PREPARING ROW
|
STA
|
18.960
|
$1,800.000
|
$15,000.000
|
$7,500.000
|
$6,200.000
|
$7,500.000
|
$6,350.000
|
$3,000.000
|
$2,500.000
|
$4,000.000
|
$10,800.000
|
$18,750.000
|
|
|
PREPARING ROW (TREE) (36" TO 48" DIA)
|
EA
|
4.000
|
$2,000.000
|
$2,500.000
|
$1,500.000
|
$2,000.000
|
$7,500.000
|
$2,100.000
|
$1,000.000
|
$2,000.000
|
$2,000.000
|
$2,800.000
|
$2,500.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
214.000
|
$5.000
|
$7.000
|
$6.000
|
$7.000
|
$15.000
|
$4.600
|
$12.680
|
$25.000
|
$20.000
|
$12.000
|
$8.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12.5")
|
SY
|
3,842.000
|
$7.000
|
$6.000
|
$10.000
|
$7.000
|
$15.000
|
$5.000
|
$6.860
|
$10.000
|
$8.000
|
$6.000
|
$8.000
|
|
|
REMOVE STAB BS & ASPH PAV (7.5"-15.5")
|
SY
|
837.000
|
$8.000
|
$6.000
|
$10.000
|
$7.000
|
$15.000
|
$5.000
|
$10.380
|
$9.000
|
$10.000
|
$8.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,915.000
|
$10.000
|
$10.000
|
$15.000
|
$17.000
|
$13.000
|
$15.000
|
$10.370
|
$12.000
|
$15.000
|
$16.000
|
$9.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
4,743.000
|
$10.000
|
$11.000
|
$10.000
|
$17.000
|
$14.000
|
$8.000
|
$12.580
|
$17.500
|
$20.000
|
$13.000
|
$14.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
11,377.000
|
$1.500
|
$1.300
|
$3.000
|
$1.000
|
$2.250
|
$2.500
|
$1.750
|
$4.500
|
$4.000
|
$4.000
|
$1.500
|
|
|
BLOCK SODDING
|
SY
|
1,000.000
|
$3.000
|
$4.800
|
$4.670
|
$4.600
|
$4.550
|
$4.750
|
$5.000
|
$5.600
|
$4.000
|
$4.600
|
$6.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
11,377.000
|
$0.750
|
$0.170
|
$0.160
|
$0.160
|
$0.160
|
$0.170
|
$0.170
|
$0.270
|
$1.000
|
$0.200
|
$0.160
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
7,259.000
|
$0.750
|
$0.130
|
$0.120
|
$0.120
|
$0.120
|
$0.140
|
$0.120
|
$0.250
|
$0.400
|
$0.500
|
$0.120
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
7,259.000
|
$0.750
|
$0.130
|
$0.120
|
$0.120
|
$0.120
|
$0.140
|
$0.120
|
$0.250
|
$0.400
|
$0.500
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
209.900
|
$40.000
|
$19.000
|
$14.000
|
$24.000
|
$25.000
|
$25.000
|
$25.000
|
$70.000
|
$1.000
|
$38.000
|
$20.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
6,129.000
|
$2.000
|
$2.300
|
$1.870
|
$1.000
|
$1.820
|
$1.900
|
$2.000
|
$1.480
|
$4.000
|
$1.900
|
$1.820
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
|
CY
|
1,276.000
|
$40.000
|
$60.000
|
$42.000
|
$48.000
|
$55.000
|
$62.000
|
$55.000
|
$39.000
|
$50.000
|
$58.000
|
$45.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
730.000
|
$7.000
|
$4.500
|
$4.200
|
$8.500
|
$4.000
|
$5.750
|
$10.000
|
$5.860
|
$6.000
|
$4.000
|
$5.500
|
|
|
ASPH (CRS-2)
|
GAL
|
2,571.000
|
$7.500
|
$3.500
|
$3.500
|
$4.500
|
$3.150
|
$3.700
|
$3.500
|
$12.950
|
$6.000
|
$3.200
|
$5.500
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
46.000
|
$250.000
|
$400.000
|
$400.000
|
$360.000
|
$390.000
|
$685.000
|
$250.000
|
$763.000
|
$800.000
|
$390.000
|
$725.000
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
334.000
|
$100.000
|
$119.000
|
$115.000
|
$115.000
|
$125.000
|
$116.000
|
$125.000
|
$115.000
|
$120.000
|
$103.000
|
$110.000
|
|
|
D-GR HMA TY B SAC-B PG (64-22)
|
TON
|
92.000
|
$90.000
|
$153.000
|
$150.000
|
$105.000
|
$175.000
|
$162.000
|
$165.000
|
$163.000
|
$160.000
|
$133.000
|
$155.000
|
|
|
CEM STABIL BKFL
|
CY
|
281.000
|
$160.000
|
$100.000
|
$120.000
|
$130.000
|
$125.000
|
$120.000
|
$175.000
|
$190.000
|
$250.000
|
$200.000
|
$105.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,471.000
|
$25.000
|
$12.000
|
$15.000
|
$23.000
|
$30.000
|
$30.000
|
$45.000
|
$35.000
|
$20.000
|
$25.000
|
$20.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
84.000
|
$100.000
|
$115.000
|
$180.000
|
$110.000
|
$100.000
|
$104.000
|
$130.000
|
$175.000
|
$80.000
|
$140.000
|
$105.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
697.000
|
$205.000
|
$215.000
|
$250.000
|
$205.000
|
$175.000
|
$213.000
|
$210.000
|
$195.000
|
$180.000
|
$293.000
|
$215.000
|
|
|
CL C CONC (ABUT)
|
CY
|
68.900
|
$1,000.000
|
$1,100.000
|
$800.000
|
$850.000
|
$900.000
|
$580.000
|
$700.000
|
$900.000
|
$900.000
|
$950.000
|
$850.000
|
|
|
CL C CONC (BENT)
|
CY
|
153.200
|
$1,200.000
|
$1,100.000
|
$900.000
|
$850.000
|
$1,000.000
|
$880.000
|
$1,100.000
|
$950.000
|
$900.000
|
$920.000
|
$1,200.000
|
|
|
REINF CONC SLAB
|
SF
|
30,960.000
|
$18.000
|
$15.000
|
$13.000
|
$16.000
|
$14.000
|
$13.500
|
$17.000
|
$15.750
|
$18.000
|
$18.300
|
$16.450
|
|
|
APPROACH SLAB
|
CY
|
93.500
|
$450.000
|
$350.000
|
$400.000
|
$480.000
|
$525.000
|
$390.000
|
$475.000
|
$395.000
|
$600.000
|
$480.000
|
$375.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
3,582.900
|
$160.000
|
$136.000
|
$155.000
|
$138.000
|
$125.000
|
$143.000
|
$162.000
|
$147.000
|
$170.000
|
$148.000
|
$150.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,312.000
|
$115.000
|
$95.000
|
$70.000
|
$90.000
|
$125.000
|
$93.500
|
$92.000
|
$121.000
|
$110.000
|
$85.000
|
$100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
30.000
|
$460.000
|
$650.000
|
$500.000
|
$440.000
|
$575.000
|
$555.000
|
$575.000
|
$550.000
|
$500.000
|
$620.000
|
$465.000
|
|
|
RAIL (TY T66)
|
LF
|
1,496.100
|
$215.000
|
$110.000
|
$115.000
|
$100.000
|
$110.000
|
$182.000
|
$110.000
|
$138.000
|
$100.000
|
$150.000
|
$72.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
131.000
|
$100.000
|
$105.000
|
$90.000
|
$90.000
|
$95.000
|
$83.000
|
$87.000
|
$85.000
|
$80.000
|
$95.000
|
$85.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
81.000
|
$275.000
|
$250.000
|
$200.000
|
$270.000
|
$300.000
|
$302.000
|
$280.000
|
$283.000
|
$400.000
|
$420.000
|
$370.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
60.000
|
$60.000
|
$80.000
|
$70.000
|
$90.000
|
$85.000
|
$70.000
|
$66.000
|
$58.000
|
$60.000
|
$85.000
|
$72.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
60.000
|
$75.000
|
$95.000
|
$80.000
|
$100.000
|
$95.000
|
$85.000
|
$77.000
|
$66.000
|
$100.000
|
$100.000
|
$87.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$8,000.000
|
$5,250.000
|
$6,500.000
|
$5,000.000
|
$7,500.000
|
$5,200.000
|
$8,200.000
|
$6,200.000
|
$6,000.000
|
$9,300.000
|
$6,700.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
1.000
|
$7,000.000
|
$5,100.000
|
$10,000.000
|
$8,500.000
|
$6,500.000
|
$8,500.000
|
$9,900.000
|
$8,000.000
|
$6,000.000
|
$8,500.000
|
$3,850.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$800.000
|
$1,100.000
|
$700.000
|
$1,500.000
|
$1,200.000
|
$1,260.000
|
$1,000.000
|
$955.000
|
$2,000.000
|
$1,150.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,100.000
|
$1,250.000
|
$800.000
|
$1,800.000
|
$1,500.000
|
$1,750.000
|
$1,150.000
|
$1,100.000
|
$2,500.000
|
$1,450.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
177.000
|
$15.000
|
$15.000
|
$14.000
|
$14.000
|
$25.000
|
$20.000
|
$18.000
|
$15.000
|
$5.000
|
$40.000
|
$17.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$20,000.000
|
$50,000.000
|
$50,000.000
|
$40,000.000
|
$50,000.000
|
$55,000.000
|
$50,000.000
|
$60,000.000
|
$24,800.000
|
$32,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$260,000.000
|
$100,000.000
|
$267,000.000
|
$310,000.000
|
$300,000.000
|
$285,000.000
|
$320,000.000
|
$328,000.000
|
$310,000.000
|
$300,000.000
|
$355,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$3,000.000
|
$1,700.000
|
$2,000.000
|
$2,000.000
|
$4,200.000
|
$2,000.000
|
$2,000.000
|
$3,500.000
|
$6,000.000
|
$895.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
138.000
|
$40.000
|
$33.000
|
$30.000
|
$27.000
|
$26.200
|
$27.000
|
$30.000
|
$27.750
|
$40.000
|
$42.000
|
$26.200
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
224.000
|
$50.000
|
$44.000
|
$40.000
|
$35.000
|
$35.100
|
$36.000
|
$40.000
|
$51.500
|
$40.000
|
$72.000
|
$35.100
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
362.000
|
$10.000
|
$9.000
|
$8.000
|
$7.000
|
$7.000
|
$7.000
|
$7.000
|
$11.700
|
$20.000
|
$10.000
|
$7.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
546.000
|
$15.000
|
$15.000
|
$14.000
|
$10.000
|
$13.500
|
$15.000
|
$15.000
|
$24.350
|
$5.000
|
$16.000
|
$13.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
546.000
|
$8.000
|
$8.000
|
$6.000
|
$4.000
|
$6.000
|
$6.000
|
$6.000
|
$8.300
|
$1.000
|
$5.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,777.000
|
$3.000
|
$4.000
|
$2.500
|
$2.400
|
$2.250
|
$3.000
|
$4.500
|
$3.000
|
$3.000
|
$3.800
|
$2.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,777.000
|
$1.000
|
$0.500
|
$0.300
|
$0.250
|
$0.250
|
$0.250
|
$0.250
|
$0.760
|
$1.000
|
$1.600
|
$0.250
|
|
|
CONSTRUCTING DETOURS
|
SY
|
912.000
|
$50.000
|
$80.000
|
$70.000
|
$110.000
|
$90.000
|
$88.000
|
$95.000
|
$90.000
|
$124.000
|
$145.000
|
$70.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
8.000
|
$6,000.000
|
$4,000.000
|
$1,550.000
|
$3,600.000
|
$0.010
|
$5,000.000
|
$5,900.000
|
$6,500.000
|
$5,000.000
|
$3,000.000
|
$2,500.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
240.000
|
$10.000
|
$25.000
|
$15.000
|
$33.000
|
$25.000
|
$40.000
|
$30.000
|
$20.000
|
$40.000
|
$12.000
|
$12.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
240.000
|
$7.000
|
$23.000
|
$10.000
|
$33.000
|
$25.000
|
$40.000
|
$30.000
|
$20.000
|
$40.000
|
$11.000
|
$12.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
496.000
|
$40.000
|
$49.000
|
$40.000
|
$47.000
|
$40.000
|
$40.000
|
$60.000
|
$50.000
|
$40.000
|
$41.000
|
$37.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
375.000
|
$22.000
|
$20.000
|
$19.360
|
$19.000
|
$20.000
|
$20.000
|
$21.000
|
$21.380
|
$24.000
|
$20.000
|
$20.210
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,650.000
|
$1,500.000
|
$1,464.620
|
$1,800.000
|
$1,428.000
|
$1,500.000
|
$2,200.000
|
$1,485.000
|
$1,800.000
|
$1,430.000
|
$1,400.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,150.000
|
$2,500.000
|
$2,415.390
|
$2,500.000
|
$2,355.000
|
$2,500.000
|
$2,600.000
|
$2,410.000
|
$2,400.000
|
$2,355.000
|
$2,280.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$2,000.000
|
$750.000
|
$512.820
|
$520.000
|
$500.000
|
$550.000
|
$750.000
|
$975.000
|
$2,000.000
|
$630.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
|
EA
|
2.000
|
$5,000.000
|
$12,000.000
|
$9,128.210
|
$9,200.000
|
$6,000.000
|
$9,250.000
|
$8,500.000
|
$7,380.000
|
$10,000.000
|
$11,000.000
|
$7,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
2,058.000
|
$12.000
|
$11.000
|
$4.000
|
$5.000
|
$10.000
|
$7.000
|
$12.000
|
$12.000
|
$10.000
|
$12.000
|
$12.000
|
|
|
GATE (TY 1)
|
EA
|
3.000
|
$1,000.000
|
$650.000
|
$850.000
|
$500.000
|
$550.000
|
$950.000
|
$560.000
|
$750.000
|
$1,000.000
|
$480.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$470.000
|
$600.000
|
$475.600
|
$430.000
|
$463.710
|
$475.000
|
$519.000
|
$477.000
|
$500.000
|
$425.000
|
$463.710
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
10.000
|
$350.000
|
$370.000
|
$343.590
|
$350.000
|
$335.000
|
$350.000
|
$375.000
|
$374.000
|
$500.000
|
$350.000
|
$335.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
5.000
|
$2,600.000
|
$2,700.000
|
$2,438.670
|
$1,800.000
|
$2,377.000
|
$2,450.000
|
$2,665.000
|
$1,775.000
|
$500.000
|
$1,780.000
|
$2,377.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$430.000
|
$400.000
|
$278.580
|
$320.000
|
$271.670
|
$290.000
|
$300.000
|
$376.000
|
$400.000
|
$300.000
|
$271.670
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
25.000
|
$100.000
|
$85.000
|
$76.920
|
$100.000
|
$75.000
|
$80.000
|
$80.000
|
$100.000
|
$100.000
|
$40.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
16.000
|
$23.000
|
$15.000
|
$10.260
|
$20.000
|
$10.000
|
$11.000
|
$11.000
|
$28.000
|
$40.000
|
$10.000
|
$23.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$35.000
|
$20.000
|
$14.100
|
$25.000
|
$13.750
|
$14.000
|
$15.000
|
$44.000
|
$40.000
|
$14.000
|
$33.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,712.000
|
$0.300
|
$0.700
|
$0.550
|
$0.580
|
$0.550
|
$0.600
|
$0.620
|
$0.600
|
$0.600
|
$0.800
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
48.000
|
$4.250
|
$15.000
|
$10.000
|
$10.000
|
$10.000
|
$10.500
|
$11.200
|
$11.780
|
$10.000
|
$9.500
|
$9.450
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,671.000
|
$0.500
|
$0.900
|
$0.670
|
$0.700
|
$0.670
|
$0.700
|
$0.750
|
$0.720
|
$0.800
|
$0.900
|
$0.850
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
22.000
|
$6.000
|
$10.000
|
$6.000
|
$6.200
|
$6.000
|
$6.500
|
$6.720
|
$9.000
|
$10.000
|
$15.000
|
$14.950
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,920.000
|
$0.500
|
$0.900
|
$0.670
|
$0.700
|
$0.670
|
$0.700
|
$0.750
|
$0.740
|
$0.800
|
$0.900
|
$0.850
|
|
|
PAVEMENT SEALER 4"
|
LF
|
3,108.000
|
$0.300
|
$0.200
|
$0.150
|
$0.150
|
$0.150
|
$0.160
|
$0.170
|
$0.180
|
$0.200
|
$0.300
|
$0.250
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
4,393.000
|
$1.000
|
$0.450
|
$0.440
|
$0.450
|
$0.440
|
$0.460
|
$0.490
|
$0.480
|
$0.600
|
$0.600
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
381.000
|
$1.000
|
$0.550
|
$0.500
|
$0.520
|
$0.500
|
$0.650
|
$0.560
|
$0.690
|
$0.600
|
$0.600
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
4,793.000
|
$1.000
|
$0.450
|
$0.440
|
$0.450
|
$0.440
|
$0.460
|
$0.490
|
$0.470
|
$0.600
|
$0.600
|
$0.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
81.000
|
$9.000
|
$8.100
|
$8.000
|
$8.000
|
$8.000
|
$8.500
|
$8.960
|
$9.160
|
$10.000
|
$6.800
|
$6.750
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,957.000
|
$0.500
|
$0.600
|
$0.570
|
$0.600
|
$0.570
|
$0.600
|
$0.640
|
$0.610
|
$0.600
|
$0.900
|
$0.850
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,500.000
|
$6,000.000
|
$6,025.000
|
$8,000.000
|
$4,000.000
|
$7,000.000
|
$15,000.000
|
$8,000.000
|
$15,000.000
|
$16,000.000
|
$10,000.000
|
|
Totals: |
$3,317,843.750
|
$2,950,399.180
|
$2,954,520.900
|
$3,095,632.110
|
$3,098,671.430
|
$3,129,646.550
|
$3,282,495.470
|
$3,328,626.850
|
$3,518,981.100
|
$3,536,966.100
|
$3,592,756.050
|