PREPARING ROW
|
STA
|
156.100
|
$2,000.000
|
$2,500.000
|
$2,697.310
|
$1,370.000
|
$5,500.000
|
$1,150.000
|
$650.000
|
$2,000.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
12,219.000
|
$20.500
|
$17.000
|
$24.700
|
$22.400
|
$26.030
|
$34.350
|
$31.000
|
$30.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
5,214.000
|
$20.000
|
$25.000
|
$24.700
|
$10.100
|
$27.840
|
$29.650
|
$10.000
|
$25.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
1,613.000
|
$50.000
|
$48.500
|
$87.010
|
$58.900
|
$27.840
|
$133.250
|
$100.000
|
$75.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
52,742.000
|
$2.000
|
$1.250
|
$1.620
|
$1.590
|
$2.170
|
$2.300
|
$1.900
|
$3.000
|
|
|
BROADCAST SEED (TEMP_WARM_COOL)
|
SY
|
52,742.000
|
$0.300
|
$0.170
|
$0.170
|
$0.120
|
$0.120
|
$0.300
|
$0.150
|
$0.500
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
52,742.000
|
$0.350
|
$0.200
|
$0.200
|
$0.160
|
$0.150
|
$0.300
|
$0.180
|
$0.500
|
|
|
VEGETATIVE WATERING
|
TGL
|
886.000
|
$42.500
|
$8.000
|
$24.500
|
$39.400
|
$61.390
|
$163.600
|
$35.000
|
$50.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_LONG)
|
SY
|
52,742.000
|
$1.400
|
$1.750
|
$1.700
|
$0.800
|
$0.790
|
$1.000
|
$1.000
|
$2.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 5)(FNAL POS)
|
CY
|
11,487.000
|
$69.000
|
$55.000
|
$70.950
|
$84.300
|
$74.340
|
$86.650
|
$95.000
|
$120.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
8,726.000
|
$5.250
|
$3.500
|
$4.820
|
$3.650
|
$3.610
|
$5.500
|
$4.300
|
$4.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,484.000
|
$122.500
|
$130.000
|
$115.900
|
$127.000
|
$125.780
|
$116.800
|
$150.000
|
$130.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
2,799.000
|
$140.000
|
$170.000
|
$121.400
|
$173.000
|
$171.150
|
$135.750
|
$205.000
|
$178.000
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
2,046.000
|
$152.500
|
$150.000
|
$123.800
|
$148.000
|
$146.400
|
$152.900
|
$175.000
|
$155.000
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
4,051.000
|
$162.500
|
$160.000
|
$157.700
|
$158.000
|
$156.710
|
$142.900
|
$187.000
|
$165.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
428.000
|
$27.000
|
$1.000
|
$100.400
|
$15.500
|
$56.710
|
$54.000
|
$165.000
|
$80.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
83.000
|
$375.000
|
$250.000
|
$334.670
|
$439.000
|
$219.860
|
$261.400
|
$268.000
|
$295.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
146.000
|
$85.000
|
$1.000
|
$18.960
|
$10.300
|
$56.960
|
$179.550
|
$6.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
6,762.000
|
$37.500
|
$7.000
|
$7.000
|
$35.200
|
$5.160
|
$4.700
|
$31.000
|
$36.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
600.000
|
$100.000
|
$15.000
|
$100.000
|
$24.800
|
$36.090
|
$222.850
|
$61.000
|
$36.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
22.000
|
$375.000
|
$350.000
|
$496.800
|
$501.000
|
$465.720
|
$533.550
|
$403.000
|
$380.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.370
|
$1,700.000
|
$1,500.000
|
$1,673.700
|
$776.000
|
$881.510
|
$1,589.950
|
$932.000
|
$2,600.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
920.000
|
$500.000
|
$450.000
|
$585.790
|
$569.000
|
$701.080
|
$616.900
|
$854.000
|
$675.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
224.000
|
$550.000
|
$700.000
|
$613.690
|
$776.000
|
$520.660
|
$795.950
|
$936.000
|
$805.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
28.000
|
$350.000
|
$270.000
|
$250.000
|
$569.000
|
$283.530
|
$246.500
|
$357.000
|
$350.000
|
|
|
CONC BOX CULV (9 FT X 8 FT)
|
LF
|
116.000
|
$1,400.000
|
$1,500.000
|
$1,697.940
|
$1,760.000
|
$1,331.770
|
$2,178.700
|
$1,460.000
|
$2,125.000
|
|
|
CONC BOX CULV (10 FT X 9 FT)
|
LF
|
30.000
|
$2,500.000
|
$2,500.000
|
$2,570.250
|
$2,120.000
|
$1,577.310
|
$3,156.900
|
$1,820.000
|
$2,615.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,838.000
|
$90.000
|
$70.000
|
$109.320
|
$93.100
|
$184.230
|
$81.950
|
$120.000
|
$160.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
27.000
|
$300.000
|
$370.000
|
$139.450
|
$136.000
|
$194.420
|
$885.000
|
$654.000
|
$240.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
13.000
|
$400.000
|
$435.000
|
$390.450
|
$204.000
|
$211.040
|
$1,024.000
|
$752.000
|
$425.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
138.000
|
$250.000
|
$160.000
|
$273.310
|
$295.000
|
$283.410
|
$220.600
|
$310.000
|
$245.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$70,000.000
|
$50,000.000
|
$52,096.710
|
$44,100.000
|
$36,085.000
|
$81,626.000
|
$94,000.000
|
$70,500.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
1.000
|
$99,000.000
|
$68,000.000
|
$66,375.890
|
$51,100.000
|
$36,085.000
|
$115,510.800
|
$118,000.000
|
$82,500.000
|
|
|
HEADWALL (CH - PW - 0)(DIA= 24 IN)(MOD)
|
EA
|
3.000
|
$8,500.000
|
$19,000.000
|
$35,140.180
|
$14,000.000
|
$21,651.000
|
$57,614.700
|
$10,800.000
|
$30,250.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
94.000
|
$1,450.000
|
$2,600.000
|
$1,840.680
|
$1,430.000
|
$3,260.020
|
$1,925.800
|
$2,000.000
|
$2,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$3,250.000
|
$2,500.000
|
$3,625.570
|
$1,790.000
|
$3,371.370
|
$2,607.500
|
$1,625.000
|
$3,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,250.000
|
$2,600.000
|
$3,904.460
|
$2,010.000
|
$3,468.280
|
$2,578.350
|
$2,560.000
|
$3,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,250.000
|
$3,500.000
|
$3,569.800
|
$2,530.000
|
$3,781.710
|
$3,318.500
|
$3,300.000
|
$4,600.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$6,500.000
|
$3,200.000
|
$6,900.000
|
$9,980.000
|
$541.280
|
$13,687.650
|
$6,340.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
74.000
|
$525.000
|
$400.000
|
$669.340
|
$569.000
|
$360.850
|
$826.800
|
$760.000
|
$725.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
3.000
|
$2,250.000
|
$2,250.000
|
$2,454.230
|
$1,600.000
|
$5,412.750
|
$4,378.850
|
$3,500.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,322.000
|
$22.500
|
$18.000
|
$27.890
|
$23.800
|
$21.650
|
$16.950
|
$36.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$639,300.000
|
$750,000.000
|
$647,077.100
|
$800,000.000
|
$765,000.000
|
$650,000.000
|
$975,000.000
|
$295,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$7,500.000
|
$15,000.000
|
$8,129.720
|
$36,110.000
|
$1,773.320
|
$9,867.000
|
$2,300.000
|
$17,825.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$12,500.000
|
$7,876.990
|
$15,000.000
|
$20,620.000
|
$21,974.150
|
$10,500.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
25.000
|
$300.000
|
$450.000
|
$210.050
|
$260.000
|
$1,031.000
|
$534.250
|
$640.000
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$150.000
|
$75.000
|
$105.030
|
$119.000
|
$154.650
|
$144.900
|
$100.000
|
$110.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
191.000
|
$42.500
|
$47.500
|
$47.500
|
$61.100
|
$60.930
|
$68.450
|
$72.000
|
$55.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
100.000
|
$80.000
|
$90.000
|
$90.000
|
$72.500
|
$72.260
|
$81.450
|
$86.000
|
$75.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
291.000
|
$12.500
|
$22.500
|
$22.500
|
$21.500
|
$21.460
|
$24.150
|
$25.000
|
$35.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,213.000
|
$5.520
|
$4.000
|
$3.650
|
$3.750
|
$3.740
|
$4.200
|
$4.500
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,213.000
|
$1.250
|
$1.000
|
$0.500
|
$1.100
|
$1.100
|
$1.300
|
$1.300
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
100.000
|
$7.880
|
$8.000
|
$7.500
|
$12.800
|
$12.730
|
$14.450
|
$15.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$2.690
|
$1.000
|
$1.000
|
$1.550
|
$1.540
|
$1.800
|
$1.800
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
929.000
|
$150.000
|
$150.000
|
$76.700
|
$139.000
|
$118.570
|
$183.250
|
$152.000
|
$170.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$8,500.000
|
$5,000.000
|
$4,588.380
|
$4,200.000
|
$6,186.000
|
$10,889.900
|
$19,600.000
|
$7,500.000
|
|
|
PTB (FUR&INST)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,410.000
|
$55.000
|
$20.000
|
$30.000
|
$15.200
|
$80.930
|
$30.150
|
$89.000
|
$90.000
|
|
|
PTB (MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,500.000
|
$30.000
|
$7.000
|
$15.000
|
$17.300
|
$10.830
|
$9.700
|
$29.000
|
$22.000
|
|
|
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
1,410.000
|
$25.000
|
$12.000
|
$13.000
|
$15.000
|
$21.140
|
$17.950
|
$33.000
|
$23.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,095.000
|
$70.000
|
$80.000
|
$74.990
|
$94.700
|
$52.580
|
$83.950
|
$94.000
|
$58.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
122.000
|
$150.000
|
$125.000
|
$102.650
|
$109.000
|
$53.610
|
$176.250
|
$31.000
|
$225.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,059.000
|
$67.500
|
$80.000
|
$61.700
|
$91.000
|
$56.710
|
$189.750
|
$95.000
|
$190.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,037.500
|
$25.500
|
$23.000
|
$28.360
|
$24.800
|
$25.030
|
$27.850
|
$38.000
|
$32.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,700.000
|
$1,500.000
|
$1,325.440
|
$1,400.000
|
$1,486.570
|
$1,566.000
|
$2,150.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
925.000
|
$6.000
|
$4.000
|
$3.180
|
$2.600
|
$8.250
|
$3.000
|
$7.000
|
$6.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
6.000
|
$150.000
|
$300.000
|
$249.180
|
$259.000
|
$154.910
|
$290.050
|
$182.000
|
$155.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,500.000
|
$4,500.000
|
$3,234.060
|
$3,100.000
|
$3,734.730
|
$3,479.900
|
$4,900.000
|
$4,220.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$500.000
|
$300.000
|
$360.520
|
$259.000
|
$428.400
|
$290.050
|
$370.000
|
$325.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$1,250.000
|
$1,000.000
|
$1,776.080
|
$853.000
|
$1,704.000
|
$992.700
|
$1,280.000
|
$1,100.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$800.000
|
$850.000
|
$858.880
|
$1,280.000
|
$1,224.230
|
$641.350
|
$875.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$9,000.000
|
$6,500.000
|
$8,562.320
|
$7,190.000
|
$9,498.160
|
$8,153.500
|
$12,700.000
|
$10,950.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
100.000
|
$35.000
|
$45.000
|
$36.530
|
$35.600
|
$51.550
|
$39.800
|
$42.000
|
$40.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
100.000
|
$35.000
|
$45.000
|
$38.970
|
$38.000
|
$51.550
|
$42.600
|
$45.000
|
$52.000
|
|
|
GATE (TY 1)
|
EA
|
2.000
|
$1,000.000
|
$1,250.000
|
$980.820
|
$956.000
|
$515.500
|
$1,073.050
|
$1,130.000
|
$1,925.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
14.000
|
$310.000
|
$325.000
|
$339.310
|
$233.000
|
$231.980
|
$365.500
|
$275.000
|
$750.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$400.000
|
$325.000
|
$381.730
|
$269.000
|
$268.060
|
$365.500
|
$320.000
|
$785.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
16.000
|
$900.000
|
$775.000
|
$954.310
|
$620.000
|
$618.600
|
$887.300
|
$735.000
|
$1,250.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
200.000
|
$25.000
|
$40.000
|
$32.000
|
$34.800
|
$16.740
|
$37.150
|
$54.000
|
$50.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
115.000
|
$25.000
|
$41.000
|
$45.000
|
$49.000
|
$16.740
|
$52.300
|
$55.000
|
$52.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
750.000
|
$1.900
|
$3.000
|
$2.700
|
$2.950
|
$2.300
|
$3.200
|
$4.000
|
$4.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,260.000
|
$2.000
|
$4.000
|
$2.700
|
$2.950
|
$2.610
|
$3.200
|
$5.400
|
$5.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
60.000
|
$2.750
|
$4.000
|
$3.350
|
$3.650
|
$2.740
|
$4.000
|
$5.400
|
$5.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
120.000
|
$2.750
|
$5.000
|
$3.350
|
$3.650
|
$5.160
|
$4.000
|
$6.700
|
$6.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
29.000
|
$685.000
|
$525.000
|
$726.340
|
$672.000
|
$670.150
|
$602.050
|
$800.000
|
$995.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
19.000
|
$950.000
|
$625.000
|
$842.980
|
$724.000
|
$721.700
|
$695.850
|
$860.000
|
$1,085.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
4.000
|
$850.000
|
$675.000
|
$922.500
|
$801.000
|
$799.030
|
$770.300
|
$850.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$825.000
|
$1,187.590
|
$905.000
|
$902.130
|
$946.550
|
$1,070.000
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
2.000
|
$1,100.000
|
$850.000
|
$1,214.100
|
$977.000
|
$974.300
|
$981.400
|
$1,160.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
122.000
|
$160.000
|
$100.000
|
$106.030
|
$103.000
|
$103.100
|
$86.950
|
$123.000
|
$115.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
|
EA
|
4.000
|
$100.000
|
$35.000
|
$77.410
|
$56.900
|
$56.710
|
$40.600
|
$67.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
59.000
|
$65.000
|
$35.000
|
$48.780
|
$46.500
|
$46.400
|
$28.850
|
$55.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
10,134.000
|
$0.500
|
$0.350
|
$0.350
|
$0.360
|
$1.550
|
$0.500
|
$0.450
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
300.000
|
$1.500
|
$0.550
|
$0.550
|
$0.410
|
$2.060
|
$0.500
|
$0.500
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
87.000
|
$4.000
|
$12.000
|
$12.000
|
$5.200
|
$6.700
|
$5.700
|
$6.100
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
2.000
|
$100.000
|
$275.000
|
$275.000
|
$103.000
|
$139.190
|
$115.950
|
$122.000
|
$80.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
2.000
|
$100.000
|
$350.000
|
$350.000
|
$103.000
|
$170.120
|
$115.950
|
$122.000
|
$80.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
210.000
|
$2.000
|
$0.420
|
$0.420
|
$0.570
|
$2.060
|
$0.800
|
$0.700
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
10,716.000
|
$0.500
|
$0.350
|
$0.350
|
$0.360
|
$1.550
|
$0.500
|
$0.400
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
15.000
|
$3.000
|
$2.500
|
$1.630
|
$17.100
|
$0.930
|
$3.700
|
$0.900
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,064.000
|
$1.750
|
$2.500
|
$1.630
|
$1.750
|
$0.930
|
$3.700
|
$1.900
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
300.000
|
$1.500
|
$1.300
|
$1.300
|
$1.400
|
$2.060
|
$1.500
|
$1.700
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
118.000
|
$12.000
|
$13.500
|
$13.500
|
$6.700
|
$6.700
|
$7.500
|
$8.000
|
$12.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
6.000
|
$225.000
|
$325.000
|
$325.000
|
$181.000
|
$139.190
|
$202.900
|
$215.000
|
$205.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
2.000
|
$275.000
|
$395.000
|
$395.000
|
$207.000
|
$170.120
|
$232.050
|
$245.000
|
$290.000
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
30,084.000
|
$0.400
|
$0.230
|
$0.230
|
$0.310
|
$0.670
|
$0.300
|
$0.400
|
$1.000
|
|
RE PM TY II (W) 8" (SLD)
|
LF
|
300.000
|
$1.000
|
$0.320
|
$0.320
|
$0.410
|
$1.030
|
$0.500
|
$0.500
|
$1.000
|
|
RE PM TY II (W) 24" (SLD)
|
LF
|
118.000
|
$4.000
|
$2.580
|
$2.500
|
$4.150
|
$3.090
|
$4.700
|
$5.000
|
$4.000
|
|
RE PM TY II (W) (ARROW)
|
EA
|
6.000
|
$85.000
|
$25.000
|
$25.000
|
$85.300
|
$103.100
|
$95.600
|
$100.000
|
$80.000
|
|
RE PM TY II (W) (WORD)
|
EA
|
2.000
|
$100.000
|
$35.000
|
$35.000
|
$95.700
|
$103.100
|
$107.300
|
$113.000
|
$80.000
|
|
RE PM TY II (Y) 6" (BRK)
|
LF
|
6,860.000
|
$1.000
|
$0.250
|
$0.250
|
$0.410
|
$0.670
|
$0.500
|
$0.500
|
$1.000
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
31,037.000
|
$0.650
|
$0.230
|
$0.230
|
$0.310
|
$0.670
|
$0.300
|
$0.400
|
$1.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
|
LF
|
30,084.000
|
$1.250
|
$1.200
|
$1.200
|
$1.050
|
$1.550
|
$1.300
|
$1.200
|
$1.000
|
|
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
|
LF
|
31,037.000
|
$1.300
|
$1.200
|
$1.200
|
$1.050
|
$1.550
|
$1.300
|
$1.200
|
$1.000
|
|
RE PROFILE PM TY I(Y)6"(BRK)(090MIL)
|
LF
|
6,860.000
|
$1.400
|
$1.300
|
$1.300
|
$1.050
|
$2.060
|
$1.300
|
$1.200
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
16.000
|
$10.000
|
$8.000
|
$8.000
|
$6.200
|
$8.250
|
$7.000
|
$7.400
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
606.000
|
$10.000
|
$7.250
|
$7.250
|
$6.200
|
$5.670
|
$7.000
|
$7.400
|
$6.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
8,400.000
|
$1.500
|
$0.950
|
$0.950
|
$0.570
|
$0.520
|
$0.800
|
$0.800
|
$1.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$27,500.000
|
$20,000.000
|
$13,000.000
|
$14,100.000
|
$37,547.360
|
$15,079.350
|
$18,800.000
|
$18,750.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
8.000
|
$375.000
|
$475.000
|
$420.000
|
$457.000
|
$341.330
|
$487.250
|
$638.000
|
$650.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$375.000
|
$475.000
|
$420.000
|
$457.000
|
$341.330
|
$487.250
|
$638.000
|
$650.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$375.000
|
$475.000
|
$420.000
|
$457.000
|
$341.330
|
$487.250
|
$638.000
|
$650.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
8.000
|
$200.000
|
$243.000
|
$190.000
|
$207.000
|
$232.660
|
$220.350
|
$326.000
|
$350.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
1,006.000
|
$2.500
|
$5.000
|
$3.000
|
$3.250
|
$2.560
|
$3.500
|
$6.700
|
$6.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$12,000.000
|
$9,000.000
|
$9,900.000
|
$10,800.000
|
$7,294.480
|
$11,483.500
|
$10,500.000
|
$9,950.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(24')LUM
|
EA
|
2.000
|
$12,000.000
|
$21,500.000
|
$13,200.000
|
$14,400.000
|
$15,434.750
|
$15,311.400
|
$24,400.000
|
$23,500.000
|
|
|
BONDING COURSE
|
GAL
|
13,363.000
|
$4.500
|
$3.500
|
$3.660
|
$3.650
|
$3.610
|
$13.000
|
$4.300
|
$4.000
|
|
|
GEOGRID REINFORCE EMBANKMENTS (TY A)
|
SY
|
8,959.000
|
$10.000
|
$3.000
|
$2.020
|
$5.500
|
$3.530
|
$4.000
|
$8.150
|
$9.000
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
4.000
|
$8,000.000
|
$8,500.000
|
$8,800.000
|
$9,580.000
|
$8,043.130
|
$10,207.550
|
$9,500.000
|
$9,000.000
|
|
|
RVDS (ADVANCE DETECTION ONLY)
|
EA
|
2.000
|
$8,000.000
|
$8,500.000
|
$13,800.000
|
$15,000.000
|
$13,149.660
|
$16,007.550
|
$9,500.000
|
$9,000.000
|
|
Totals: |
$7,909,275.610
|
$7,601,604.210
|
$7,755,025.580
|
$8,552,546.320
|
$8,686,090.054
|
$9,091,999.906
|
$9,664,285.550
|
$9,735,608.000
|