REMOVING CONC (DRIVEWAYS)
|
SY
|
140.000
|
$20.000
|
$25.000
|
$70.000
|
$17.710
|
$27.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,246.000
|
$20.000
|
$20.000
|
$90.000
|
$16.500
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
3,223.000
|
$33.000
|
$62.000
|
$70.000
|
$27.500
|
$76.500
|
|
|
BACKFILL (TY B)
|
STA
|
307.000
|
$280.000
|
$200.000
|
$430.000
|
$409.940
|
$130.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
16,997.000
|
$0.500
|
$0.100
|
$0.100
|
$0.190
|
$0.180
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
16,997.000
|
$0.500
|
$0.130
|
$0.100
|
$0.220
|
$0.200
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
33,994.000
|
$0.160
|
$0.130
|
$0.150
|
$0.190
|
$0.180
|
|
|
VEGETATIVE WATERING
|
MG
|
294.000
|
$30.000
|
$35.000
|
$40.000
|
$55.220
|
$34.500
|
|
|
CEMENT
|
TON
|
523.000
|
$250.000
|
$340.000
|
$320.000
|
$357.500
|
$320.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
30,592.000
|
$3.500
|
$10.000
|
$6.500
|
$7.700
|
$14.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
7,649.000
|
$6.000
|
$6.550
|
$8.000
|
$12.960
|
$6.900
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
8,515.000
|
$4.950
|
$3.050
|
$5.500
|
$7.150
|
$4.700
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,500.000
|
$65.500
|
$75.000
|
$90.000
|
$110.000
|
$115.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
1,511.000
|
$4.160
|
$8.240
|
$9.000
|
$8.800
|
$24.500
|
|
|
CEM STABIL BKFL
|
CY
|
108.000
|
$180.000
|
$295.000
|
$260.000
|
$275.000
|
$310.000
|
|
|
CUT & RESTORING PAV
|
SY
|
138.000
|
$120.000
|
$53.100
|
$48.000
|
$313.500
|
$140.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
27.000
|
$10.000
|
$29.500
|
$26.000
|
$22.000
|
$31.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
124.000
|
$36.000
|
$53.100
|
$48.000
|
$110.000
|
$55.500
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
114.000
|
$700.000
|
$1,091.500
|
$980.000
|
$1,100.000
|
$1,100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
268.000
|
$150.000
|
$118.000
|
$110.000
|
$187.000
|
$125.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
180.000
|
$200.000
|
$141.600
|
$125.000
|
$247.500
|
$150.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
46.000
|
$250.000
|
$206.500
|
$185.000
|
$330.000
|
$215.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$6,000.000
|
$11,505.000
|
$800.000
|
$6,600.000
|
$12,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
4.000
|
$6,975.000
|
$15,340.000
|
$14,000.000
|
$8,250.000
|
$16,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$8,916.000
|
$11,505.000
|
$10,500.000
|
$13,200.000
|
$12,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
3.000
|
$9,404.000
|
$14,750.000
|
$13,000.000
|
$11,000.000
|
$15,500.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$12,667.000
|
$22,420.000
|
$20,000.000
|
$16,500.000
|
$23,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
34.000
|
$1,320.000
|
$1,947.000
|
$1,800.000
|
$1,320.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
9.000
|
$2,000.000
|
$2,006.000
|
$1,800.000
|
$2,200.000
|
$2,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,200.000
|
$2,360.000
|
$2,200.000
|
$3,080.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,650.000
|
$2,360.000
|
$2,200.000
|
$3,080.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,590.000
|
$3,540.000
|
$3,200.000
|
$4,400.000
|
$3,700.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,500.000
|
$4,425.000
|
$4,000.000
|
$4,950.000
|
$4,600.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,600.000
|
$590.000
|
$530.000
|
$2,200.000
|
$615.000
|
|
|
REMOV STR (PIPE)
|
LF
|
558.000
|
$15.000
|
$14.160
|
$13.000
|
$71.500
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$368,207.350
|
$490,000.000
|
$373,000.000
|
$500,000.000
|
$675,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$6,000.000
|
$9,815.750
|
$5,000.000
|
$12,648.650
|
$20,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
975.000
|
$4.000
|
$4.500
|
$4.000
|
$4.170
|
$4.050
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
975.000
|
$0.750
|
$1.800
|
$1.600
|
$1.270
|
$1.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
560.000
|
$6.000
|
$6.200
|
$6.000
|
$5.060
|
$4.950
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
560.000
|
$1.500
|
$1.500
|
$1.400
|
$1.270
|
$1.250
|
|
|
DRIVEWAYS (CONC)
|
SY
|
140.000
|
$105.000
|
$141.600
|
$130.000
|
$275.000
|
$170.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,104.000
|
$54.000
|
$37.000
|
$93.000
|
$57.650
|
$94.000
|
|
|
TURNOUTS (ACP)
|
SY
|
308.000
|
$58.000
|
$37.000
|
$76.000
|
$56.720
|
$94.500
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,089.000
|
$25.000
|
$33.000
|
$30.000
|
$27.500
|
$57.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
63,940.000
|
$0.210
|
$0.370
|
$0.320
|
$0.220
|
$0.090
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
31,970.000
|
$0.270
|
$0.370
|
$0.320
|
$0.330
|
$0.120
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$374.000
|
$383.500
|
$240.000
|
$379.500
|
$285.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
13.000
|
$300.000
|
$354.000
|
$250.000
|
$324.500
|
$295.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$700.000
|
$1,003.000
|
$850.000
|
$852.500
|
$985.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$800.000
|
$1,032.500
|
$920.000
|
$1,094.500
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$945.000
|
$1,050.500
|
$1,000.000
|
$1,155.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
16.000
|
$475.000
|
$619.500
|
$600.000
|
$544.500
|
$675.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$118.220
|
$118.000
|
$110.000
|
$115.500
|
$125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
36.000
|
$37.000
|
$41.300
|
$48.000
|
$17.050
|
$35.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
36.000
|
$104.000
|
$70.800
|
$68.000
|
$93.500
|
$80.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,569.000
|
$1.250
|
$1.200
|
$0.700
|
$2.040
|
$1.800
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
63,600.000
|
$0.730
|
$0.790
|
$0.700
|
$0.640
|
$0.710
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
34,600.000
|
$0.700
|
$0.900
|
$0.800
|
$0.660
|
$0.740
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
11,565.000
|
$0.730
|
$0.790
|
$0.700
|
$0.640
|
$0.710
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
6,731.000
|
$100.000
|
$123.000
|
$130.500
|
$154.000
|
$160.000
|
|
|
D-GR HMA TY-D PG64-22 (LEVEL-UP)
|
TON
|
783.000
|
$125.000
|
$150.000
|
$210.000
|
$176.000
|
$250.000
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
11,090.000
|
$115.000
|
$128.000
|
$135.000
|
$165.000
|
$175.000
|
|
|
BONDING COURSE
|
GAL
|
7,882.000
|
$4.030
|
$5.650
|
$5.100
|
$7.700
|
$2.650
|
|
|
THERMO PIPE(18")(PP)(TY S)(TY II)
|
LF
|
534.000
|
$28.000
|
$88.500
|
$79.000
|
$74.800
|
$92.500
|
|
|
THERMO PIPE(24")(PP)(TY S)(TY II)
|
LF
|
154.000
|
$33.000
|
$106.200
|
$95.000
|
$170.500
|
$110.000
|
|
|
TMA (STATIONARY)
|
DAY
|
283.000
|
$210.000
|
$267.000
|
$50.000
|
$218.680
|
$310.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
8.000
|
$250.000
|
$1.000
|
$50.000
|
$290.540
|
$1,200.000
|
|
Totals: |
$4,131,341.810
|
$5,191,085.150
|
$5,271,226.700
|
$6,035,511.710
|
$6,810,311.530
|