PREPARING ROW
|
AC
|
8.410
|
$5,000.000
|
$4,500.000
|
$43,000.000
|
$21,983.000
|
$75,000.000
|
$2,200.000
|
$15,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
8,435.000
|
$25.000
|
$28.000
|
$16.000
|
$8.040
|
$20.590
|
$21.800
|
$18.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
400.000
|
$10.000
|
$47.000
|
$100.000
|
$21.160
|
$34.720
|
$25.100
|
$72.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
2,738.000
|
$60.000
|
$10.800
|
$6.500
|
$9.230
|
$4.710
|
$21.600
|
$9.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
46,365.000
|
$25.000
|
$5.500
|
$17.000
|
$16.440
|
$15.540
|
$11.000
|
$9.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
35,964.000
|
$25.000
|
$5.200
|
$22.000
|
$27.610
|
$27.270
|
$24.000
|
$13.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
185.000
|
$55.000
|
$51.800
|
$225.000
|
$20.130
|
$5.720
|
$78.900
|
$31.000
|
|
|
ROLL SODDING
|
SY
|
2,296.000
|
$5.750
|
$12.320
|
$7.000
|
$11.620
|
$13.260
|
$12.550
|
$13.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
AC
|
1.000
|
$2,000.000
|
$1,484.000
|
$3,200.000
|
$2,650.000
|
$2,676.500
|
$1,510.000
|
$1,600.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
AC
|
8.000
|
$1,000.000
|
$1,484.000
|
$3,200.000
|
$2,650.000
|
$2,676.500
|
$1,510.000
|
$1,600.000
|
|
|
VEGETATIVE WATERING
|
MG
|
436.560
|
$35.000
|
$40.000
|
$50.000
|
$36.850
|
$22.730
|
$44.900
|
$35.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 3)(FNAL POS)
|
CY
|
6,790.000
|
$86.000
|
$61.000
|
$57.000
|
$50.450
|
$70.700
|
$65.600
|
$82.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
550.000
|
$400.000
|
$342.000
|
$0.010
|
$326.370
|
$294.920
|
$318.000
|
$386.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
40,728.000
|
$5.000
|
$5.200
|
$0.010
|
$3.550
|
$6.240
|
$11.900
|
$6.500
|
|
|
CM TRT(PT MX)(CL N)(TY D)(GR 3)(FN POS)
|
CY
|
755.000
|
$250.000
|
$0.010
|
$0.010
|
$92.760
|
$17.840
|
$222.000
|
$150.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
8,146.000
|
$5.500
|
$4.500
|
$4.500
|
$4.500
|
$4.550
|
$4.400
|
$4.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
40,728.000
|
$100.000
|
$107.500
|
$102.500
|
$100.500
|
$106.050
|
$122.190
|
$130.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
10.000
|
$637.500
|
$550.000
|
$615.000
|
$1,190.710
|
$656.500
|
$1,070.000
|
$1,600.000
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
28.000
|
$100.000
|
$100.000
|
$30.000
|
$50.000
|
$55.550
|
$141.000
|
$41.000
|
|
|
CLEAN AND PAINT EXIST STR (REF NO.1)
|
LS
|
1.000
|
$10,000.000
|
$7,500.000
|
$8,000.000
|
$7,254.000
|
$7,326.540
|
$7,600.000
|
$23,000.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
802.000
|
$160.000
|
$150.000
|
$73.500
|
$131.400
|
$74.350
|
$183.000
|
$190.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,096,132.330
|
$1,200,000.000
|
$1,000,000.000
|
$1,280,061.350
|
$1,291,000.000
|
$1,300,000.000
|
$1,052,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$5,000.000
|
$1,200.000
|
$3,800.000
|
$60,000.000
|
$505.000
|
$3,240.000
|
$6,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
256.000
|
$75.000
|
$106.530
|
$81.000
|
$85.000
|
$85.850
|
$91.300
|
$119.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
256.000
|
$15.000
|
$37.100
|
$29.000
|
$27.500
|
$27.780
|
$29.550
|
$41.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
673.000
|
$35.000
|
$60.580
|
$20.000
|
$17.500
|
$17.680
|
$18.800
|
$68.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
673.000
|
$10.000
|
$19.080
|
$11.500
|
$11.500
|
$11.620
|
$12.350
|
$21.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
2,000.000
|
$8.000
|
$3.980
|
$4.000
|
$6.000
|
$12.120
|
$4.300
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,297.000
|
$4.250
|
$4.240
|
$3.600
|
$3.550
|
$3.590
|
$3.800
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,297.000
|
$1.000
|
$0.800
|
$1.150
|
$0.550
|
$0.560
|
$0.600
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,170.000
|
$6.000
|
$4.240
|
$6.000
|
$6.500
|
$6.570
|
$7.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,170.000
|
$2.000
|
$0.800
|
$2.300
|
$1.000
|
$1.010
|
$1.050
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,465.000
|
$120.000
|
$122.000
|
$135.000
|
$131.750
|
$102.010
|
$135.000
|
$160.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
432.000
|
$20.000
|
$138.000
|
$170.000
|
$8.970
|
$47.980
|
$142.000
|
$41.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
600.000
|
$15.000
|
$10.900
|
$15.000
|
$14.120
|
$20.200
|
$28.050
|
$17.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$20.000
|
$50.300
|
$80.000
|
$17.780
|
$20.200
|
$42.500
|
$28.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
600.000
|
$15.000
|
$9.500
|
$17.000
|
$14.120
|
$20.200
|
$28.050
|
$15.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$20.000
|
$47.600
|
$28.000
|
$17.780
|
$20.200
|
$42.500
|
$29.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
3,524.000
|
$15.000
|
$11.000
|
$13.200
|
$22.240
|
$32.320
|
$19.300
|
$18.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
342.000
|
$48.000
|
$44.000
|
$38.000
|
$38.510
|
$36.360
|
$76.300
|
$66.000
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
115.000
|
$50.000
|
$58.000
|
$79.000
|
$51.480
|
$75.750
|
$92.000
|
$61.000
|
|
|
CONC CURB & GUTTER TY II (MOD)
|
LF
|
3,630.000
|
$50.000
|
$42.000
|
$38.000
|
$46.700
|
$36.360
|
$80.110
|
$77.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
1,388.000
|
$100.000
|
$75.000
|
$98.000
|
$65.050
|
$83.330
|
$99.000
|
$105.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$2,900.000
|
$2,500.000
|
$3,000.000
|
$2,746.540
|
$3,030.000
|
$2,510.000
|
$2,400.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
4.000
|
$3,100.000
|
$2,500.000
|
$3,000.000
|
$2,743.220
|
$3,535.000
|
$4,360.000
|
$2,200.000
|
|
|
CONC DIRECTIONAL ISLAND
|
LF
|
1,406.000
|
$45.000
|
$46.000
|
$87.000
|
$121.960
|
$90.900
|
$102.000
|
$66.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$28,000.000
|
$30,000.000
|
$31,000.000
|
$24,506.750
|
$24,751.820
|
$34,400.000
|
$40,000.000
|
|
|
CHAIN LINK FENCE (INSTALL)
|
SF
|
1,685.000
|
$7.000
|
$15.000
|
$9.300
|
$15.000
|
$12.120
|
$35.700
|
$36.000
|
|
|
GATE (SPECIAL)
|
EA
|
2.000
|
$5,000.000
|
$3,500.000
|
$1,400.000
|
$3,500.000
|
$1,010.000
|
$1,180.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$820.000
|
$1,144.800
|
$1,150.000
|
$1,125.000
|
$772.650
|
$930.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,100.000
|
$1,459.620
|
$1,500.000
|
$1,250.000
|
$868.600
|
$1,100.000
|
$1,600.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
2.000
|
$1,875.000
|
$2,326.440
|
$2,300.000
|
$1,600.000
|
$2,065.450
|
$2,050.000
|
$2,600.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
8.000
|
$550.000
|
$706.440
|
$710.000
|
$750.000
|
$540.350
|
$430.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
22.000
|
$145.000
|
$100.700
|
$100.000
|
$100.000
|
$116.150
|
$85.900
|
$113.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
495.000
|
$0.500
|
$1.120
|
$2.700
|
$2.500
|
$2.530
|
$5.850
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
495.000
|
$0.500
|
$1.150
|
$2.700
|
$2.500
|
$2.530
|
$5.850
|
$2.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
13,688.000
|
$0.850
|
$1.400
|
$0.750
|
$0.700
|
$0.710
|
$0.900
|
$2.000
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
234.000
|
$1.000
|
$1.850
|
$1.700
|
$1.600
|
$1.620
|
$2.650
|
$10.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,500.000
|
$0.600
|
$0.780
|
$0.750
|
$0.700
|
$0.710
|
$0.900
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
13,688.000
|
$2.500
|
$0.830
|
$2.700
|
$2.500
|
$2.530
|
$1.450
|
$6.000
|
|
REFL PAV MRK TY II (R&W)6"(FIRE LANE)
|
LF
|
3,000.000
|
$4.000
|
$5.000
|
$1.100
|
$1.060
|
$1.070
|
$1.450
|
$4.000
|
|
|
REFL PAV MRK TY II(RED)(SYMBOL)(100MIL)
|
EA
|
96.000
|
$100.000
|
$138.000
|
$26.000
|
$25.000
|
$25.250
|
$5.850
|
$13.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)1X
|
LF
|
234.000
|
$5.000
|
$3.000
|
$7.350
|
$7.000
|
$7.070
|
$7.050
|
$23.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$400.000
|
$380.000
|
$290.000
|
$275.000
|
$277.750
|
$350.000
|
$571.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
12.000
|
$400.000
|
$235.000
|
$395.000
|
$374.000
|
$377.740
|
$530.000
|
$618.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$375.000
|
$285.000
|
$550.000
|
$520.000
|
$525.200
|
$530.000
|
$648.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
12.000
|
$65.000
|
$60.000
|
$55.000
|
$52.000
|
$52.520
|
$88.000
|
$238.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,974.000
|
$1.000
|
$0.600
|
$1.150
|
$1.060
|
$1.070
|
$0.850
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
4.000
|
$125.000
|
$55.000
|
$56.000
|
$52.000
|
$52.520
|
$75.800
|
$160.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
6.000
|
$115.000
|
$65.000
|
$56.000
|
$52.000
|
$52.520
|
$89.600
|
$178.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
10,878.000
|
$0.200
|
$0.360
|
$0.570
|
$0.520
|
$0.530
|
$0.500
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
96.000
|
$50.000
|
$1.250
|
$6.000
|
$5.200
|
$5.250
|
$1.700
|
$1.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
1,000.000
|
$25.000
|
$25.860
|
$26.000
|
$24.400
|
$35.350
|
$22.550
|
$29.000
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
4,481.000
|
$150.000
|
$170.000
|
$117.000
|
$110.000
|
$111.100
|
$113.000
|
$127.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$12,000.000
|
$20,000.000
|
$10,000.000
|
$17,291.230
|
$8,080.000
|
$11,900.000
|
$20,000.000
|
|
|
MEP AND WASTEWATER SYSTEM UPGRADE
|
EA
|
1.000
|
$1,275,000.000
|
$2,741,000.000
|
$2,831,000.000
|
$2,157,000.000
|
$2,768,410.000
|
$2,327,837.280
|
$2,600,000.000
|
|
Totals: |
$12,215,675.580
|
$12,103,561.020
|
$12,505,548.740
|
$12,859,999.996
|
$13,630,201.329
|
$13,798,155.694
|
$13,850,107.900
|