|
|
PREPARING ROW
|
STA
|
53.100
|
$1,500.000
|
$1,400.000
|
$685.000
|
$500.000
|
$2,500.000
|
$1,100.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
233.000
|
$16.000
|
$12.000
|
$22.500
|
$29.000
|
$18.600
|
$15.300
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
180.000
|
$22.000
|
$13.000
|
$30.000
|
$29.000
|
$21.800
|
$34.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,339.000
|
$15.000
|
$14.000
|
$12.000
|
$20.000
|
$25.000
|
$18.250
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
3,197.000
|
$20.000
|
$15.000
|
$6.750
|
$20.000
|
$20.000
|
$33.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
18,687.000
|
$2.000
|
$1.000
|
$1.750
|
$1.900
|
$2.800
|
$3.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
18,687.000
|
$0.500
|
$0.270
|
$0.310
|
$0.300
|
$0.290
|
$0.300
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
18,687.000
|
$0.200
|
$0.270
|
$0.310
|
$0.300
|
$0.290
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
31.600
|
$25.000
|
$10.000
|
$95.000
|
$35.000
|
$77.400
|
$42.150
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
18,687.000
|
$1.500
|
$1.100
|
$1.240
|
$1.200
|
$1.150
|
$1.150
|
|
|
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
|
CY
|
2,495.000
|
$50.000
|
$40.000
|
$75.500
|
$92.000
|
$100.000
|
$111.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
231.000
|
$178.000
|
$225.000
|
$300.000
|
$240.000
|
$250.000
|
$290.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
12,736.000
|
$6.000
|
$2.500
|
$8.750
|
$5.000
|
$3.000
|
$14.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
2,159.000
|
$4.850
|
$5.000
|
$5.980
|
$5.400
|
$5.700
|
$5.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,380.000
|
$50.000
|
$61.000
|
$73.000
|
$73.000
|
$70.800
|
$65.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
2,400.000
|
$28.000
|
$31.000
|
$35.900
|
$42.000
|
$35.400
|
$34.000
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
809.000
|
$3.500
|
$15.000
|
$16.750
|
$7.000
|
$16.000
|
$14.000
|
|
|
CEM STABIL BKFL
|
CY
|
30.500
|
$150.000
|
$250.000
|
$425.000
|
$230.000
|
$251.000
|
$380.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$1,630.000
|
$750.000
|
$1,760.000
|
$1,840.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
16.400
|
$565.000
|
$550.000
|
$582.000
|
$550.000
|
$835.000
|
$1,150.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
11.000
|
$145.000
|
$215.000
|
$231.000
|
$125.000
|
$269.000
|
$250.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$6,500.000
|
$11,500.000
|
$17,063.000
|
$16,000.000
|
$10,300.000
|
$5,200.000
|
|
|
SET (TY II) (18 IN) (HDPE) (6: 1) (P)
|
EA
|
34.000
|
$1,400.000
|
$1,750.000
|
$1,374.000
|
$1,800.000
|
$1,300.000
|
$2,100.000
|
|
|
SET (TY II) (24 IN) (HDPE) (6: 1) (P)
|
EA
|
10.000
|
$1,700.000
|
$2,100.000
|
$1,676.000
|
$2,100.000
|
$1,750.000
|
$2,960.000
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$600.000
|
$1,200.000
|
$712.000
|
$500.000
|
$1,190.000
|
$2,050.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$2,000.000
|
$1,200.000
|
$1,948.000
|
$1,300.000
|
$1,260.000
|
$3,080.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
3.000
|
$2,000.000
|
$1,200.000
|
$1,950.000
|
$1,300.000
|
$888.000
|
$3,790.000
|
|
|
REMOV STR (PIPE)
|
LF
|
883.000
|
$22.000
|
$12.000
|
$29.500
|
$18.000
|
$13.700
|
$13.650
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$185,000.000
|
$245,000.000
|
$110,164.000
|
$200,000.000
|
$240,000.000
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$7,000.000
|
$18,500.000
|
$10,531.000
|
$800.000
|
$10,000.000
|
$3,050.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
90.000
|
$35.000
|
$25.000
|
$28.270
|
$28.000
|
$26.400
|
$25.650
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
796.000
|
$50.000
|
$32.000
|
$36.190
|
$36.000
|
$33.800
|
$32.800
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
886.000
|
$13.500
|
$20.000
|
$22.620
|
$23.000
|
$21.200
|
$20.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,565.000
|
$3.500
|
$0.400
|
$4.520
|
$4.500
|
$4.250
|
$4.100
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,565.000
|
$1.000
|
$1.000
|
$1.130
|
$1.100
|
$1.050
|
$1.050
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
100.000
|
$8.000
|
$4.000
|
$4.520
|
$4.500
|
$4.250
|
$4.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$2.000
|
$1.000
|
$1.130
|
$1.100
|
$1.050
|
$1.050
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
36.000
|
$85.000
|
$35.000
|
$39.580
|
$40.000
|
$37.000
|
$35.900
|
|
|
INTERSECTIONS (ACP)
|
SY
|
506.000
|
$60.000
|
$70.000
|
$55.050
|
$84.000
|
$125.000
|
$47.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
184.000
|
$100.000
|
$100.000
|
$118.000
|
$120.000
|
$100.000
|
$188.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,495.000
|
$55.000
|
$85.000
|
$71.800
|
$110.000
|
$125.000
|
$115.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$30.000
|
$28.000
|
$29.950
|
$31.000
|
$28.000
|
$27.150
|
|
|
MTL BM GD FEN TRANS (31"-28")(25')
|
EA
|
4.000
|
$1,200.000
|
$1,000.000
|
$802.340
|
$1,100.000
|
$750.000
|
$730.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$2.500
|
$3.000
|
$2.050
|
$3.400
|
$1.900
|
$1.850
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$4,500.000
|
$3,700.120
|
$3,800.000
|
$3,460.000
|
$3,360.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
2.000
|
$1,200.000
|
$1,400.000
|
$383.130
|
$1,600.000
|
$358.000
|
$350.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$250.000
|
$306.510
|
$28.000
|
$287.000
|
$280.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
8.000
|
$260.000
|
$330.000
|
$320.070
|
$318.000
|
$299.000
|
$280.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$280.000
|
$360.000
|
$347.210
|
$344.000
|
$325.000
|
$310.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
4.000
|
$730.000
|
$1,000.000
|
$966.990
|
$1,000.000
|
$904.000
|
$860.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
32.000
|
$625.000
|
$710.000
|
$692.160
|
$690.000
|
$647.000
|
$310.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$775.000
|
$900.000
|
$876.510
|
$870.000
|
$819.000
|
$780.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$100.000
|
$150.000
|
$133.460
|
$133.000
|
$125.000
|
$118.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
6.000
|
$60.000
|
$55.000
|
$62.200
|
$62.000
|
$89.900
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
19.000
|
$35.000
|
$29.000
|
$32.740
|
$33.000
|
$31.700
|
$30.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
22,060.000
|
$1.200
|
$0.550
|
$0.620
|
$0.700
|
$0.580
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
44.000
|
$15.000
|
$15.000
|
$16.960
|
$18.000
|
$15.900
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
22,060.000
|
$1.200
|
$0.550
|
$0.620
|
$1.400
|
$0.580
|
$0.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
100.000
|
$2.000
|
$2.000
|
$1.130
|
$2.200
|
$2.050
|
$6.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
280.000
|
$3.480
|
$9.000
|
$10.180
|
$11.000
|
$9.500
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
26.000
|
$8.560
|
$12.000
|
$13.570
|
$14.000
|
$12.700
|
$10.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
12,564.000
|
$0.700
|
$0.900
|
$1.020
|
$1.100
|
$0.950
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
630.000
|
$1.000
|
$0.900
|
$1.020
|
$1.100
|
$0.950
|
$5.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
9,551.000
|
$0.750
|
$0.900
|
$1.020
|
$1.100
|
$0.950
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
153.000
|
$5.000
|
$8.000
|
$9.050
|
$10.000
|
$8.500
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,000.000
|
$0.600
|
$2.600
|
$2.940
|
$6.100
|
$2.750
|
$1.000
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$5,500.000
|
$10,000.000
|
$7,828.660
|
$7,800.000
|
$6,770.000
|
$6,600.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
1,781.000
|
$115.000
|
$115.000
|
$131.630
|
$125.000
|
$125.000
|
$116.000
|
|
|
D-GR HMA TY-D PG 76-22 (EXEMPT)
|
TON
|
2,305.000
|
$120.000
|
$145.000
|
$168.730
|
$180.000
|
$161.000
|
$150.000
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
1,347.000
|
$150.000
|
$179.000
|
$201.040
|
$205.000
|
$192.000
|
$180.000
|
|
|
BONDING COURSE
|
GAL
|
4,657.000
|
$3.500
|
$4.300
|
$5.150
|
$5.700
|
$4.900
|
$5.050
|
|
|
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
|
LF
|
230.000
|
$65.000
|
$75.000
|
$89.750
|
$138.000
|
$70.800
|
$91.100
|
|
|
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
|
LF
|
1,000.000
|
$40.000
|
$65.000
|
$48.000
|
$106.000
|
$70.800
|
$78.600
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$7,000.000
|
$12,000.000
|
$3,918.000
|
$5,100.000
|
$17,500.000
|
$16,600.000
|
|
|
TMA (STATIONARY)
|
DAY
|
180.000
|
$200.000
|
$150.000
|
$150.000
|
$170.000
|
$116.000
|
$480.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
160.000
|
$80.000
|
$55.000
|
$115.000
|
$95.000
|
$94.500
|
$52.600
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
10.000
|
$2,200.000
|
$350.000
|
$1,232.000
|
$1,300.000
|
$793.000
|
$2,990.000
|
|
|
SUBSURFACE UTIL LOCATE (WITHIN RDBED)
|
EA
|
5.000
|
$3,200.000
|
$700.000
|
$6,156.000
|
$4,500.000
|
$1,770.000
|
$2,990.000
|
|
Totals: |
$2,292,119.060
|
$2,496,797.280
|
$2,622,043.980
|
$2,881,673.900
|
$2,963,512.800
|
$3,074,140.590
|