PREPARING ROW
|
STA
|
375.000
|
$1,300.000
|
$250.000
|
$458.370
|
$600.000
|
$120.000
|
$525.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
24,235.000
|
$3.200
|
$3.000
|
$4.380
|
$4.000
|
$5.750
|
$6.250
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
32,492.000
|
$8.000
|
$8.000
|
$9.990
|
$10.000
|
$10.250
|
$8.500
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
18,958.000
|
$12.000
|
$8.000
|
$9.990
|
$6.000
|
$7.250
|
$6.500
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
145,467.000
|
$1.000
|
$0.500
|
$1.120
|
$0.400
|
$1.500
|
$1.750
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
145,467.000
|
$0.100
|
$0.090
|
$0.100
|
$0.080
|
$0.100
|
$0.200
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
145,467.000
|
$0.100
|
$0.090
|
$0.100
|
$0.080
|
$0.100
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
3,606.000
|
$15.000
|
$5.000
|
$18.930
|
$10.000
|
$20.000
|
$45.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
145,467.000
|
$0.900
|
$0.700
|
$0.690
|
$0.650
|
$0.750
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
39,747.000
|
$50.000
|
$50.000
|
$48.730
|
$49.000
|
$58.000
|
$54.650
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
21,009.000
|
$3.700
|
$3.500
|
$3.680
|
$3.600
|
$3.750
|
$4.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
684.000
|
$100.000
|
$90.000
|
$95.670
|
$100.000
|
$102.000
|
$120.000
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
10,306.000
|
$99.000
|
$90.000
|
$95.670
|
$100.000
|
$102.000
|
$120.000
|
|
|
TACK COAT
|
GAL
|
15,393.000
|
$2.500
|
$3.000
|
$2.960
|
$2.500
|
$3.000
|
$4.100
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
9,154.000
|
$40.000
|
$35.000
|
$25.910
|
$35.000
|
$40.000
|
$40.000
|
|
|
CEM STABIL BKFL
|
CY
|
65.000
|
$100.000
|
$150.000
|
$139.000
|
$115.000
|
$185.000
|
$225.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
12.000
|
$4.600
|
$50.000
|
$10.000
|
$100.000
|
$60.000
|
$1.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,189.000
|
$20.000
|
$40.000
|
$20.000
|
$20.000
|
$32.000
|
$26.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
38.000
|
$460.000
|
$450.000
|
$421.000
|
$430.000
|
$580.000
|
$450.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
78.000
|
$425.000
|
$450.000
|
$420.000
|
$450.000
|
$575.000
|
$475.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
40.000
|
$265.000
|
$250.000
|
$251.510
|
$340.000
|
$255.000
|
$250.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
14.000
|
$65.000
|
$75.000
|
$186.000
|
$145.000
|
$150.000
|
$215.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
4.000
|
$100.000
|
$150.000
|
$374.000
|
$440.000
|
$250.000
|
$275.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
812.000
|
$65.000
|
$60.000
|
$80.000
|
$60.000
|
$80.000
|
$90.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
216.000
|
$80.000
|
$75.000
|
$113.000
|
$107.000
|
$84.000
|
$115.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
82.000
|
$105.000
|
$100.000
|
$120.000
|
$100.000
|
$96.000
|
$125.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
18.000
|
$165.000
|
$200.000
|
$500.000
|
$620.000
|
$165.000
|
$225.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
22.000
|
$195.000
|
$250.000
|
$455.000
|
$350.000
|
$200.000
|
$250.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
614.000
|
$175.000
|
$130.000
|
$160.000
|
$125.000
|
$160.000
|
$160.000
|
|
|
HEADWALL (CH - PW - 0)(DIA=36 IN)(MOD)
|
EA
|
1.000
|
$18,772.000
|
$25,000.000
|
$19,990.000
|
$21,000.000
|
$26,000.000
|
$9,500.000
|
|
|
HEADWALL (CH - PW - S)(DIA= 48IN) (MOD)
|
EA
|
2.000
|
$18,526.000
|
$27,500.000
|
$22,490.000
|
$22,000.000
|
$28,000.000
|
$10,500.000
|
|
|
SET (TY II) (18 IN) (CMP) (3: 1) (C)
|
EA
|
1.000
|
$800.000
|
$750.000
|
$990.000
|
$1,100.000
|
$1,250.000
|
$800.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
51.000
|
$1,050.000
|
$800.000
|
$1,090.000
|
$1,300.000
|
$1,700.000
|
$900.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,690.000
|
$900.000
|
$1,690.000
|
$1,500.000
|
$2,000.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,715.000
|
$950.000
|
$1,990.000
|
$1,500.000
|
$2,000.000
|
$1,350.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,400.000
|
$1,000.000
|
$1,690.000
|
$1,500.000
|
$2,000.000
|
$1,100.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,500.000
|
$1,500.000
|
$2,990.000
|
$1,800.000
|
$2,600.000
|
$2,300.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,600.000
|
$3,000.000
|
$4,740.000
|
$2,700.000
|
$3,000.000
|
$1,950.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
42.000
|
$2,000.000
|
$1,000.000
|
$1,990.000
|
$1,800.000
|
$2,425.000
|
$2,100.000
|
|
|
REMOV STR (SET)
|
EA
|
29.000
|
$580.000
|
$500.000
|
$549.000
|
$300.000
|
$500.000
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,700.000
|
$2,000.000
|
$3,490.000
|
$800.000
|
$1,000.000
|
$1,200.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
54.000
|
$650.000
|
$350.000
|
$529.000
|
$330.000
|
$500.000
|
$600.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$628,852.980
|
$525,000.000
|
$664,272.090
|
$500,000.000
|
$500,000.000
|
$930,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$8,000.000
|
$2,500.000
|
$4,540.620
|
$5,000.000
|
$1,750.000
|
$13,465.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
780.000
|
$30.000
|
$25.000
|
$31.240
|
$40.000
|
$27.000
|
$33.850
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
780.000
|
$10.000
|
$5.000
|
$11.810
|
$9.000
|
$10.000
|
$16.930
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
12,498.000
|
$2.500
|
$2.500
|
$3.200
|
$2.500
|
$2.250
|
$4.510
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
12,498.000
|
$0.750
|
$0.700
|
$0.770
|
$0.500
|
$0.850
|
$1.130
|
|
|
DRIVEWAYS (ACP)
|
SY
|
8,147.000
|
$38.000
|
$25.000
|
$31.710
|
$30.000
|
$29.500
|
$19.500
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
29,699.000
|
$0.150
|
$0.250
|
$0.370
|
$0.250
|
$0.170
|
$0.260
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,337.500
|
$21.500
|
$25.000
|
$18.900
|
$19.000
|
$22.000
|
$21.330
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,150.000
|
$1,100.000
|
$900.000
|
$950.000
|
$1,200.000
|
$1,015.570
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$26.000
|
$20.000
|
$19.150
|
$20.000
|
$23.000
|
$21.610
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
250.000
|
$2.000
|
$3.000
|
$2.500
|
$2.500
|
$2.200
|
$2.820
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,700.000
|
$2,750.000
|
$2,570.000
|
$2,600.000
|
$3,240.000
|
$2,900.010
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$250.000
|
$200.000
|
$250.000
|
$250.000
|
$220.000
|
$282.100
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
42.000
|
$200.000
|
$160.000
|
$175.000
|
$180.000
|
$200.000
|
$180.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
4.000
|
$250.000
|
$200.000
|
$240.000
|
$250.000
|
$265.000
|
$210.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
4.000
|
$425.000
|
$350.000
|
$380.000
|
$390.000
|
$420.000
|
$385.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
23.000
|
$485.000
|
$450.000
|
$365.000
|
$370.000
|
$400.000
|
$475.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
10.000
|
$600.000
|
$600.000
|
$495.000
|
$500.000
|
$550.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
21.000
|
$575.000
|
$525.000
|
$430.000
|
$440.000
|
$475.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$675.000
|
$725.000
|
$670.000
|
$680.000
|
$725.000
|
$720.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$785.000
|
$650.000
|
$620.000
|
$630.000
|
$675.000
|
$830.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$850.000
|
$850.000
|
$725.000
|
$730.000
|
$800.000
|
$925.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
58.000
|
$90.000
|
$75.000
|
$65.000
|
$100.000
|
$75.000
|
$90.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
39.000
|
$80.000
|
$50.000
|
$58.000
|
$59.000
|
$65.000
|
$72.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
23.000
|
$25.000
|
$20.000
|
$27.000
|
$29.000
|
$30.000
|
$29.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
74,840.000
|
$0.200
|
$0.110
|
$0.100
|
$0.100
|
$0.120
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
96.000
|
$3.500
|
$3.000
|
$3.000
|
$3.200
|
$3.250
|
$6.770
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
6,150.000
|
$0.200
|
$0.110
|
$0.100
|
$0.100
|
$0.120
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
43,693.000
|
$0.200
|
$0.110
|
$0.100
|
$0.100
|
$0.120
|
$0.250
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
192.000
|
$8.500
|
$6.000
|
$6.000
|
$6.400
|
$6.500
|
$6.770
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
936.000
|
$1.000
|
$1.500
|
$1.670
|
$1.000
|
$1.000
|
$1.130
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
765.000
|
$0.800
|
$1.000
|
$0.700
|
$0.760
|
$0.750
|
$0.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
177.000
|
$6.250
|
$12.000
|
$12.000
|
$13.000
|
$13.000
|
$7.900
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
7.000
|
$150.000
|
$100.000
|
$100.000
|
$110.000
|
$110.000
|
$169.260
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
3.000
|
$170.000
|
$110.000
|
$110.000
|
$120.000
|
$120.000
|
$169.260
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
1.000
|
$575.000
|
$250.000
|
$250.000
|
$270.000
|
$275.000
|
$501.010
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
74,220.000
|
$0.600
|
$0.600
|
$0.600
|
$0.650
|
$0.650
|
$0.720
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,150.000
|
$0.400
|
$0.300
|
$0.300
|
$0.320
|
$0.320
|
$0.410
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
47,139.000
|
$0.350
|
$0.300
|
$0.300
|
$0.320
|
$0.320
|
$0.370
|
|
REFL PAV MRKR TY I-C
|
EA
|
39.000
|
$4.000
|
$3.500
|
$3.500
|
$3.800
|
$3.850
|
$4.510
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,212.000
|
$3.500
|
$3.500
|
$3.500
|
$3.800
|
$3.850
|
$3.880
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
3,021.000
|
$88.000
|
$80.000
|
$67.590
|
$84.000
|
$105.000
|
$96.760
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
16,670.000
|
$87.000
|
$75.000
|
$68.550
|
$84.000
|
$92.000
|
$88.790
|
|
|
TACK COAT
|
GAL
|
7,323.000
|
$2.500
|
$3.000
|
$2.960
|
$2.500
|
$3.000
|
$4.550
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,500.000
|
$8,500.000
|
$8,118.750
|
$5,000.000
|
$5,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$220.000
|
$200.000
|
$250.060
|
$400.000
|
$250.000
|
$280.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$60.000
|
$50.000
|
$81.190
|
$35.000
|
$25.000
|
$90.000
|
|
Totals: |
$8,646,475.280
|
$7,305,240.140
|
$7,784,648.380
|
$7,800,185.700
|
$8,634,829.320
|
$9,416,266.095
|