|
|
PREPARING ROW
|
AC
|
0.330
|
$5,000.000
|
$40,000.000
|
$4,000.000
|
$50,500.000
|
$10,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(6"-9")
|
SY
|
7,467.000
|
$6.000
|
$4.500
|
$7.600
|
$3.450
|
$9.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
24,859.000
|
$10.000
|
$10.000
|
$5.660
|
$18.000
|
$9.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
6,360.000
|
$18.000
|
$9.000
|
$13.680
|
$34.000
|
$1.500
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
116,329.000
|
$1.000
|
$1.100
|
$3.000
|
$1.100
|
$0.150
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
116,329.000
|
$0.200
|
$0.120
|
$0.140
|
$0.090
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
58,165.000
|
$0.100
|
$0.100
|
$0.100
|
$0.060
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
58,165.000
|
$0.100
|
$0.100
|
$0.110
|
$0.070
|
$28.500
|
|
|
VEGETATIVE WATERING
|
MG
|
1,140.000
|
$10.000
|
$10.000
|
$30.580
|
$27.000
|
$160.000
|
|
|
PROOF ROLLING
|
HR
|
117.000
|
$150.000
|
$60.000
|
$200.000
|
$165.000
|
$160.000
|
|
|
CEMENT
|
TON
|
540.000
|
$150.000
|
$165.000
|
$150.000
|
$165.000
|
$150.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
59,910.000
|
$2.000
|
$4.100
|
$3.000
|
$3.000
|
$3.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,096.000
|
$12.000
|
$7.500
|
$4.500
|
$7.500
|
$3.600
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
17,400.000
|
$72.000
|
$97.120
|
$74.000
|
$106.400
|
$100.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
16,426.000
|
$115.000
|
$110.080
|
$90.000
|
$95.500
|
$105.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
374.000
|
$430.000
|
$480.000
|
$513.500
|
$495.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
133.000
|
$450.000
|
$530.000
|
$513.500
|
$495.000
|
$500.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
32.000
|
$450.000
|
$1,200.000
|
$450.020
|
$330.000
|
$1,000.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
14.000
|
$400.000
|
$1,500.000
|
$535.640
|
$495.000
|
$1,200.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
15.000
|
$480.000
|
$1,000.000
|
$594.450
|
$525.000
|
$1,300.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
15.000
|
$900.000
|
$1,500.000
|
$765.600
|
$635.000
|
$1,400.000
|
|
|
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
|
LF
|
8.000
|
$900.000
|
$1,400.000
|
$683.950
|
$690.000
|
$1,400.000
|
|
|
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
|
LF
|
8.000
|
$1,100.000
|
$1,800.000
|
$1,070.520
|
$745.000
|
$1,500.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
6.000
|
$5,300.000
|
$7,300.000
|
$6,198.700
|
$2,300.000
|
$5,000.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
4.000
|
$6,000.000
|
$7,600.000
|
$7,934.200
|
$3,500.000
|
$555.000
|
|
|
WINGWALL (PW - 2) (HW=3 FT)
|
EA
|
4.000
|
$13,500.000
|
$7,800.000
|
$8,980.000
|
$4,700.000
|
$6,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
8.000
|
$11,000.000
|
$12,000.000
|
$14,023.870
|
$6,700.000
|
$6,500.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$16,000.000
|
$17,000.000
|
$26,874.430
|
$15,000.000
|
$7,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
1.000
|
$18,000.000
|
$22,000.000
|
$41,956.920
|
$22,500.000
|
$7,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
20.000
|
$2,000.000
|
$1,700.000
|
$6,285.220
|
$2,800.000
|
$2,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
21.000
|
$1,600.000
|
$1,300.000
|
$1,658.000
|
$550.000
|
$3,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$480,000.000
|
$488,000.000
|
$772,870.160
|
$620,000.000
|
$625,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$7,500.000
|
$9,100.000
|
$40,000.000
|
$19,000.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
760.000
|
$30.000
|
$28.000
|
$21.640
|
$22.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
760.000
|
$10.000
|
$4.000
|
$9.070
|
$11.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
20,035.000
|
$2.500
|
$3.000
|
$2.030
|
$2.100
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
20,035.000
|
$0.800
|
$0.500
|
$0.540
|
$0.550
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,900.000
|
$5.000
|
$4.500
|
$2.650
|
$2.700
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,900.000
|
$1.000
|
$1.000
|
$0.650
|
$0.660
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
435.000
|
$35.000
|
$35.000
|
$62.670
|
$78.500
|
$15.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
721.000
|
$22.000
|
$16.000
|
$65.270
|
$23.000
|
$10.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
66,102.000
|
$0.250
|
$0.150
|
$0.080
|
$0.100
|
$0.220
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
32,618.000
|
$0.250
|
$0.150
|
$0.170
|
$0.170
|
$0.220
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,675.000
|
$18.000
|
$20.000
|
$22.180
|
$22.500
|
$25.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$3.000
|
$5.000
|
$1.890
|
$1.950
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,400.000
|
$2,600.000
|
$2,596.830
|
$2,600.000
|
$2,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$600.000
|
$216.400
|
$220.000
|
$200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$470.000
|
$900.000
|
$789.760
|
$805.000
|
$400.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
17.000
|
$380.000
|
$550.000
|
$719.530
|
$735.000
|
$375.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$150.000
|
$100.000
|
$92.520
|
$110.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
158.000
|
$55.000
|
$70.000
|
$69.240
|
$115.000
|
$64.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
27.000
|
$25.000
|
$35.000
|
$21.640
|
$22.000
|
$20.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
58.000
|
$65.000
|
$75.000
|
$73.580
|
$115.000
|
$68.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
66,978.000
|
$0.200
|
$0.170
|
$0.180
|
$0.180
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
66,978.000
|
$0.250
|
$0.170
|
$0.180
|
$0.180
|
$0.160
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,350.000
|
$1.250
|
$0.750
|
$0.490
|
$1.100
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
66,682.000
|
$0.350
|
$0.400
|
$0.410
|
$0.420
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,257.000
|
$0.400
|
$0.400
|
$0.410
|
$0.420
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
47,615.000
|
$0.350
|
$0.400
|
$0.410
|
$0.420
|
$0.380
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
814.000
|
$3.600
|
$3.450
|
$3.510
|
$3.600
|
$3.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
220,426.000
|
$0.400
|
$0.200
|
$0.490
|
$0.550
|
$0.450
|
|
|
NO. OF WORKING DAYS
|
$/D
|
2,500.000
|
$195.000
|
$150.000
|
$150.000
|
$230.000
|
$190.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$11,000.000
|
$20,000.000
|
$8,000.000
|
$18,000.000
|
$60,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$30.000
|
$40.000
|
$120.870
|
$88.500
|
$100.000
|
|
Totals: |
$6,037,764.450
|
$6,427,095.580
|
$6,594,748.590
|
$7,024,162.580
|
$8,350,088.130
|