PREPARING ROW
|
STA
|
9.000
|
$3,180.000
|
$4,190.000
|
$2,500.000
|
$5,000.000
|
$9,000.000
|
$6,000.000
|
$3,500.000
|
$3,640.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
880.000
|
$10.500
|
$8.150
|
$12.680
|
$8.700
|
$13.000
|
$12.000
|
$20.000
|
$19.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,306.000
|
$8.510
|
$22.500
|
$8.260
|
$7.970
|
$15.000
|
$27.000
|
$20.000
|
$18.700
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
3,836.000
|
$9.000
|
$26.650
|
$20.980
|
$30.000
|
$15.000
|
$18.000
|
$20.000
|
$18.600
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
4,235.000
|
$1.300
|
$4.750
|
$2.590
|
$4.000
|
$1.250
|
$2.000
|
$6.000
|
$3.650
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,118.000
|
$0.130
|
$0.400
|
$0.420
|
$0.500
|
$0.360
|
$0.350
|
$0.550
|
$0.400
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,118.000
|
$0.100
|
$0.400
|
$0.420
|
$0.500
|
$0.360
|
$0.350
|
$0.550
|
$0.400
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
4,235.000
|
$0.380
|
$0.550
|
$0.460
|
$0.650
|
$0.400
|
$0.400
|
$0.720
|
$0.450
|
|
|
VEGETATIVE WATERING
|
MG
|
100.000
|
$18.000
|
$34.700
|
$69.000
|
$8.000
|
$10.000
|
$35.000
|
$60.000
|
$75.500
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
4,235.000
|
$1.070
|
$1.000
|
$2.120
|
$1.450
|
$2.000
|
$2.000
|
$1.590
|
$2.050
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
849.000
|
$47.000
|
$93.000
|
$94.040
|
$48.940
|
$75.000
|
$96.000
|
$95.000
|
$120.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
731.000
|
$3.880
|
$5.800
|
$6.600
|
$6.000
|
$5.750
|
$7.000
|
$10.000
|
$6.900
|
|
|
ASPH (TIER II)
|
GAL
|
1,137.000
|
$2.500
|
$6.050
|
$6.880
|
$3.750
|
$6.000
|
$4.000
|
$8.000
|
$7.200
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
25.000
|
$88.780
|
$490.000
|
$556.290
|
$150.000
|
$485.000
|
$160.000
|
$165.000
|
$580.000
|
|
|
PLANE ASPH CONC PAV(0" TO 12")
|
SY
|
3,656.000
|
$11.750
|
$11.400
|
$8.540
|
$13.000
|
$6.000
|
$2.000
|
$5.000
|
$26.300
|
|
|
CEM STABIL BKFL
|
CY
|
112.000
|
$90.000
|
$211.000
|
$152.790
|
$160.000
|
$200.000
|
$190.000
|
$185.000
|
$214.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,222.000
|
$25.000
|
$23.950
|
$32.450
|
$16.520
|
$50.000
|
$50.000
|
$29.000
|
$47.400
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
514.000
|
$175.000
|
$370.000
|
$339.420
|
$344.000
|
$500.000
|
$365.000
|
$415.000
|
$378.000
|
|
|
CL C CONC (ABUT)
|
CY
|
48.400
|
$906.630
|
$1,260.000
|
$1,175.950
|
$1,200.000
|
$1,250.000
|
$1,500.000
|
$1,561.000
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
41.300
|
$900.000
|
$1,850.000
|
$1,524.630
|
$1,200.000
|
$1,600.000
|
$1,500.000
|
$1,561.000
|
$1,870.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
10.200
|
$900.000
|
$3,060.000
|
$3,019.350
|
$1,200.000
|
$1,300.000
|
$1,900.000
|
$2,149.000
|
$2,110.000
|
|
|
REINF CONC SLAB
|
SF
|
7,130.000
|
$15.000
|
$27.600
|
$32.830
|
$30.000
|
$30.000
|
$29.000
|
$33.600
|
$36.900
|
|
|
APPROACH SLAB
|
CY
|
70.600
|
$473.470
|
$760.000
|
$698.180
|
$800.000
|
$600.000
|
$745.000
|
$848.400
|
$910.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
921.000
|
$124.260
|
$185.000
|
$223.940
|
$241.410
|
$275.000
|
$230.000
|
$195.000
|
$285.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
44.000
|
$420.000
|
$810.000
|
$640.460
|
$569.000
|
$530.000
|
$550.000
|
$435.000
|
$889.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(24 IN)
|
CY
|
238.000
|
$225.000
|
$360.000
|
$415.370
|
$199.200
|
$375.000
|
$200.000
|
$225.000
|
$287.000
|
|
|
RAIL (TY SSTR)
|
LF
|
342.000
|
$40.000
|
$125.000
|
$92.770
|
$80.000
|
$80.000
|
$175.000
|
$115.000
|
$155.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
90.000
|
$10.250
|
$226.000
|
$261.900
|
$120.000
|
$175.000
|
$220.000
|
$190.000
|
$262.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
105.000
|
$60.000
|
$82.600
|
$71.010
|
$60.000
|
$70.000
|
$110.000
|
$80.000
|
$91.500
|
|
|
CONC BOX CULV (8 FT X 6 FT)
|
LF
|
192.000
|
$600.000
|
$1,190.000
|
$1,149.050
|
$1,020.000
|
$1,000.000
|
$900.000
|
$1,036.840
|
$1,260.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
28.000
|
$133.000
|
$280.000
|
$234.010
|
$190.000
|
$165.000
|
$200.000
|
$259.980
|
$259.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
1.000
|
$933.000
|
$1,880.000
|
$2,989.740
|
$600.000
|
$2,000.000
|
$1,200.000
|
$2,500.000
|
$2,210.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,100.000
|
$3,040.000
|
$4,092.680
|
$688.000
|
$2,500.000
|
$3,400.000
|
$3,500.000
|
$4,260.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$345.800
|
$370.000
|
$832.920
|
$500.000
|
$200.000
|
$200.000
|
$1,200.000
|
$260.000
|
|
|
REMOV STR (PIPE)
|
LF
|
40.000
|
$12.370
|
$16.550
|
$46.910
|
$20.000
|
$12.000
|
$12.000
|
$20.000
|
$26.300
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$65,000.000
|
$45,000.000
|
$26,050.960
|
$80,000.000
|
$32,000.000
|
$90,000.000
|
$150,000.000
|
$102,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$145,367.120
|
$225,000.000
|
$225,000.000
|
$232,000.000
|
$255,000.000
|
$200,000.000
|
$265,000.000
|
$255,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$8,000.000
|
$2,310.000
|
$2,500.000
|
$2,968.691
|
$6,000.000
|
$3,000.000
|
$7,500.000
|
$2,540.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
180.000
|
$62.700
|
$46.150
|
$51.610
|
$102.000
|
$45.000
|
$48.000
|
$90.200
|
$50.400
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
180.000
|
$9.630
|
$41.050
|
$45.880
|
$20.000
|
$40.000
|
$43.000
|
$11.000
|
$44.800
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
430.000
|
$2.510
|
$4.100
|
$4.590
|
$10.000
|
$4.000
|
$5.000
|
$5.500
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
430.000
|
$0.570
|
$1.050
|
$1.150
|
$6.750
|
$1.000
|
$1.000
|
$1.920
|
$1.100
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,000.000
|
$46.000
|
$30.000
|
$23.250
|
$50.000
|
$28.000
|
$34.000
|
$80.000
|
$72.900
|
|
|
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
|
LF
|
1,010.000
|
$38.000
|
$19.200
|
$38.380
|
$60.000
|
$25.000
|
$95.000
|
$25.000
|
$18.800
|
|
|
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
|
LF
|
1,010.000
|
$9.000
|
$19.200
|
$23.020
|
$60.000
|
$12.000
|
$24.000
|
$18.000
|
$16.600
|
|
|
DRIVEWAYS (ACP)
|
SY
|
53.000
|
$37.000
|
$260.000
|
$195.150
|
$155.000
|
$130.000
|
$205.000
|
$60.000
|
$175.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
612.500
|
$21.000
|
$24.000
|
$32.970
|
$30.750
|
$32.000
|
$32.500
|
$26.400
|
$34.200
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,790.000
|
$1,650.000
|
$2,433.330
|
$2,123.460
|
$2,100.000
|
$2,200.000
|
$1,815.000
|
$2,690.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$1.700
|
$2.000
|
$3.440
|
$5.000
|
$6.000
|
$6.500
|
$2.200
|
$6.700
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$200.000
|
$250.000
|
$394.870
|
$346.260
|
$150.000
|
$160.000
|
$275.000
|
$168.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,660.000
|
$3,050.000
|
$4,053.190
|
$3,535.710
|
$4,000.000
|
$3,700.000
|
$3,355.000
|
$3,870.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$849.000
|
$1,120.000
|
$694.630
|
$1,621.000
|
$650.000
|
$900.000
|
$550.000
|
$951.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$8,220.000
|
$8,400.000
|
$5,683.650
|
$8,690.710
|
$12,000.000
|
$10,000.000
|
$7,920.000
|
$9,950.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
100.000
|
$13.820
|
$35.000
|
$22.940
|
$20.000
|
$14.000
|
$48.000
|
$25.000
|
$16.800
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
100.000
|
$35.000
|
$40.000
|
$68.820
|
$300.000
|
$31.000
|
$150.000
|
$75.000
|
$55.900
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$502.000
|
$730.000
|
$1,072.450
|
$600.000
|
$1,000.000
|
$1,000.000
|
$803.000
|
$1,050.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$88.000
|
$20.000
|
$143.380
|
$110.000
|
$150.000
|
$100.000
|
$22.000
|
$140.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$14.630
|
$19.000
|
$17.200
|
$30.000
|
$15.000
|
$16.000
|
$20.900
|
$16.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
22.000
|
$28.000
|
$25.000
|
$36.710
|
$30.000
|
$32.000
|
$34.000
|
$27.500
|
$35.800
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,800.000
|
$0.110
|
$0.750
|
$0.860
|
$1.000
|
$0.750
|
$0.800
|
$1.100
|
$0.840
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
1,800.000
|
$0.100
|
$0.750
|
$0.860
|
$1.000
|
$0.750
|
$0.800
|
$1.100
|
$0.840
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,800.000
|
$0.570
|
$1.300
|
$1.440
|
$1.250
|
$1.250
|
$1.350
|
$1.370
|
$1.400
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,800.000
|
$0.550
|
$1.300
|
$1.440
|
$1.250
|
$1.250
|
$1.350
|
$1.370
|
$1.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,000.000
|
$0.950
|
$3.050
|
$1.150
|
$3.000
|
$2.500
|
$0.800
|
$4.400
|
$2.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,000.000
|
$0.850
|
$3.050
|
$1.150
|
$3.000
|
$2.500
|
$0.800
|
$4.400
|
$2.350
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
1,804.000
|
$0.120
|
$0.750
|
$0.860
|
$1.500
|
$0.750
|
$0.800
|
$1.650
|
$0.840
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,804.000
|
$0.130
|
$0.750
|
$0.860
|
$1.500
|
$0.750
|
$0.800
|
$1.650
|
$0.840
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,804.000
|
$0.320
|
$1.250
|
$1.380
|
$2.000
|
$1.200
|
$1.300
|
$2.200
|
$1.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,804.000
|
$0.320
|
$1.250
|
$1.380
|
$2.000
|
$1.200
|
$1.300
|
$2.200
|
$1.350
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
25.000
|
$3.290
|
$10.250
|
$11.470
|
$50.000
|
$10.000
|
$12.000
|
$55.000
|
$11.200
|
|
|
D-GR HMA TY-C PG76-22
|
TON
|
1,280.000
|
$84.000
|
$176.000
|
$183.520
|
$170.000
|
$165.000
|
$210.000
|
$150.000
|
$191.000
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
209.000
|
$85.000
|
$228.000
|
$246.610
|
$215.000
|
$220.000
|
$255.000
|
$181.500
|
$257.000
|
|
|
BONDING COURSE
|
GAL
|
329.000
|
$2.710
|
$3.800
|
$4.300
|
$6.000
|
$3.750
|
$7.000
|
$8.000
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,250.000
|
$10,900.000
|
$20,000.000
|
$10,000.000
|
$10,000.000
|
$4,600.000
|
$1,850.000
|
$23,300.000
|
|
|
PORTABLE ROADWAY ILLUMINATION
|
DAY
|
53.000
|
$150.000
|
$150.000
|
$150.000
|
$133.000
|
$130.000
|
$115.000
|
$1,000.000
|
$119.000
|
|
Totals: |
$1,662,058.344
|
$2,547,556.200
|
$2,549,144.622
|
$2,595,807.163
|
$2,669,802.310
|
$2,698,375.650
|
$2,847,366.610
|
$3,154,265.570
|