.870
|
$0.800
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
286.000
|
$1.500
|
$1.000
|
$0.700
|
$1.860
|
$1.000
|
$2.000
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
4,702.000
|
$0.600
|
$0.830
|
$0.900
|
$1.020
|
$0.890
|
$0.820
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
600.000
|
$0.800
|
$1.650
|
$1.750
|
$2.030
|
$1.780
|
$1.640
|
$0.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
32.000
|
$10.000
|
$6.000
|
$6.500
|
$7.430
|
$6.520
|
$6.000
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$7,000.000
|
$9,000.000
|
$10,000.000
|
$3,000.000
|
$8,000.000
|
$6,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$5,000.000
|
$5,000.000
|
$2,000.000
|
$14,864.160
|
$2,000.000
|
$8,000.000
|
$12,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$150.000
|
$200.000
|
$375.000
|
$529.650
|
$400.000
|
$1,000.000
|
$100.000
|
|
Totals: |
$1,789,448.150
|
$1,839,845.510
|
$2,162,356.810
|
$2,188,445.992
|
$2,214,216.830
|
$2,291,163.340
|
$2,428,140.100
|