PREPARING ROW
|
STA
|
81.000
|
$1,200.000
|
$691.740
|
$400.000
|
$376.640
|
$1,510.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
4,704.000
|
$7.000
|
$6.840
|
$8.400
|
$12.660
|
$7.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,679.000
|
$14.000
|
$18.360
|
$9.850
|
$15.380
|
$17.200
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
4,040.000
|
$20.000
|
$18.360
|
$22.400
|
$15.650
|
$13.300
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
32,676.000
|
$1.750
|
$1.130
|
$2.000
|
$1.650
|
$3.200
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
32,676.000
|
$0.180
|
$0.180
|
$0.220
|
$0.230
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
32,676.000
|
$0.180
|
$0.160
|
$0.190
|
$0.180
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
32,676.000
|
$0.180
|
$0.160
|
$0.190
|
$0.180
|
$0.130
|
|
|
VEGETATIVE WATERING
|
MG
|
810.000
|
$20.000
|
$20.520
|
$50.000
|
$42.760
|
$42.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
32,676.000
|
$1.500
|
$1.500
|
$1.800
|
$1.680
|
$1.450
|
|
|
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
|
CY
|
5,415.000
|
$45.000
|
$69.270
|
$96.000
|
$80.420
|
$113.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
4,070.000
|
$4.500
|
$5.260
|
$4.600
|
$5.220
|
$4.450
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,974.000
|
$55.000
|
$49.240
|
$57.750
|
$67.970
|
$56.400
|
|
|
CEM STABIL BKFL
|
CY
|
27.000
|
$175.000
|
$210.000
|
$725.000
|
$186.090
|
$212.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
240.000
|
$35.000
|
$105.000
|
$60.000
|
$18.020
|
$106.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.000
|
$600.000
|
$735.000
|
$1,025.000
|
$633.830
|
$742.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
17.000
|
$600.000
|
$788.000
|
$785.000
|
$612.110
|
$795.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
26.000
|
$275.000
|
$237.000
|
$330.000
|
$502.350
|
$280.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
68.000
|
$100.000
|
$69.000
|
$151.000
|
$91.780
|
$68.900
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
24.000
|
$130.000
|
$142.000
|
$163.000
|
$117.960
|
$143.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
18.000
|
$300.000
|
$315.000
|
$309.000
|
$337.860
|
$318.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
302.000
|
$170.000
|
$158.000
|
$274.000
|
$235.490
|
$159.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,300.000
|
$1,050.000
|
$2,875.000
|
$1,774.120
|
$1,060.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$1,575.000
|
$3,290.000
|
$2,187.250
|
$1,590.000
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$5,750.000
|
$4,725.000
|
$6,760.000
|
$7,666.020
|
$4,770.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$6,000.000
|
$5,250.000
|
$7,580.000
|
$9,273.450
|
$5,300.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$2,500.000
|
$1,575.000
|
$3,040.000
|
$2,341.200
|
$1,590.000
|
|
|
REMOV STR (SET)
|
EA
|
9.000
|
$450.000
|
$788.000
|
$850.000
|
$1,086.790
|
$795.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
9.000
|
$500.000
|
$1,313.000
|
$675.000
|
$777.960
|
$1,320.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$235,500.000
|
$235,403.290
|
$75,617.000
|
$208,101.140
|
$294,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$5,000.000
|
$2,870.240
|
$2,005.000
|
$2,941.250
|
$32,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
120.000
|
$55.000
|
$48.000
|
$58.000
|
$54.530
|
$47.700
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$20.000
|
$25.000
|
$30.000
|
$36.150
|
$10.600
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
270.000
|
$3.750
|
$4.000
|
$4.800
|
$4.780
|
$6.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
270.000
|
$1.000
|
$1.750
|
$2.100
|
$2.310
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
995.000
|
$6.000
|
$3.500
|
$4.200
|
$3.950
|
$7.200
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
995.000
|
$1.000
|
$1.750
|
$2.100
|
$2.970
|
$0.530
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,035.000
|
$60.000
|
$36.000
|
$60.000
|
$51.200
|
$62.500
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
8,077.000
|
$0.300
|
$0.250
|
$1.870
|
$0.400
|
$0.530
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
325.000
|
$30.000
|
$23.050
|
$33.000
|
$30.570
|
$24.400
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,600.000
|
$1,330.390
|
$2,010.000
|
$1,946.110
|
$1,410.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$3.000
|
$0.890
|
$2.400
|
$2.500
|
$0.940
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,575.000
|
$3,224.870
|
$3,900.000
|
$3,678.830
|
$3,420.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$350.000
|
$265.190
|
$270.000
|
$299.510
|
$281.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
6.000
|
$275.000
|
$367.850
|
$441.000
|
$415.020
|
$323.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
1.000
|
$290.000
|
$585.870
|
$703.000
|
$654.840
|
$371.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$700.000
|
$810.760
|
$973.000
|
$902.220
|
$688.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
2.000
|
$700.000
|
$1,015.830
|
$1,219.000
|
$1,127.800
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$800.000
|
$957.810
|
$1,150.000
|
$1,063.970
|
$787.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$150.000
|
$173.140
|
$208.000
|
$200.840
|
$84.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
5.000
|
$35.000
|
$83.760
|
$100.000
|
$102.520
|
$29.700
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
1.000
|
$100.000
|
$75.000
|
$90.000
|
$164.650
|
$222.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
24.000
|
$6.000
|
$17.760
|
$6.850
|
$10.610
|
$5.300
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$15.000
|
$25.000
|
$14.800
|
$15.740
|
$5.300
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
16,154.000
|
$1.200
|
$0.770
|
$1.100
|
$1.000
|
$0.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
202.000
|
$2.000
|
$1.600
|
$2.000
|
$2.710
|
$1.800
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
24.000
|
$10.000
|
$7.770
|
$9.700
|
$13.240
|
$9.500
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
|
LF
|
8,077.000
|
$1.000
|
$1.670
|
$1.500
|
$1.410
|
$0.950
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
15,999.000
|
$0.250
|
$0.340
|
$0.750
|
$1.730
|
$0.530
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
24.000
|
$10.000
|
$7.000
|
$5.300
|
$48.150
|
$4.250
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
4,040.000
|
$0.350
|
$0.340
|
$0.750
|
$0.860
|
$0.640
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
15,999.000
|
$0.700
|
$1.060
|
$1.900
|
$1.730
|
$0.950
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,040.000
|
$0.700
|
$0.770
|
$0.900
|
$0.860
|
$0.950
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
202.000
|
$5.000
|
$7.770
|
$6.800
|
$6.730
|
$6.400
|
|
|
D-GR HMA TY-C PG64-22
|
TON
|
2,239.000
|
$170.000
|
$96.210
|
$110.000
|
$145.820
|
$113.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
3,494.000
|
$135.000
|
$104.850
|
$123.000
|
$141.980
|
$127.000
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
652.000
|
$140.000
|
$110.700
|
$122.000
|
$142.660
|
$129.000
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
2,262.000
|
$160.000
|
$134.460
|
$140.000
|
$164.920
|
$145.000
|
|
|
BONDING COURSE
|
GAL
|
7,215.000
|
$4.500
|
$4.010
|
$4.300
|
$6.940
|
$4.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$10,969.940
|
$12,960.000
|
$9,202.980
|
$11,800.000
|
|
|
TMA (STATIONARY)
|
DAY
|
18.000
|
$300.000
|
$270.620
|
$540.000
|
$568.790
|
$201.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
16.000
|
$100.000
|
$108.250
|
$300.000
|
$284.400
|
$156.000
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
2.000
|
$1,500.000
|
$1,450.240
|
$1,750.000
|
$1,461.200
|
$3,180.000
|
|
Totals: |
$2,836,279.990
|
$2,515,580.840
|
$2,830,212.290
|
$3,066,494.720
|
$3,270,438.290
|