|
|
BACKFILL (TY A)
|
STA
|
530.730
|
$125.000
|
$100.000
|
$250.000
|
$153.300
|
$175.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
1,191.000
|
$93.000
|
$100.000
|
$102.750
|
$111.780
|
$136.000
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
18,539.000
|
$93.000
|
$100.000
|
$102.750
|
$111.780
|
$136.000
|
|
|
TACK COAT
|
GAL
|
27,213.000
|
$2.850
|
$3.000
|
$2.540
|
$3.610
|
$2.850
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
500.000
|
$40.000
|
$45.000
|
$43.800
|
$64.040
|
$60.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
7,965.000
|
$53.000
|
$50.000
|
$59.300
|
$51.090
|
$65.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
33,882.000
|
$23.000
|
$22.000
|
$22.200
|
$21.260
|
$30.000
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
14,195.000
|
$3.000
|
$2.500
|
$1.980
|
$3.610
|
$3.850
|
|
|
PLANE ASPH CONC PAV (2"-3")
|
SY
|
1,317.000
|
$2.750
|
$3.500
|
$2.700
|
$5.710
|
$3.650
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
586.000
|
$40.000
|
$30.000
|
$36.000
|
$26.000
|
$27.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$600,000.000
|
$350,000.000
|
$352,370.000
|
$853,447.390
|
$246,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$8,687.590
|
$4,000.000
|
$2,035.000
|
$1,814.600
|
$1,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
40.000
|
$10.000
|
$8.000
|
$6.000
|
$15.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
40.000
|
$5.000
|
$2.000
|
$1.000
|
$10.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
40.000
|
$5.000
|
$10.000
|
$6.000
|
$15.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
40.000
|
$2.500
|
$2.000
|
$1.000
|
$10.000
|
$5.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
73,050.000
|
$0.150
|
$0.200
|
$0.190
|
$0.130
|
$0.300
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
15.000
|
$50.000
|
$35.000
|
$200.000
|
$50.000
|
$275.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$600.000
|
$650.000
|
$880.000
|
$1,000.000
|
$750.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
26,037.000
|
$0.150
|
$0.120
|
$0.110
|
$0.110
|
$0.090
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
133,417.000
|
$0.150
|
$0.120
|
$0.100
|
$0.100
|
$0.080
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
19,047.000
|
$0.150
|
$0.120
|
$0.110
|
$0.110
|
$0.090
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
165,026.000
|
$0.150
|
$0.120
|
$0.110
|
$0.110
|
$0.080
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,954.000
|
$0.150
|
$1.000
|
$1.000
|
$1.410
|
$1.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,253.000
|
$1.000
|
$1.000
|
$1.000
|
$1.410
|
$1.200
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
8,110.000
|
$1.000
|
$0.800
|
$1.400
|
$0.720
|
$1.500
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
8,110.000
|
$1.250
|
$0.800
|
$1.400
|
$0.720
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
405.000
|
$1.000
|
$1.100
|
$1.030
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,934.000
|
$0.850
|
$0.750
|
$0.690
|
$0.670
|
$0.650
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
146.000
|
$6.000
|
$7.500
|
$7.220
|
$7.000
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
51.000
|
$110.000
|
$100.000
|
$98.000
|
$95.000
|
$80.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
2.000
|
$360.000
|
$170.000
|
$160.000
|
$155.000
|
$40.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
18.000
|
$150.000
|
$150.000
|
$150.000
|
$145.000
|
$90.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
20.000
|
$34.000
|
$27.000
|
$26.000
|
$25.000
|
$50.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
5,245.000
|
$6.000
|
$6.000
|
$5.900
|
$5.720
|
$4.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
8.000
|
$350.000
|
$275.000
|
$257.000
|
$250.000
|
$250.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
21,698.000
|
$0.150
|
$0.120
|
$0.110
|
$0.110
|
$0.100
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
111,181.000
|
$0.150
|
$0.120
|
$0.100
|
$0.100
|
$0.100
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
405.000
|
$0.400
|
$0.550
|
$0.520
|
$0.500
|
$0.350
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
6,934.000
|
$0.400
|
$0.250
|
$0.230
|
$0.220
|
$0.250
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
146.000
|
$3.000
|
$2.800
|
$2.730
|
$2.650
|
$1.250
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
51.000
|
$60.000
|
$40.000
|
$39.000
|
$38.000
|
$40.000
|
|
REFL PAV MRK TY II (W) (LNDP ARW)
|
EA
|
2.000
|
$140.000
|
$70.000
|
$67.000
|
$65.000
|
$90.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
18.000
|
$60.000
|
$60.000
|
$56.000
|
$55.000
|
$45.000
|
|
REFL PAV MRK TY II (W) 18" (YLD TRI)
|
EA
|
20.000
|
$18.000
|
$16.000
|
$15.500
|
$15.000
|
$9.200
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
15,872.000
|
$0.150
|
$0.120
|
$0.110
|
$0.110
|
$0.100
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
137,521.000
|
$0.150
|
$0.120
|
$0.110
|
$0.110
|
$0.100
|
|
REFL PAV MRK TY II (Y) 24" (SLD)
|
LF
|
5,245.000
|
$2.300
|
$2.800
|
$2.730
|
$2.650
|
$1.250
|
|
REFL PAV MRK TY II (Y) (MED NOSE)
|
EA
|
8.000
|
$100.000
|
$80.000
|
$77.000
|
$75.000
|
$90.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
21,698.000
|
$0.400
|
$0.350
|
$0.330
|
$0.320
|
$0.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,754.000
|
$0.400
|
$0.350
|
$0.330
|
$0.320
|
$0.290
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
15,872.000
|
$0.400
|
$0.350
|
$0.330
|
$0.320
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
137,521.000
|
$0.400
|
$0.350
|
$0.330
|
$0.320
|
$0.290
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
105,427.000
|
$0.220
|
$0.550
|
$0.550
|
$0.530
|
$0.590
|
|
REFL PAV MRKR TY I-C
|
EA
|
273.000
|
$3.500
|
$3.500
|
$3.300
|
$3.220
|
$8.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,720.000
|
$3.250
|
$3.500
|
$3.300
|
$3.220
|
$4.200
|
|
|
D-GR HMA TY-D PG64-22 (LEVEL-UP)
|
TON
|
1,812.000
|
$80.000
|
$78.000
|
$96.500
|
$85.980
|
$140.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
36,639.000
|
$76.000
|
$78.000
|
$83.500
|
$84.480
|
$106.000
|
|
|
TACK COAT
|
GAL
|
26,647.000
|
$2.750
|
$3.000
|
$0.010
|
$3.400
|
$2.750
|
|
|
COMPOSITE GEOGRID FOR ASPHALT OVERLAY
|
SQ
|
320,251.000
|
$3.200
|
$3.500
|
$2.990
|
$4.540
|
$4.350
|
|
|
TACK COAT
|
GAL
|
64,051.000
|
$4.000
|
$3.000
|
$3.170
|
$3.080
|
$1.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$5,000.000
|
$6,000.000
|
$6,800.000
|
$7,576.710
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
70.000
|
$175.000
|
$200.000
|
$130.000
|
$303.070
|
$285.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
17.000
|
$150.000
|
$250.000
|
$50.000
|
$303.070
|
$1,500.000
|
|
Totals: |
$8,558,610.020
|
$8,458,635.530
|
$8,638,624.140
|
$9,827,625.009
|
$10,856,418.530
|