PREPARING ROW
|
STA
|
251.000
|
$1,300.000
|
$700.000
|
$496.170
|
$250.000
|
$477.031
|
$1,200.000
|
$1,030.600
|
$2,539.210
|
$1,800.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
27,544.000
|
$3.200
|
$4.000
|
$4.190
|
$2.400
|
$5.146
|
$3.000
|
$4.600
|
$2.920
|
$4.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
20,771.000
|
$8.000
|
$9.000
|
$16.650
|
$9.000
|
$12.253
|
$16.000
|
$9.600
|
$12.340
|
$22.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
6,619.000
|
$12.000
|
$9.000
|
$8.940
|
$5.000
|
$10.521
|
$14.000
|
$16.300
|
$22.210
|
$15.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
78,508.000
|
$1.000
|
$0.400
|
$0.770
|
$1.100
|
$0.979
|
$1.250
|
$2.100
|
$1.040
|
$2.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
78,508.000
|
$0.120
|
$0.090
|
$0.140
|
$0.150
|
$0.135
|
$0.200
|
$0.100
|
$0.130
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
78,508.000
|
$0.120
|
$0.090
|
$0.140
|
$0.150
|
$0.135
|
$0.200
|
$0.100
|
$0.130
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
1,947.000
|
$20.000
|
$15.000
|
$13.320
|
$32.000
|
$23.581
|
$15.000
|
$12.400
|
$12.150
|
$24.900
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
78,508.000
|
$1.000
|
$0.700
|
$0.830
|
$0.850
|
$0.811
|
$0.750
|
$0.700
|
$0.900
|
$0.700
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
27,367.000
|
$42.000
|
$50.000
|
$52.520
|
$63.000
|
$58.684
|
$58.000
|
$59.400
|
$56.540
|
$75.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
14,498.000
|
$4.000
|
$3.500
|
$3.410
|
$3.000
|
$4.365
|
$3.000
|
$3.700
|
$3.390
|
$3.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
11,157.000
|
$87.000
|
$74.000
|
$68.550
|
$85.000
|
$79.295
|
$80.000
|
$87.100
|
$95.000
|
$85.000
|
|
|
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
|
TON
|
2,022.000
|
$88.000
|
$74.000
|
$71.970
|
$101.500
|
$97.639
|
$95.000
|
$96.900
|
$113.510
|
$100.000
|
|
|
D-GR HMA TY-B PG64-22(LEVEL-UP)
|
TON
|
1,514.000
|
$75.000
|
$76.000
|
$67.950
|
$106.000
|
$81.712
|
$100.000
|
$90.400
|
$118.440
|
$100.000
|
|
|
TACK COAT
|
GAL
|
6,241.930
|
$2.500
|
$3.000
|
$4.430
|
$3.150
|
$4.527
|
$3.000
|
$2.900
|
$3.520
|
$3.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
457.000
|
$115.000
|
$100.000
|
$98.040
|
$110.000
|
$104.257
|
$100.000
|
$119.800
|
$122.140
|
$105.000
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
6,913.000
|
$99.000
|
$100.000
|
$98.040
|
$110.000
|
$104.257
|
$100.000
|
$119.800
|
$122.140
|
$105.000
|
|
|
TACK COAT
|
GAL
|
5,101.310
|
$2.500
|
$3.000
|
$4.430
|
$3.000
|
$4.527
|
$3.000
|
$2.900
|
$3.390
|
$3.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
6,127.000
|
$42.000
|
$36.000
|
$30.510
|
$40.000
|
$29.282
|
$45.000
|
$41.400
|
$45.030
|
$40.000
|
|
|
CEM STABIL BKFL
|
CY
|
80.000
|
$100.000
|
$150.000
|
$160.000
|
$140.000
|
$156.000
|
$150.000
|
$156.800
|
$75.970
|
$270.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
64.000
|
$460.000
|
$480.000
|
$425.000
|
$430.000
|
$442.000
|
$450.000
|
$444.300
|
$442.370
|
$620.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
52.000
|
$375.000
|
$450.000
|
$525.000
|
$560.000
|
$447.200
|
$550.000
|
$449.500
|
$449.430
|
$440.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
322.000
|
$25.000
|
$42.000
|
$42.660
|
$46.000
|
$41.600
|
$18.000
|
$21.400
|
$15.390
|
$4.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
970.000
|
$155.000
|
$110.000
|
$115.000
|
$170.000
|
$164.170
|
$195.000
|
$100.300
|
$177.730
|
$145.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
40.000
|
$50.000
|
$65.000
|
$200.000
|
$79.000
|
$52.000
|
$150.000
|
$52.300
|
$66.520
|
$111.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
364.000
|
$65.000
|
$65.000
|
$100.000
|
$72.000
|
$78.000
|
$85.000
|
$78.400
|
$61.970
|
$136.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
68.000
|
$100.000
|
$120.000
|
$250.000
|
$105.000
|
$114.400
|
$225.000
|
$115.000
|
$103.540
|
$360.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
554.000
|
$130.000
|
$192.000
|
$130.000
|
$122.000
|
$192.400
|
$150.000
|
$193.400
|
$157.290
|
$165.970
|
|
|
HEADWALL (CH-PW-0)(DIA = 30 IN)(MOD)
|
EA
|
2.000
|
$16,000.000
|
$5,000.000
|
$10,000.000
|
$12,600.000
|
$5,200.000
|
$19,800.000
|
$5,226.900
|
$20,587.720
|
$10,500.000
|
|
|
SET (TY II) (18 IN) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$1,500.000
|
$1,200.000
|
$1,000.000
|
$1,240.000
|
$1,144.000
|
$1,200.000
|
$1,149.900
|
$1,600.110
|
$1,270.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$1,200.000
|
$1,200.000
|
$1,400.000
|
$1,280.000
|
$1,248.000
|
$1,300.000
|
$1,254.400
|
$1,173.440
|
$850.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
22.000
|
$1,050.000
|
$1,300.000
|
$1,500.000
|
$1,400.000
|
$1,456.000
|
$1,600.000
|
$1,463.500
|
$820.210
|
$1,510.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,000.000
|
$1,800.000
|
$1,800.000
|
$1,675.000
|
$1,768.000
|
$3,000.000
|
$1,777.100
|
$1,823.780
|
$1,650.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$2,400.000
|
$1,700.000
|
$2,200.000
|
$2,195.000
|
$1,716.000
|
$1,600.000
|
$1,724.900
|
$2,179.550
|
$2,190.000
|
|
|
REMOV STR (SET)
|
EA
|
25.000
|
$330.000
|
$400.000
|
$250.000
|
$350.000
|
$416.000
|
$500.000
|
$418.100
|
$588.610
|
$810.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
27.000
|
$650.000
|
$400.000
|
$250.000
|
$705.000
|
$416.000
|
$700.000
|
$418.100
|
$861.490
|
$720.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$425,403.560
|
$375,000.000
|
$577,252.500
|
$150,000.000
|
$621,164.607
|
$486,000.000
|
$760,000.000
|
$678,580.740
|
$670,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$10,000.000
|
$7,000.000
|
$4,759.740
|
$9,800.000
|
$6,520.347
|
$8,000.000
|
$7,039.900
|
$12,337.830
|
$22,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
240.000
|
$30.000
|
$28.000
|
$37.000
|
$38.000
|
$36.119
|
$28.000
|
$29.300
|
$30.800
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
240.000
|
$10.000
|
$14.000
|
$10.070
|
$10.000
|
$9.828
|
$9.000
|
$14.600
|
$9.370
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,972.000
|
$2.250
|
$3.000
|
$2.640
|
$2.700
|
$2.579
|
$3.000
|
$2.200
|
$2.740
|
$2.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,972.000
|
$0.600
|
$1.000
|
$0.550
|
$0.550
|
$0.541
|
$0.500
|
$0.700
|
$0.730
|
$1.100
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
460.000
|
$42.000
|
$60.000
|
$28.000
|
$14.000
|
$15.850
|
$30.000
|
$26.800
|
$34.040
|
$18.850
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
460.000
|
$6.000
|
$20.000
|
$28.000
|
$14.000
|
$8.210
|
$20.000
|
$4.500
|
$6.250
|
$15.250
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
460.000
|
$11.500
|
$24.000
|
$28.000
|
$14.000
|
$18.560
|
$25.000
|
$10.100
|
$10.490
|
$18.850
|
|
|
DRIVEWAYS (ACP)
|
SY
|
229.000
|
$38.000
|
$30.000
|
$39.420
|
$43.000
|
$37.660
|
$45.000
|
$35.100
|
$35.790
|
$122.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
4,937.000
|
$32.000
|
$23.000
|
$26.280
|
$29.000
|
$24.635
|
$29.000
|
$35.100
|
$20.260
|
$54.600
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
20,035.000
|
$0.150
|
$0.320
|
$0.720
|
$0.300
|
$0.309
|
$0.500
|
$0.300
|
$0.170
|
$0.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
950.000
|
$22.000
|
$20.000
|
$21.140
|
$22.000
|
$20.654
|
$21.000
|
$20.800
|
$22.090
|
$21.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$1,800.000
|
$2,037.240
|
$1,500.000
|
$1,470.560
|
$1,500.000
|
$1,478.200
|
$1,935.030
|
$1,600.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,150.000
|
$900.000
|
$1,167.640
|
$1,200.000
|
$1,140.880
|
$1,150.000
|
$1,146.800
|
$1,192.470
|
$925.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
495.000
|
$2.500
|
$2.500
|
$1.600
|
$1.600
|
$1.560
|
$5.000
|
$1.600
|
$2.670
|
$2.550
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$215.000
|
$130.000
|
$133.050
|
$135.000
|
$130.000
|
$250.000
|
$130.700
|
$241.360
|
$128.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,700.000
|
$2,700.000
|
$2,945.170
|
$3,000.000
|
$2,877.680
|
$2,900.000
|
$2,892.500
|
$2,841.430
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$2,000.000
|
$1,596.580
|
$1,600.000
|
$1,560.000
|
$1,600.000
|
$1,568.100
|
$2,399.660
|
$2,050.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$800.000
|
$700.000
|
$798.290
|
$815.000
|
$780.000
|
$800.000
|
$784.000
|
$923.940
|
$720.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,100.000
|
$8,000.000
|
$7,663.610
|
$7,800.000
|
$7,488.000
|
$7,500.000
|
$7,526.700
|
$8,944.050
|
$9,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
18.000
|
$200.000
|
$190.000
|
$186.870
|
$200.000
|
$247.520
|
$200.000
|
$195.300
|
$247.470
|
$190.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
1.000
|
$250.000
|
$220.000
|
$213.440
|
$230.000
|
$292.240
|
$225.000
|
$223.100
|
$282.460
|
$260.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
33.000
|
$485.000
|
$460.000
|
$455.760
|
$495.000
|
$568.880
|
$480.000
|
$476.400
|
$505.240
|
$510.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
9.000
|
$650.000
|
$560.000
|
$552.290
|
$600.000
|
$599.040
|
$580.000
|
$577.300
|
$695.530
|
$690.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$575.000
|
$540.000
|
$530.180
|
$575.000
|
$616.720
|
$560.000
|
$554.200
|
$627.990
|
$580.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$800.000
|
$580.000
|
$574.830
|
$625.000
|
$646.880
|
$600.000
|
$600.900
|
$811.990
|
$710.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$785.000
|
$750.000
|
$750.000
|
$814.000
|
$737.360
|
$866.000
|
$784.000
|
$844.340
|
$840.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$835.000
|
$900.000
|
$889.560
|
$965.000
|
$751.920
|
$940.000
|
$929.900
|
$838.270
|
$890.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
48.000
|
$86.000
|
$100.000
|
$100.000
|
$108.000
|
$88.400
|
$110.000
|
$104.500
|
$86.490
|
$92.300
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
14.000
|
$80.000
|
$50.000
|
$49.000
|
$53.000
|
$67.600
|
$52.000
|
$51.200
|
$102.870
|
$35.900
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
22.000
|
$35.000
|
$17.000
|
$16.500
|
$18.000
|
$20.800
|
$17.000
|
$17.200
|
$29.160
|
$29.750
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
72.000
|
$3.000
|
$8.000
|
$8.000
|
$8.700
|
$8.320
|
$8.500
|
$8.400
|
$3.350
|
$8.200
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
144.000
|
$8.500
|
$8.000
|
$8.000
|
$8.700
|
$8.320
|
$8.500
|
$8.400
|
$8.980
|
$8.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
615.000
|
$1.500
|
$2.000
|
$1.780
|
$1.600
|
$2.720
|
$1.000
|
$0.600
|
$1.850
|
$1.550
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
615.000
|
$1.000
|
$1.000
|
$1.000
|
$1.100
|
$1.040
|
$1.000
|
$1.000
|
$1.010
|
$1.050
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
453.000
|
$6.000
|
$5.000
|
$5.000
|
$5.400
|
$5.200
|
$5.500
|
$5.200
|
$7.720
|
$5.150
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$130.000
|
$150.000
|
$150.000
|
$163.000
|
$156.000
|
$160.000
|
$156.800
|
$5.810
|
$154.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$150.000
|
$170.000
|
$163.000
|
$177.000
|
$169.520
|
$170.000
|
$170.400
|
$176.420
|
$167.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
1.000
|
$300.000
|
$350.000
|
$344.000
|
$373.000
|
$357.760
|
$370.000
|
$359.600
|
$249.430
|
$350.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
49,981.000
|
$1.000
|
$0.650
|
$0.640
|
$0.700
|
$0.666
|
$0.700
|
$0.700
|
$0.600
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,180.000
|
$0.400
|
$0.370
|
$0.360
|
$0.400
|
$0.374
|
$0.400
|
$0.400
|
$0.390
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
36,269.000
|
$0.400
|
$0.330
|
$0.320
|
$0.400
|
$0.333
|
$0.350
|
$0.300
|
$0.390
|
$0.350
|
|
REFL PAV MRKR TY I-C
|
EA
|
31.000
|
$4.000
|
$4.000
|
$4.000
|
$4.350
|
$4.160
|
$5.000
|
$4.200
|
$4.020
|
$4.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
986.000
|
$3.500
|
$3.000
|
$3.000
|
$3.250
|
$3.120
|
$3.250
|
$3.100
|
$3.600
|
$3.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$7,000.000
|
$7,630.910
|
$6,000.000
|
$14,720.000
|
$8,000.000
|
$5,685.300
|
$6,168.920
|
$21,600.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$190.000
|
$250.000
|
$305.240
|
$110.000
|
$194.400
|
$270.000
|
$156.800
|
$616.890
|
$700.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$43.000
|
$25.000
|
$106.830
|
$75.000
|
$59.400
|
$60.000
|
$54.500
|
$98.700
|
$154.000
|
|
Totals: |
$5,858,771.430
|
$5,494,472.680
|
$5,836,047.983
|
$5,957,781.660
|
$6,292,078.414
|
$6,544,554.270
|
$6,829,296.896
|
$7,374,898.054
|
$8,016,040.950
|