PREPARING ROW
|
STA
|
20.160
|
$4,300.000
|
$24,000.000
|
$4,200.000
|
$4,900.470
|
$10,000.000
|
$36,710.000
|
$29,300.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
5,319.000
|
$16.000
|
$5.890
|
$10.450
|
$6.900
|
$15.000
|
$11.150
|
$16.000
|
|
|
REMOVING UNTREATED BASE (8")
|
SY
|
175.000
|
$10.000
|
$20.200
|
$29.050
|
$23.000
|
$17.000
|
$8.740
|
$9.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
329.000
|
$20.000
|
$19.190
|
$57.100
|
$21.930
|
$17.000
|
$55.000
|
$50.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
500.000
|
$38.000
|
$19.190
|
$50.200
|
$49.550
|
$20.000
|
$65.000
|
$50.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C1)
|
CY
|
1,333.000
|
$50.000
|
$26.260
|
$22.600
|
$54.490
|
$30.000
|
$100.000
|
$40.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DS)
|
CY
|
330.000
|
$65.000
|
$26.260
|
$270.000
|
$74.750
|
$35.000
|
$150.000
|
$100.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
3,588.000
|
$2.500
|
$2.020
|
$5.650
|
$5.730
|
$10.000
|
$2.220
|
$1.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
3,588.000
|
$1.250
|
$0.180
|
$1.600
|
$1.730
|
$1.300
|
$1.090
|
$0.400
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
1,795.000
|
$1.000
|
$0.180
|
$2.100
|
$2.240
|
$2.800
|
$1.040
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
87.000
|
$50.000
|
$40.400
|
$50.200
|
$17.250
|
$100.000
|
$45.690
|
$44.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
300.000
|
$3.000
|
$1.520
|
$4.850
|
$5.180
|
$24.000
|
$3.950
|
$2.000
|
|
|
FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS)
|
CY
|
2,042.000
|
$120.000
|
$104.740
|
$86.600
|
$115.000
|
$105.000
|
$85.400
|
$90.000
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
1,306.000
|
$5.000
|
$3.540
|
$6.900
|
$7.480
|
$7.500
|
$6.500
|
$29.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
2,285.000
|
$7.000
|
$7.070
|
$4.750
|
$5.180
|
$5.200
|
$4.500
|
$10.000
|
|
|
AGGR(TY-D GR-4 OR TY-L GR-4)
|
CY
|
49.000
|
$185.000
|
$121.200
|
$540.000
|
$585.350
|
$585.000
|
$509.000
|
$900.000
|
|
|
STRUCT EXCAV
|
CY
|
41.000
|
$62.000
|
$8.840
|
$60.800
|
$66.530
|
$145.000
|
$45.420
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
792.000
|
$280.000
|
$161.600
|
$308.000
|
$201.250
|
$75.000
|
$188.650
|
$225.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,805.000
|
$37.000
|
$33.550
|
$23.750
|
$23.000
|
$60.000
|
$19.220
|
$40.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
1,095.000
|
$250.000
|
$205.940
|
$202.000
|
$172.500
|
$350.000
|
$152.520
|
$220.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,005.000
|
$385.000
|
$236.240
|
$244.000
|
$207.000
|
$410.000
|
$195.570
|
$250.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
75.100
|
$1,650.000
|
$1,278.450
|
$1,660.000
|
$1,475.620
|
$3,100.000
|
$1,306.040
|
$2,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
64.000
|
$2,000.000
|
$2,006.130
|
$2,430.000
|
$1,590.620
|
$2,800.000
|
$1,537.790
|
$2,900.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
29.600
|
$2,050.000
|
$1,715.000
|
$3,710.000
|
$1,840.000
|
$3,700.000
|
$2,893.990
|
$3,000.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
13,751.000
|
$25.000
|
$25.950
|
$22.750
|
$27.030
|
$22.000
|
$33.000
|
$28.000
|
|
|
APPROACH SLAB
|
CY
|
229.100
|
$750.000
|
$654.520
|
$780.000
|
$768.150
|
$1,100.000
|
$658.800
|
$900.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
3,921.000
|
$115.000
|
$71.210
|
$100.000
|
$115.000
|
$108.000
|
$90.000
|
$144.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
590.940
|
$240.000
|
$252.050
|
$200.000
|
$194.570
|
$220.000
|
$300.000
|
$270.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
1,181.880
|
$250.000
|
$252.050
|
$215.000
|
$206.390
|
$220.000
|
$300.000
|
$290.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
370.440
|
$260.000
|
$252.050
|
$194.000
|
$194.210
|
$220.000
|
$300.000
|
$300.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
740.880
|
$270.000
|
$252.050
|
$218.000
|
$210.850
|
$220.000
|
$300.000
|
$330.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
4.000
|
$875.000
|
$874.660
|
$1,260.000
|
$690.000
|
$1,300.000
|
$1,189.900
|
$800.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
61.000
|
$280.000
|
$75.190
|
$214.000
|
$212.750
|
$200.000
|
$176.000
|
$250.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
4,432.000
|
$200.000
|
$68.410
|
$103.000
|
$224.250
|
$220.000
|
$166.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
74.000
|
$650.000
|
$521.160
|
$1,030.000
|
$805.000
|
$850.000
|
$851.310
|
$700.000
|
|
|
RAIL (TY T223)
|
LF
|
1,265.800
|
$160.000
|
$143.710
|
$167.000
|
$149.500
|
$215.000
|
$100.510
|
$170.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
238.000
|
$165.000
|
$101.000
|
$145.000
|
$172.500
|
$67.000
|
$90.200
|
$120.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
260.000
|
$90.000
|
$84.360
|
$83.300
|
$62.100
|
$85.000
|
$88.920
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
452.000
|
$103.000
|
$93.800
|
$96.800
|
$86.250
|
$90.000
|
$118.020
|
$120.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,500.000
|
$1,454.400
|
$2,760.000
|
$1,568.600
|
$1,800.000
|
$2,598.040
|
$2,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$1,656.400
|
$2,660.000
|
$1,087.900
|
$1,500.000
|
$2,156.290
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$2,161.400
|
$3,180.000
|
$2,176.950
|
$2,150.000
|
$2,591.580
|
$3,000.000
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$750.000
|
$707.000
|
$580.000
|
$796.000
|
$850.000
|
$460.000
|
$1,150.000
|
|
|
REMOV STR (PIPE)
|
LF
|
254.000
|
$30.000
|
$23.560
|
$24.550
|
$21.090
|
$45.000
|
$16.000
|
$24.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$33,000.000
|
$30,300.000
|
$25,100.000
|
$37,163.980
|
$21,000.000
|
$200,000.000
|
$50,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$50,500.000
|
$30,500.000
|
$48,300.000
|
$81,000.000
|
$400,000.000
|
$75,100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$577,999.000
|
$510,000.000
|
$464,000.000
|
$545,000.000
|
$500,000.000
|
$629,576.970
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$7,500.000
|
$4,040.000
|
$1,320.000
|
$3,703.400
|
$8,000.000
|
$5,386.040
|
$13,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
443.000
|
$38.000
|
$28.280
|
$24.300
|
$25.880
|
$50.000
|
$26.900
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
443.000
|
$12.000
|
$8.840
|
$18.900
|
$20.130
|
$30.000
|
$15.000
|
$22.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,084.000
|
$6.000
|
$5.520
|
$3.850
|
$4.080
|
$4.500
|
$4.500
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,084.000
|
$1.700
|
$1.770
|
$0.600
|
$0.630
|
$1.000
|
$1.000
|
$3.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
135.000
|
$50.000
|
$70.700
|
$87.500
|
$41.400
|
$42.000
|
$97.310
|
$110.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
140.000
|
$60.000
|
$58.910
|
$126.000
|
$40.250
|
$40.000
|
$107.440
|
$110.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
3,102.000
|
$0.300
|
$1.010
|
$1.250
|
$1.440
|
$2.400
|
$0.480
|
$1.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
1,551.000
|
$0.400
|
$0.100
|
$1.650
|
$1.610
|
$3.200
|
$0.650
|
$1.300
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
487.500
|
$35.000
|
$34.090
|
$37.200
|
$32.780
|
$29.000
|
$30.500
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,700.000
|
$2,474.640
|
$2,470.000
|
$2,530.000
|
$2,200.000
|
$2,200.000
|
$1,900.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,500.000
|
$1,222.860
|
$1,540.000
|
$1,380.000
|
$1,400.000
|
$1,200.000
|
$1,100.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,350.000
|
$3,266.050
|
$3,460.000
|
$3,306.250
|
$3,150.000
|
$3,000.000
|
$3,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
265.000
|
$29.000
|
$50.500
|
$17.350
|
$23.000
|
$50.000
|
$30.000
|
$21.000
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
45.000
|
$80.000
|
$161.600
|
$65.400
|
$111.550
|
$280.000
|
$21.000
|
$52.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
120.000
|
$50.000
|
$40.400
|
$53.900
|
$51.600
|
$100.000
|
$35.060
|
$30.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$400.000
|
$303.000
|
$1,100.000
|
$172.500
|
$300.000
|
$305.000
|
$300.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
2.000
|
$365.000
|
$355.520
|
$1,130.000
|
$172.500
|
$350.000
|
$345.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$800.000
|
$707.000
|
$1,970.000
|
$862.500
|
$650.000
|
$665.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$115.000
|
$101.000
|
$520.000
|
$127.220
|
$100.000
|
$125.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
14.000
|
$40.000
|
$11.980
|
$20.200
|
$23.000
|
$19.000
|
$38.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
17.000
|
$49.000
|
$44.060
|
$65.300
|
$4.830
|
$60.000
|
$40.000
|
$34.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
4.000
|
$110.000
|
$92.620
|
$116.000
|
$69.000
|
$108.000
|
$85.000
|
$135.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
17.000
|
$13.000
|
$13.130
|
$5.750
|
$6.150
|
$8.000
|
$5.350
|
$20.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
4,080.000
|
$1.100
|
$1.010
|
$2.400
|
$2.590
|
$3.300
|
$2.250
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
360.000
|
$1.000
|
$1.010
|
$2.700
|
$2.880
|
$3.600
|
$2.500
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,186.000
|
$1.000
|
$1.010
|
$2.400
|
$2.590
|
$3.300
|
$2.250
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
33.000
|
$11.000
|
$10.100
|
$7.550
|
$8.050
|
$10.000
|
$7.000
|
$10.000
|
|
|
TACK COAT
|
GAL
|
653.000
|
$4.500
|
$6.060
|
$3.250
|
$3.510
|
$3.500
|
$3.050
|
$10.000
|
|
|
SP MIXES SP-C SAC-B PG70-22 (EXEMPT)
|
TON
|
1,428.000
|
$175.000
|
$196.950
|
$175.000
|
$189.750
|
$190.000
|
$165.000
|
$325.000
|
|
|
REMOVE AND RE-LAY EXISTING STONE RIPRAP
|
CY
|
50.000
|
$125.000
|
$10.100
|
$115.000
|
$115.000
|
$200.000
|
$169.520
|
$100.000
|
|
|
GEOGRID REINFORCE EMBANKMENTS (TY B)
|
SY
|
300.000
|
$55.000
|
$14.140
|
$18.200
|
$16.100
|
$10.000
|
$2.670
|
$15.000
|
|
|
LEAD CONTAINING COATING MANAGEMENT
|
SF
|
360.000
|
$105.000
|
$101.000
|
$15.700
|
$287.500
|
$40.000
|
$39.750
|
$100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$11,000.000
|
$10,100.000
|
$7,500.000
|
$9,775.000
|
$20,000.000
|
$6,030.720
|
$40,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
36.000
|
$50.000
|
$60.600
|
$79.900
|
$34.500
|
$125.000
|
$190.520
|
$250.000
|
|
Totals: |
$6,260,469.400
|
$5,183,802.027
|
$5,185,345.500
|
$5,778,238.702
|
$6,627,075.000
|
$6,999,998.996
|
$7,997,681.900
|