|
|
BACKFILL (TY A OR B)
|
STA
|
1,819.230
|
$150.000
|
$117.600
|
$175.000
|
$100.000
|
$262.000
|
$250.000
|
$99.330
|
$162.000
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
6,026.000
|
$104.000
|
$71.440
|
$70.000
|
$60.000
|
$113.000
|
$100.000
|
$97.950
|
$104.000
|
|
|
ASPH (AC-15P OR AC-20-5TR)
|
GAL
|
253,352.000
|
$3.000
|
$2.990
|
$2.400
|
$2.700
|
$2.450
|
$3.250
|
$2.610
|
$2.650
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
2,668.000
|
$28.000
|
$26.240
|
$27.000
|
$36.000
|
$34.000
|
$40.000
|
$22.270
|
$40.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
|
SY
|
5,473.000
|
$35.000
|
$34.930
|
$50.000
|
$50.000
|
$46.000
|
$50.000
|
$31.000
|
$62.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
5,231.000
|
$2.000
|
$0.980
|
$1.600
|
$2.300
|
$2.650
|
$2.000
|
$11.670
|
$1.900
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
114,622.000
|
$2.000
|
$1.630
|
$2.100
|
$2.000
|
$2.000
|
$2.000
|
$4.790
|
$3.250
|
|
|
PLANE ASPH CONC PAV (3 1/2")
|
SY
|
5,590.000
|
$3.000
|
$2.280
|
$3.100
|
$2.150
|
$3.400
|
$2.000
|
$10.920
|
$4.400
|
|
|
PLANE ASPH CONC PAV (1/2")
|
SY
|
18,228.000
|
$1.500
|
$0.330
|
$1.000
|
$1.650
|
$2.700
|
$2.000
|
$3.350
|
$3.350
|
|
|
PLANE ASPH CONC PAV (2.5" TO 4")
|
SY
|
5,966.000
|
$4.000
|
$2.110
|
$3.000
|
$2.050
|
$4.200
|
$2.000
|
$10.230
|
$4.100
|
|
|
PLANE ASPH CONC PAV (1 1/2" TO 3 1/2")
|
SY
|
10,944.000
|
$4.000
|
$1.630
|
$2.200
|
$2.200
|
$2.600
|
$2.000
|
$5.580
|
$3.150
|
|
|
PLANE ASPH CONC PAV (1 1/2" TO 2 1/2")
|
SY
|
13,969.000
|
$4.000
|
$1.300
|
$2.000
|
$2.550
|
$2.000
|
$2.000
|
$4.370
|
$2.500
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
36.000
|
$450.000
|
$475.000
|
$450.000
|
$540.000
|
$447.000
|
$600.000
|
$550.000
|
$659.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
38.000
|
$900.000
|
$475.000
|
$425.000
|
$540.000
|
$421.000
|
$650.000
|
$550.000
|
$659.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
419.000
|
$480.000
|
$475.000
|
$415.000
|
$540.000
|
$412.000
|
$600.000
|
$660.000
|
$480.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
902.000
|
$40.000
|
$26.000
|
$26.000
|
$26.650
|
$39.250
|
$38.200
|
$44.000
|
$28.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
553.000
|
$250.000
|
$153.200
|
$140.000
|
$130.000
|
$200.000
|
$200.000
|
$247.500
|
$137.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
557.000
|
$120.000
|
$90.250
|
$92.000
|
$73.000
|
$70.000
|
$150.000
|
$80.470
|
$74.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
1,048.000
|
$200.000
|
$195.000
|
$228.000
|
$95.000
|
$180.000
|
$200.000
|
$23.540
|
$264.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,400,000.000
|
$1,018,212.910
|
$1,058,000.000
|
$1,067,000.000
|
$850,000.000
|
$1,000,000.000
|
$350,000.000
|
$380,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$8,500.000
|
$2,881.270
|
$2,500.000
|
$7,500.000
|
$11,000.000
|
$10,000.000
|
$4,500.000
|
$2,560.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,040.000
|
$5.000
|
$4.250
|
$4.250
|
$4.500
|
$5.000
|
$5.000
|
$6.600
|
$4.550
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
5,220.000
|
$6.000
|
$4.300
|
$4.300
|
$4.550
|
$7.750
|
$6.000
|
$7.700
|
$5.700
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
6,260.000
|
$2.000
|
$1.000
|
$1.000
|
$1.050
|
$0.950
|
$1.000
|
$1.100
|
$1.100
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
840.000
|
$30.000
|
$23.100
|
$42.000
|
$35.200
|
$37.000
|
$50.000
|
$17.770
|
$24.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
7,980.000
|
$8.000
|
$10.500
|
$8.000
|
$12.500
|
$5.500
|
$20.000
|
$17.150
|
$14.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
840.000
|
$15.000
|
$12.600
|
$14.000
|
$23.850
|
$17.300
|
$25.000
|
$17.770
|
$18.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,840.000
|
$30.000
|
$26.280
|
$46.000
|
$68.500
|
$29.000
|
$22.000
|
$44.000
|
$38.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
363,846.000
|
$0.500
|
$0.100
|
$0.140
|
$0.110
|
$0.170
|
$0.100
|
$0.110
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,675.000
|
$22.000
|
$21.730
|
$22.000
|
$22.750
|
$21.510
|
$25.000
|
$23.650
|
$23.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
30.000
|
$2,000.000
|
$1,903.850
|
$1,900.000
|
$1,865.000
|
$1,385.000
|
$1,700.000
|
$1,661.000
|
$1,480.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,400.000
|
$1,086.760
|
$1,100.000
|
$1,140.000
|
$1,076.000
|
$1,300.000
|
$1,199.000
|
$1,150.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$1,200.000
|
$887.790
|
$900.000
|
$930.000
|
$879.000
|
$1,000.000
|
$693.000
|
$940.000
|
|
|
CONNECTOR PLATE FOR THRIE BEAM
|
EA
|
20.000
|
$800.000
|
$349.460
|
$350.000
|
$365.000
|
$346.000
|
$1,000.000
|
$737.000
|
$370.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,938.000
|
$2.000
|
$1.110
|
$1.100
|
$1.150
|
$1.100
|
$2.000
|
$1.650
|
$1.200
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
32.000
|
$300.000
|
$95.950
|
$100.000
|
$100.500
|
$95.000
|
$200.000
|
$3,080.000
|
$102.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$250.000
|
$105.040
|
$106.000
|
$110.000
|
$104.000
|
$300.000
|
$209.000
|
$111.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
32.000
|
$2,500.000
|
$2,492.680
|
$2,500.000
|
$2,600.000
|
$2,468.000
|
$2,800.000
|
$3,080.000
|
$2,640.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
32.000
|
$210.000
|
$55.550
|
$56.000
|
$58.250
|
$55.000
|
$200.000
|
$220.000
|
$59.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
11.000
|
$1,300.000
|
$1,260.000
|
$134.000
|
$895.000
|
$775.000
|
$750.000
|
$1,650.000
|
$828.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$800.000
|
$840.000
|
$1,472.000
|
$650.000
|
$500.000
|
$750.000
|
$825.000
|
$534.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$9,500.000
|
$8,925.000
|
$11,800.000
|
$8,000.000
|
$6,950.000
|
$9,000.000
|
$7,865.000
|
$7,430.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$700.000
|
$750.000
|
$760.000
|
$795.000
|
$942.000
|
$825.000
|
$1,037.300
|
$802.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
4.000
|
$1,750.000
|
$1,400.000
|
$1,430.000
|
$1,400.000
|
$2,477.000
|
$1,500.000
|
$2,724.700
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$95.000
|
$110.000
|
$112.000
|
$115.000
|
$427.000
|
$120.000
|
$192.500
|
$118.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
4.000
|
$750.000
|
$150.000
|
$150.000
|
$160.000
|
$825.000
|
$175.000
|
$630.300
|
$160.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
48.000
|
$70.000
|
$75.000
|
$75.000
|
$79.000
|
$70.500
|
$66.000
|
$77.550
|
$80.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
110.000
|
$20.000
|
$15.000
|
$15.000
|
$16.000
|
$13.500
|
$16.500
|
$14.850
|
$16.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
48.000
|
$65.000
|
$70.000
|
$70.000
|
$74.000
|
$70.500
|
$77.000
|
$77.550
|
$75.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
110.000
|
$20.000
|
$15.000
|
$15.000
|
$16.000
|
$13.500
|
$16.500
|
$14.850
|
$16.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
32.000
|
$100.000
|
$70.000
|
$70.000
|
$74.000
|
$72.500
|
$77.000
|
$79.750
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,230.000
|
$0.500
|
$0.260
|
$0.300
|
$0.690
|
$0.290
|
$0.700
|
$0.290
|
$0.700
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
12,750.000
|
$0.500
|
$0.260
|
$0.300
|
$0.690
|
$0.290
|
$0.700
|
$0.290
|
$0.700
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
12,750.000
|
$0.500
|
$0.260
|
$0.300
|
$0.690
|
$0.290
|
$0.700
|
$0.290
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
25,500.000
|
$0.750
|
$0.480
|
$0.500
|
$0.850
|
$0.530
|
$0.850
|
$0.530
|
$0.850
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
12,750.000
|
$0.750
|
$0.480
|
$0.500
|
$0.900
|
$0.530
|
$0.950
|
$0.530
|
$0.900
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
24,855.000
|
$1.000
|
$1.780
|
$1.300
|
$1.000
|
$0.440
|
$0.450
|
$0.830
|
$1.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
9,236.000
|
$1.000
|
$1.780
|
$1.300
|
$1.000
|
$0.440
|
$0.450
|
$0.830
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
522.000
|
$1.500
|
$1.000
|
$1.000
|
$2.100
|
$1.110
|
$2.200
|
$1.100
|
$2.150
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
20,090.000
|
$1.000
|
$0.700
|
$0.700
|
$0.850
|
$0.780
|
$0.900
|
$0.770
|
$0.850
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
46,470.000
|
$0.500
|
$0.340
|
$0.350
|
$0.400
|
$0.380
|
$0.450
|
$0.370
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
182,855.000
|
$0.500
|
$0.320
|
$0.350
|
$0.380
|
$0.360
|
$0.350
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
185,861.000
|
$0.500
|
$0.320
|
$0.350
|
$0.380
|
$0.360
|
$0.350
|
$0.350
|
$0.400
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
61.000
|
$200.000
|
$200.000
|
$204.000
|
$185.000
|
$223.000
|
$175.000
|
$220.000
|
$187.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
61.000
|
$300.000
|
$200.000
|
$204.000
|
$238.000
|
$223.000
|
$250.000
|
$220.000
|
$240.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
816.000
|
$30.000
|
$33.000
|
$34.000
|
$19.050
|
$36.700
|
$20.000
|
$36.300
|
$19.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,011.000
|
$3.000
|
$3.130
|
$3.200
|
$4.250
|
$3.480
|
$4.500
|
$3.440
|
$4.300
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
3,850.000
|
$3.000
|
$3.130
|
$3.200
|
$4.000
|
$3.480
|
$4.000
|
$3.440
|
$4.000
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
14,136.000
|
$70.000
|
$66.290
|
$67.000
|
$73.000
|
$87.000
|
$85.000
|
$95.440
|
$90.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
135,216.000
|
$75.000
|
$67.220
|
$72.000
|
$79.500
|
$84.000
|
$90.000
|
$95.500
|
$105.000
|
|
|
TACK COAT
|
GAL
|
64,845.000
|
$4.000
|
$2.850
|
$2.900
|
$2.700
|
$2.100
|
$3.000
|
$2.370
|
$3.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$7,617.940
|
$22,500.000
|
$10,000.000
|
$7,200.000
|
$25,000.000
|
$6,050.000
|
$24,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$200.000
|
$304.720
|
$170.000
|
$150.000
|
$218.000
|
$400.000
|
$550.000
|
$100.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
232.000
|
$55.000
|
$101.570
|
$23.000
|
$150.000
|
$160.000
|
$25.000
|
$110.000
|
$10.000
|
|
Totals: |
$17,136,769.000
|
$14,739,738.038
|
$15,620,188.990
|
$16,712,123.290
|
$17,744,621.580
|
$19,162,171.950
|
$19,203,677.056
|
$20,431,458.060
|