EXCAVATION (ROADWAY)
|
CY
|
5,484.000
|
$15.000
|
$11.700
|
$17.000
|
$15.500
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
17,479.000
|
$25.000
|
$30.710
|
$20.000
|
$25.500
|
|
|
|
BACKFILL (TY A OR B)
|
STA
|
289.000
|
$150.000
|
$225.000
|
$360.000
|
$245.000
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
151,014.000
|
$0.100
|
$0.120
|
$0.120
|
$0.130
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
151,014.000
|
$0.100
|
$0.130
|
$0.120
|
$0.130
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
302,028.000
|
$0.150
|
$0.130
|
$0.120
|
$0.120
|
|
|
|
VEGETATIVE WATERING
|
MG
|
1,272.000
|
$30.000
|
$40.000
|
$8.000
|
$25.500
|
|
|
|
CEMENT
|
TON
|
1,196.000
|
$160.000
|
$275.000
|
$230.000
|
$245.000
|
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
82,805.000
|
$3.900
|
$4.350
|
$3.900
|
$3.700
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
20,702.000
|
$4.250
|
$5.000
|
$6.000
|
$5.600
|
|
|
|
PLAN & TEXT CONC PAV(0" TO 1-1/2")
|
SY
|
4,236.000
|
$3.250
|
$3.000
|
$5.000
|
$4.750
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
132.000
|
$600.000
|
$702.000
|
$640.000
|
$620.000
|
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
312.000
|
$25.000
|
$75.360
|
$56.000
|
$68.000
|
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
11,273.000
|
$5.000
|
$4.040
|
$9.000
|
$11.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,250.000
|
$1,521.000
|
$0.000
|
$0.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,800.000
|
$2,574.000
|
$0.000
|
$0.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
242.000
|
$25.000
|
$17.550
|
$16.000
|
$15.500
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$609,184.850
|
$400,000.000
|
$660,000.000
|
$690,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$12,000.000
|
$6,000.000
|
$10,000.000
|
$14,000.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
24,515.000
|
$3.000
|
$3.800
|
$2.500
|
$2.500
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
24,515.000
|
$1.000
|
$1.170
|
$0.950
|
$0.930
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
10,700.000
|
$3.500
|
$4.970
|
$3.000
|
$3.050
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
10,700.000
|
$1.000
|
$0.880
|
$0.900
|
$0.880
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
639.000
|
$45.000
|
$39.000
|
$67.000
|
$5.650
|
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,514.000
|
$25.000
|
$18.000
|
$40.000
|
$27.000
|
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
70,267.000
|
$0.250
|
$0.230
|
$0.200
|
$0.190
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,200.000
|
$25.000
|
$33.930
|
$25.000
|
$25.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,700.000
|
$2,925.000
|
$2,000.000
|
$2,200.000
|
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
4.000
|
$1,200.000
|
$1,784.250
|
$1,200.000
|
$1,100.000
|
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
4.000
|
$650.000
|
$760.500
|
$850.000
|
$825.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
900.000
|
$1.000
|
$3.510
|
$3.200
|
$3.100
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,850.000
|
$4,299.750
|
$3,100.000
|
$3,000.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$351.000
|
$320.000
|
$310.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
21.000
|
$550.000
|
$994.500
|
$720.000
|
$705.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$600.000
|
$1,228.500
|
$820.000
|
$800.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
2.000
|
$475.000
|
$1,316.250
|
$820.000
|
$800.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$750.000
|
$1,433.250
|
$1,000.000
|
$980.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$90.000
|
$117.000
|
$110.000
|
$105.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
2.000
|
$25.000
|
$23.400
|
$36.000
|
$31.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
29.000
|
$45.000
|
$46.800
|
$41.000
|
$40.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
58.000
|
$100.000
|
$163.800
|
$85.000
|
$82.500
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,175.000
|
$1.000
|
$1.000
|
$0.650
|
$1.050
|
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
140,534.000
|
$0.900
|
$0.780
|
$0.700
|
$0.690
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
10,735.000
|
$0.400
|
$0.560
|
$0.500
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
79,086.000
|
$0.400
|
$0.530
|
$0.480
|
$0.460
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
69.000
|
$15.000
|
$29.250
|
$27.000
|
$26.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,526.000
|
$3.500
|
$5.560
|
$5.000
|
$4.900
|
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
19,364.000
|
$90.000
|
$97.250
|
$103.000
|
$100.000
|
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
23,142.000
|
$95.000
|
$118.000
|
$119.000
|
$119.460
|
|
|
|
D-GR HMA TY-D PG70-28 (LEVEL-UP)
|
TON
|
903.000
|
$95.000
|
$143.250
|
$142.000
|
$135.000
|
|
|
|
BONDING COURSE
|
GAL
|
16,197.000
|
$3.750
|
$5.500
|
$4.200
|
$3.700
|
|
|
|
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
|
LF
|
110.000
|
$105.000
|
$93.600
|
$0.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
|
LF
|
126.000
|
$90.000
|
$70.200
|
$0.000
|
$0.000
|
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
8.000
|
$250.000
|
$526.500
|
$360.000
|
$415.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
190.000
|
$250.000
|
$100.000
|
$250.000
|
$230.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$275.000
|
$1.000
|
$250.000
|
$930.000
|
|
1
|
|
CMP (GAL STL 18 IN)
|
LF
|
126.000
|
$90.000
|
$0.000
|
$74.000
|
$72.000
|
|
2
|
|
CMP (GAL STL 24 IN)
|
LF
|
110.000
|
$105.000
|
$0.000
|
$93.000
|
$91.000
|
|
3
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$1,250.000
|
$0.000
|
$1,400.000
|
$1,400.000
|
|
4
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$1,800.000
|
$0.000
|
$1,850.000
|
$1,800.000
|
|
Totals: |
$6,930,842.350
|
$7,724,536.690
|
$7,914,884.100
|
$7,974,153.620
|