PREPARING ROW
|
STA
|
15.150
|
$2,000.000
|
$1,175.000
|
$500.000
|
$17,000.000
|
$5,000.000
|
$6,000.000
|
$3,241.190
|
$5,000.000
|
$19,801.000
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
1.000
|
$700.000
|
$1,280.000
|
$500.000
|
$629.820
|
$500.000
|
$500.000
|
$275.000
|
$1,000.000
|
$5,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
50.000
|
$15.000
|
$31.000
|
$30.000
|
$68.900
|
$25.000
|
$20.000
|
$9.820
|
$25.000
|
$20.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
259.000
|
$30.000
|
$22.000
|
$20.000
|
$25.280
|
$25.000
|
$20.000
|
$29.380
|
$25.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
473.000
|
$14.240
|
$30.000
|
$30.000
|
$47.910
|
$25.000
|
$20.000
|
$20.760
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
240.000
|
$6.190
|
$7.750
|
$15.000
|
$10.940
|
$10.000
|
$20.000
|
$20.460
|
$15.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
190.000
|
$15.000
|
$47.000
|
$40.000
|
$21.180
|
$15.000
|
$20.000
|
$25.840
|
$20.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
521.000
|
$10.000
|
$50.000
|
$15.000
|
$40.330
|
$15.000
|
$20.000
|
$53.130
|
$24.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
455.000
|
$12.000
|
$27.500
|
$50.000
|
$20.470
|
$30.000
|
$20.000
|
$61.000
|
$32.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,281.000
|
$11.500
|
$32.000
|
$30.000
|
$34.290
|
$30.000
|
$20.000
|
$66.250
|
$32.000
|
$40.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
4,641.000
|
$0.800
|
$9.000
|
$4.000
|
$2.540
|
$5.000
|
$1.000
|
$7.330
|
$3.000
|
$8.000
|
|
|
BLOCK SODDING
|
SY
|
4,641.000
|
$5.000
|
$6.250
|
$4.500
|
$4.750
|
$5.000
|
$4.000
|
$5.500
|
$5.800
|
$6.000
|
|
|
VEGETATIVE WATERING
|
MG
|
37.700
|
$15.000
|
$96.000
|
$20.000
|
$120.000
|
$100.000
|
$10.000
|
$1.100
|
$100.000
|
$50.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
1,258.000
|
$28.220
|
$20.000
|
$60.000
|
$35.000
|
$35.000
|
$20.000
|
$16.500
|
$30.000
|
$25.000
|
|
|
D-GR HMA(SQ) TY-C PG76-22
|
TON
|
50.000
|
$125.000
|
$425.000
|
$130.000
|
$155.530
|
$500.000
|
$250.000
|
$275.000
|
$400.000
|
$200.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
250.000
|
$16.000
|
$18.000
|
$7.000
|
$78.000
|
$50.000
|
$20.000
|
$60.500
|
$25.000
|
$20.000
|
|
|
CONC PAV (JOINT REINF) (10")
|
SY
|
50.000
|
$60.000
|
$112.500
|
$180.000
|
$112.160
|
$350.000
|
$200.000
|
$131.460
|
$175.000
|
$125.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,382.000
|
$25.220
|
$43.500
|
$15.000
|
$24.400
|
$55.000
|
$24.000
|
$104.160
|
$70.000
|
$50.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
324.000
|
$190.000
|
$279.000
|
$350.000
|
$219.570
|
$350.000
|
$400.000
|
$336.000
|
$345.000
|
$325.000
|
|
|
CL A CONC (MISC)
|
CY
|
20.000
|
$895.000
|
$590.000
|
$900.000
|
$1,129.230
|
$2,500.000
|
$500.000
|
$1,100.000
|
$850.000
|
$1,500.000
|
|
|
CL C CONC (ABUT)
|
CY
|
31.400
|
$850.000
|
$1,270.000
|
$2,000.000
|
$879.140
|
$1,800.000
|
$800.000
|
$3,012.000
|
$1,350.000
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
13.400
|
$950.000
|
$2,810.000
|
$2,000.000
|
$1,729.900
|
$2,500.000
|
$900.000
|
$5,388.000
|
$2,500.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
25.000
|
$900.000
|
$1,340.000
|
$2,500.000
|
$844.990
|
$1,800.000
|
$900.000
|
$3,048.000
|
$1,800.000
|
$1,500.000
|
|
|
RETAINING WALL (CONC BLOCK)
|
SF
|
4,315.000
|
$40.000
|
$40.000
|
$33.000
|
$40.000
|
$55.000
|
$30.000
|
$65.400
|
$23.000
|
$50.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
23.300
|
$600.000
|
$862.000
|
$800.000
|
$531.110
|
$800.000
|
$500.000
|
$611.980
|
$660.000
|
$650.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
1.600
|
$600.000
|
$1,268.000
|
$1,000.000
|
$2,135.090
|
$1,800.000
|
$500.000
|
$611.980
|
$1,800.000
|
$650.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
560.000
|
$11.500
|
$13.500
|
$15.000
|
$11.530
|
$55.000
|
$10.000
|
$18.240
|
$35.000
|
$20.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
669.000
|
$135.000
|
$105.000
|
$140.000
|
$80.180
|
$180.000
|
$250.000
|
$115.500
|
$145.000
|
$150.000
|
|
|
RAIL (PEDESTRIAN FENCE)
|
LF
|
270.000
|
$50.000
|
$50.000
|
$400.000
|
$28.000
|
$180.000
|
$200.000
|
$141.600
|
$130.000
|
$150.000
|
|
|
TYPE A JOINT
|
LF
|
40.000
|
$35.000
|
$40.000
|
$81.000
|
$51.250
|
$190.000
|
$200.000
|
$62.520
|
$90.000
|
$100.000
|
|
|
INLET (COMP) (TY SIDEWALK BRIDGE)
|
EA
|
1.000
|
$8,500.000
|
$10,900.000
|
$9,000.000
|
$14,401.920
|
$5,000.000
|
$19,950.000
|
$12,100.000
|
$11,000.000
|
$8,500.000
|
|
|
GRATE & FRAME
|
EA
|
5.000
|
$1,500.000
|
$1,020.000
|
$5,000.000
|
$1,041.740
|
$1,500.000
|
$1,200.000
|
$1,650.000
|
$2,250.000
|
$8,500.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
1.000
|
$4,000.000
|
$1,425.000
|
$3,000.000
|
$1,350.350
|
$1,000.000
|
$1,000.000
|
$1,650.000
|
$3,500.000
|
$3,500.000
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
6.000
|
$600.000
|
$840.000
|
$700.000
|
$860.290
|
$500.000
|
$500.000
|
$818.400
|
$1,700.000
|
$850.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$234,053.320
|
$198,900.000
|
$280,000.000
|
$258,426.950
|
$320,000.000
|
$249,000.000
|
$229,952.000
|
$339,000.000
|
$350,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$7,500.000
|
$3,445.000
|
$4,000.000
|
$6,960.540
|
$5,000.000
|
$8,000.000
|
$2,200.000
|
$8,000.000
|
$8,500.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
2,000.000
|
$7.000
|
$10.500
|
$3.000
|
$4.500
|
$5.000
|
$4.000
|
$1.100
|
$16.240
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,000.000
|
$3.000
|
$6.500
|
$3.000
|
$2.500
|
$3.000
|
$2.000
|
$1.100
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,000.000
|
$0.750
|
$2.500
|
$1.000
|
$0.500
|
$1.000
|
$0.700
|
$0.110
|
$0.850
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
500.000
|
$7.500
|
$5.000
|
$4.500
|
$3.500
|
$5.000
|
$4.000
|
$5.500
|
$7.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,659.000
|
$4.000
|
$6.000
|
$5.000
|
$5.500
|
$5.000
|
$4.000
|
$5.500
|
$5.200
|
$19.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,159.000
|
$1.000
|
$2.500
|
$1.500
|
$0.750
|
$1.000
|
$1.000
|
$1.100
|
$2.300
|
$9.000
|
|
|
CONC CURB (TY I)
|
LF
|
12.000
|
$15.000
|
$23.500
|
$65.000
|
$94.900
|
$50.000
|
$20.000
|
$46.030
|
$100.000
|
$40.000
|
|
|
CONC CURB (TY II)
|
LF
|
61.000
|
$20.000
|
$26.000
|
$75.000
|
$104.200
|
$50.000
|
$20.000
|
$46.030
|
$60.000
|
$40.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
209.000
|
$30.000
|
$30.000
|
$35.000
|
$35.400
|
$50.000
|
$30.000
|
$46.030
|
$32.000
|
$40.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
10.000
|
$300.000
|
$239.000
|
$200.000
|
$464.690
|
$150.000
|
$500.000
|
$876.900
|
$350.000
|
$125.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
666.000
|
$80.000
|
$87.000
|
$110.000
|
$148.430
|
$120.000
|
$90.000
|
$87.210
|
$85.000
|
$85.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,003.000
|
$60.000
|
$57.000
|
$60.000
|
$52.960
|
$75.000
|
$70.000
|
$80.830
|
$52.000
|
$65.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
300.000
|
$85.000
|
$70.000
|
$65.000
|
$74.850
|
$75.000
|
$70.000
|
$77.360
|
$65.000
|
$75.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
1,258.000
|
$95.000
|
$72.000
|
$75.000
|
$86.060
|
$80.000
|
$70.000
|
$92.890
|
$78.000
|
$85.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$1,800.000
|
$1,480.000
|
$2,500.000
|
$1,955.210
|
$1,800.000
|
$1,700.000
|
$1,248.770
|
$3,200.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$1,800.000
|
$1,480.000
|
$2,500.000
|
$2,067.150
|
$2,500.000
|
$1,700.000
|
$1,248.770
|
$3,300.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
2.000
|
$2,500.000
|
$1,480.000
|
$3,000.000
|
$1,954.550
|
$1,800.000
|
$2,600.000
|
$1,248.770
|
$3,600.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
3.000
|
$1,800.000
|
$1,480.000
|
$3,000.000
|
$1,954.760
|
$1,500.000
|
$1,700.000
|
$1,248.770
|
$3,200.000
|
$3,000.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
873.000
|
$125.000
|
$111.000
|
$100.000
|
$208.380
|
$250.000
|
$360.000
|
$209.060
|
$390.000
|
$85.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
40.000
|
$50.000
|
$22.500
|
$4.000
|
$2.790
|
$5.000
|
$3.000
|
$104.500
|
$10.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$300.000
|
$313.000
|
$400.000
|
$215.280
|
$500.000
|
$250.000
|
$1,650.000
|
$300.000
|
$500.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
10.000
|
$250.000
|
$332.000
|
$350.000
|
$250.000
|
$400.000
|
$300.000
|
$165.000
|
$300.000
|
$850.000
|
|
|
GROUND BOX TY C (162911)
|
EA
|
2.000
|
$1,200.000
|
$867.000
|
$1,500.000
|
$1,249.540
|
$1,500.000
|
$1,000.000
|
$825.000
|
$2,500.000
|
$1,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$410.000
|
$136.000
|
$200.000
|
$236.510
|
$500.000
|
$400.000
|
$55.000
|
$500.000
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
7.000
|
$900.000
|
$710.000
|
$200.000
|
$378.410
|
$500.000
|
$500.000
|
$275.000
|
$350.000
|
$850.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
20.000
|
$1,000.000
|
$775.000
|
$200.000
|
$540.120
|
$500.000
|
$500.000
|
$275.000
|
$300.000
|
$850.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$200.000
|
$136.000
|
$200.000
|
$70.030
|
$100.000
|
$100.000
|
$165.000
|
$100.000
|
$450.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
84.000
|
$20.000
|
$45.000
|
$30.000
|
$21.380
|
$30.000
|
$20.000
|
$16.500
|
$17.000
|
$20.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
84.000
|
$3.500
|
$26.000
|
$8.000
|
$5.700
|
$10.000
|
$10.000
|
$4.400
|
$5.200
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
84.000
|
$10.000
|
$4.000
|
$5.000
|
$2.850
|
$20.000
|
$1.000
|
$2.200
|
$13.000
|
$20.000
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
3.000
|
$395.000
|
$1,550.000
|
$1,100.000
|
$1,265.560
|
$1,000.000
|
$600.000
|
$605.000
|
$1,500.000
|
$1,800.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
3.000
|
$200.000
|
$260.000
|
$500.000
|
$21.180
|
$500.000
|
$100.000
|
$55.000
|
$350.000
|
$500.000
|
|
|
PREFAB PED STL TRUSS BRG SPAN (85 FT)
|
EA
|
1.000
|
$220,000.000
|
$96,490.000
|
$150,000.000
|
$102,429.400
|
$8,000.000
|
$119,999.000
|
$97,560.000
|
$200,000.000
|
$150,000.000
|
|
|
PREFAB PED STL TRUSS BRG SPAN (135 FT)
|
EA
|
1.000
|
$390,000.000
|
$274,960.000
|
$280,000.000
|
$247,138.110
|
$15,000.000
|
$219,999.000
|
$227,760.000
|
$350,000.000
|
$350,000.000
|
|
|
PREFAB PED STL TRUSS BRG SPAN (45 FT)
|
EA
|
1.000
|
$146,000.000
|
$55,630.000
|
$110,000.000
|
$53,901.990
|
$7,500.000
|
$59,995.000
|
$55,560.000
|
$150,000.000
|
$70,000.000
|
|
|
CONCRETE VEHICULAR GRADE CROSSING
|
LF
|
16.000
|
$1,500.000
|
$353.000
|
$100.000
|
$1,500.000
|
$250.000
|
$200.000
|
$4,400.000
|
$3,500.000
|
$2,000.000
|
|
|
RETROFIT DET WARN SURF(SURF APPLIED)
|
EA
|
5.000
|
$500.000
|
$640.000
|
$1,000.000
|
$150.000
|
$350.000
|
$400.000
|
$947.010
|
$500.000
|
$2,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$23,910.000
|
$10,000.000
|
$2,395.560
|
$10,000.000
|
$15,000.000
|
$6,050.000
|
$17,500.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
300.000
|
$200.000
|
$193.000
|
$150.000
|
$199.620
|
$100.000
|
$300.000
|
$88.000
|
$250.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
4.000
|
$47.110
|
$32.500
|
$300.000
|
$54.700
|
$100.000
|
$250.000
|
$275.000
|
$75.000
|
$85.000
|
|
Totals: |
$2,664,586.480
|
$2,447,065.100
|
$2,632,353.000
|
$2,683,873.143
|
$2,716,929.000
|
$2,776,302.000
|
$3,238,186.980
|
$3,401,347.100
|
$3,403,451.150
|