Show Job Controls
Bid Cobra

BELL FM 3470 (3534-01-021)

Items: 91

County: BELL
Length: 0.0000 MILES (6.4778 MILES)
Highway: FM 3470
District: WACO
Control Number: 3534-01-021
DBE Goal: 0.0%
Project: STP 2026(853)VRU
Guaranty: $89,000.00
Time: 223 WORKING DAYS
Engineer's Estimate: $4,466,139.97
Date: 08/06/2026 1:00 PM CDT (6 weeks ago) Changed
Contract Number: 8263017
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00194280
Contract Type: FEDERAL
Project Description: INSTALL SIDEWALK
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (8)
E
Engineer's Estimate
$4,466,139.97
$4,094,514.95
Over/Under Est: -8.32% -$371,625.02
$4,347,031.70
Over/Under Est: -2.67% -$119,108.27
Amt Left: 6.17% $252,516.75
Over/Under Est: -2.11% -$94,098.80
Amt Left: 6.78% $277,526.22
Delta: -0.58% -$25,009.47
$4,887,385.14
Over/Under Est: 9.43% $421,245.17
Amt Left: 19.36% $792,870.19
Delta: -11.79% -$515,343.97
Over/Under Est: 10.5% $468,879.28
Amt Left: 20.53% $840,504.30
Delta: -0.97% -$47,634.11
$5,007,508.40
Over/Under Est: 12.12% $541,368.43
Amt Left: 22.3% $912,993.45
Delta: -1.47% -$72,489.15
Over/Under Est: 19.73% $881,219.19
Amt Left: 30.6% $1,252,844.21
Delta: -6.79% -$339,850.76
Over/Under Est: 30.66% $1,369,508.13
Amt Left: 42.52% $1,741,133.15
Delta: -9.13% -$488,288.94

Bid Items & Bid Tabulations

91 Total 0 of 91
BELL  |  FM 3470  |  WACO  |  3534-01-021  |  08/06/2026 1:00 PM CDT  |  $4,466,139.97  |  STP 2026(853)VRU  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  223 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RUCOBA & MAYA CONSTRUCTION, LLC
YOKO EXCAVATING, LLC
TEXAS STEEL INDUSTRIAL PLACING, LLC
TI-ZACK CONCRETE, LLC
JOE BLAND CONSTRUCTION LLC
STX CIVIL
GARRET SHIELDS INFRASTRUCTURE
CROSS PLUS CONSTRUCTION, LLC
PREPARING ROW
STA 359.000 $950.000 $230.000 $483.130 $400.000 $660.000 $1,125.000 $300.000 $500.000 $150.000
REMOV CONC (DRIVEWAYS)
SY 266.000 $20.000 $28.000 $19.060 $60.000 $53.140 $30.000 $25.000 $20.000 $60.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 86.000 $215.000 $28.000 $18.950 $100.000 $41.090 $50.000 $25.000 $20.000 $60.000
RMV (3") TRT/UNTRT BASE & ASPH PAV
SY 3,097.000 $5.000 $18.000 $3.400 $20.000 $27.390 $10.000 $8.000 $10.000 $60.000
EXCAV (ROADWAY)
CY 333.000 $11.000 $62.000 $16.220 $30.000 $42.450 $120.000 $45.000 $30.000 $60.000
EMBANK (FNL)(OC)(TY B)
CY 1,123.000 $18.000 $77.000 $23.750 $30.000 $31.470 $30.000 $40.000 $20.000 $60.000
HYDRO MULCH SEED (PERM_URBAN_CLAY)
SY 59,846.000 $0.130 $0.550 $0.870 $0.430 $1.100 $2.000 $0.550 $0.650 $1.000
VEGETATIVE WATERING
TGL 324.000 $22.000 $58.000 $33.610 $30.000 $1.100 $20.000 $50.000 $20.000 $100.000
DRILL SHAFT (TRF SIG POLE) (24 IN)
LF 354.000 $285.000 $497.700 $258.750 $225.000 $247.500 $265.000 $315.000 $500.000 $350.000
RIPRAP (CONC)(5 IN)
CY 45.000 $610.000 $550.000 $532.390 $550.000 $621.510 $775.000 $650.000 $500.000 $500.000
RAIL (HANDRAIL)(TY D)
LF 1,597.000 $180.000 $200.000 $218.380 $201.410 $214.500 $250.000 $205.000 $200.000 $199.000
RC PIPE (CL IV)(15 IN)
LF 52.000 $170.000 $100.000 $337.080 $90.000 $104.500 $250.000 $100.000 $60.000 $100.000
RC PIPE (CL IV)(18 IN)
LF 264.000 $95.000 $120.000 $144.910 $110.000 $115.500 $275.000 $100.000 $80.000 $110.000
RC PIPE (CL IV)(24 IN)
LF 152.000 $134.000 $160.000 $216.550 $120.000 $159.500 $300.000 $140.000 $120.000 $150.000
SET (TY II) (15 IN) (RCP) (3: 1) (C)
EA 2.000 $1,900.000 $950.000 $1,490.000 $1,000.000 $1,650.000 $2,500.000 $2,000.000 $1,000.000 $3,500.000
SET (TY II) (15 IN) (RCP) (4: 1) (C)
EA 2.000 $2,013.000 $1,200.000 $1,490.000 $1,000.000 $1,980.000 $2,500.000 $2,100.000 $1,000.000 $3,500.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 4.000 $2,000.000 $1,600.000 $1,400.000 $1,000.000 $2,420.000 $2,500.000 $2,300.000 $1,000.000 $3,500.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $900.000 $1,100.000 $1,550.000 $2,000.000 $2,530.000 $2,800.000 $2,400.000 $1,000.000 $3,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 8.000 $1,600.000 $2,500.000 $1,555.000 $2,000.000 $2,604.800 $2,800.000 $2,800.000 $1,000.000 $3,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 5.000 $1,100.000 $1,800.000 $1,840.000 $2,000.000 $2,750.000 $3,500.000 $2,800.000 $1,000.000 $3,500.000
SET (TY II) (24 IN) (CMP) (3: 1) (C)
EA 2.000 $2,140.000 $2,100.000 $2,280.000 $2,000.000 $1,650.000 $3,000.000 $3,000.000 $1,500.000 $3,500.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 2.000 $1,400.000 $1,300.000 $2,280.000 $2,000.000 $1,705.000 $3,000.000 $3,100.000 $1,500.000 $3,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $1,750.000 $2,600.000 $3,695.000 $2,000.000 $1,980.000 $5,000.000 $3,800.000 $1,500.000 $3,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,500.000 $2,300.000 $2,070.000 $2,000.000 $2,530.000 $4,000.000 $3,800.000 $1,500.000 $3,500.000
ADJUSTING MANHOLES
EA 1.000 $1,200.000 $1,200.000 $1,500.000 $1,300.000 $706.800 $2,500.000 $4,500.000 $1,000.000 $2,000.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 5.000 $510.000 $500.000 $800.000 $1,000.000 $424.080 $2,500.000 $750.000 $500.000 $1,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 28.000 $680.000 $150.000 $500.000 $700.000 $252.430 $1,000.000 $750.000 $500.000 $500.000
REMOV STR (SET)
EA 24.000 $380.000 $400.000 $200.000 $500.000 $275.000 $750.000 $450.000 $100.000 $250.000
REMOV STR (PIPE)
LF 340.000 $16.000 $30.000 $15.000 $20.000 $13.200 $75.000 $14.000 $10.000 $100.000
MOBILIZATION
LS 1.000 $431,338.890 $340,000.000 $206,425.000 $437,164.770 $222,245.200 $225,000.000 $350,000.000 $400,000.000 $275,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $6,550.000 $4,500.000 $3,256.240 $2,500.000 $8,250.000 $1,750.000 $4,500.000 $5,000.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $18,900.000 $14,000.000 $30,000.000 $1,320.000 $21,750.000 $10,000.000 $1,000.000 $1,500.000
TMA (STATIONARY)
DAY 223.000 $160.000 $240.450 $278.000 $175.000 $127.600 $275.000 $160.000 $300.000 $300.000
TMA (MOBILE OPERATION)
DAY 7.000 $160.000 $350.000 $498.520 $200.000 $275.000 $415.000 $250.000 $300.000 $800.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,860.000 $4.150 $3.900 $4.710 $4.000 $0.110 $5.000 $4.000 $5.000 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,860.000 $0.990 $1.700 $1.350 $1.000 $0.110 $2.000 $2.000 $1.000 $1.000
DRIVEWAYS (CONC) (HES)
SY 2,814.000 $120.000 $78.630 $102.110 $110.000 $121.400 $150.000 $110.000 $120.000 $125.000
CONC SIDEWALKS (5")
SY 19,714.000 $61.000 $59.270 $81.000 $75.000 $101.110 $65.000 $80.000 $100.000 $125.000
CURB RAMPS (TY 1)
EA 24.000 $2,850.000 $1,600.000 $1,597.880 $2,500.000 $1,883.380 $2,150.000 $1,150.000 $3,000.000 $1,900.000
CURB RAMPS (TY 2)
EA 5.000 $2,590.000 $1,600.000 $1,535.990 $2,500.000 $1,883.380 $2,150.000 $2,000.000 $3,000.000 $2,400.000
CURB RAMPS (TY 3)
EA 1.000 $2,145.000 $2,000.000 $2,007.300 $2,500.000 $1,883.380 $3,000.000 $2,800.000 $3,000.000 $2,000.000
CURB RAMPS (TY 5)
EA 4.000 $4,500.000 $3,200.000 $2,577.850 $2,800.000 $1,883.380 $3,750.000 $2,800.000 $3,000.000 $2,000.000
CURB RAMPS (TY 7)
EA 44.000 $2,800.000 $1,800.000 $2,003.120 $3,000.000 $1,883.380 $3,500.000 $1,850.000 $3,000.000 $1,980.000
CURB RAMPS (TY 22)
EA 4.000 $5,500.000 $4,200.000 $3,050.090 $5,000.000 $1,883.380 $5,300.000 $2,800.000 $3,000.000 $2,040.000
CONDT (PVC) (SCH 40) (3")
LF 1,129.000 $20.000 $22.470 $18.400 $16.000 $17.600 $20.000 $30.000 $25.000 $29.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 2,824.000 $38.000 $33.490 $39.000 $30.000 $33.000 $40.000 $30.000 $35.000 $75.000
CONDUIT (PREPARE)
LF 1,285.000 $5.000 $2.520 $3.450 $3.000 $3.300 $5.000 $8.500 $30.000 $21.000
ELEC CONDR (NO.8) BARE
LF 5,597.000 $1.850 $1.990 $1.610 $1.400 $1.540 $2.000 $2.000 $2.380 $5.000
ELEC CONDR (NO.8) INSULATED
LF 2,760.000 $2.000 $2.520 $1.780 $1.550 $1.710 $2.000 $1.500 $16.000 $5.000
GROUND BOX TY D (162922)
EA 24.000 $1,200.000 $1,155.000 $1,265.000 $1,100.000 $1,210.000 $1,295.000 $1,650.000 $1,350.000 $2,999.000
GROUND BOX TY D (162922)W/APRON
EA 30.000 $1,600.000 $2,008.650 $1,380.000 $1,200.000 $1,320.000 $1,400.000 $1,850.000 $2,300.000 $2,000.000
ALUMINUM SIGNS (TY A)
SF 299.000 $80.000 $84.000 $29.330 $25.000 $28.050 $30.000 $55.000 $40.000 $25.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 26.000 $900.000 $440.000 $375.000 $375.000 $753.500 $475.000 $500.000 $500.000 $1,200.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 4,144.000 $10.000 $7.350 $6.560 $6.400 $7.040 $8.000 $7.250 $8.000 $6.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 44.000 $11.000 $7.350 $8.200 $8.000 $8.800 $8.000 $7.250 $10.000 $6.000
PAVEMENT SLER 6"
LF 73.000 $2.000 $0.520 $0.510 $0.500 $0.550 $1.000 $0.800 $0.750 $2.500
PAVEMENT SLER 24"
LF 4,188.000 $5.000 $3.150 $0.560 $0.550 $0.610 $3.500 $3.250 $0.700 $5.200
PAVEMENT SLER (ARROW)
EA 15.000 $40.000 $52.500 $18.450 $18.000 $19.800 $60.000 $60.000 $22.500 $150.000
PAVEMENT SLER (DBL ARROW)
EA 1.000 $45.000 $78.750 $18.450 $18.000 $19.800 $88.000 $95.000 $22.500 $300.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 73.000 $1.000 $1.050 $1.030 $1.000 $1.100 $1.250 $1.250 $1.250 $6.500
PREFAB PM TY C (W)(ARROW)
EA 15.000 $250.000 $288.750 $202.950 $198.000 $217.800 $325.000 $280.000 $250.000 $500.000
PREFAB PM TY C (W)(DBL ARROW)
EA 1.000 $275.000 $393.750 $369.000 $360.000 $396.000 $440.000 $400.000 $450.000 $750.000
ELIM EXT PM & MRKS (6")
LF 505.000 $2.000 $1.050 $2.050 $2.000 $2.200 $1.250 $1.250 $2.500 $3.500
ELIM EXT PM & MRKS (8")
LF 237.000 $2.500 $2.100 $3.080 $3.000 $3.300 $2.500 $2.100 $3.750 $5.500
ELIM EXT PM & MRKS (12")
LF 221.000 $3.000 $3.150 $3.080 $3.000 $3.300 $3.500 $3.100 $3.750 $6.500
ELIM EXT PM & MRKS (24")
LF 2,290.000 $6.000 $6.300 $3.080 $3.000 $3.300 $7.000 $6.100 $3.750 $8.000
ELIM EXT PM & MRKS (ARROW)
EA 18.000 $50.000 $157.500 $61.500 $60.000 $66.000 $175.000 $160.000 $75.000 $100.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 2.000 $55.000 $210.000 $71.750 $70.000 $77.000 $235.000 $220.000 $90.000 $500.000
PAV SURF PREP FOR MRK (6")
LF 73.000 $1.000 $0.260 $0.210 $0.200 $0.220 $0.500 $0.450 $0.250 $2.000
PAV SURF PREP FOR MRK (24")
LF 4,188.000 $3.000 $1.050 $0.510 $0.500 $0.550 $1.250 $1.100 $0.600 $6.500
PAV SURF PREP FOR MRK (ARROW)
EA 15.000 $20.000 $52.500 $20.500 $20.000 $22.000 $60.000 $60.000 $25.000 $250.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $25.000 $52.500 $20.500 $20.000 $22.000 $60.000 $60.000 $25.000 $500.000
INSTALL HWY TRF SIG (SYSTEM)
EA 4.000 $35,000.000 $34,266.750 $45,885.000 $39,900.000 $43,890.000 $47,500.000 $70,500.000 $40,000.000 $24,000.000
REMOVING TRAFFIC SIGNALS
EA 4.000 $5,000.000 $3,575.250 $6,555.000 $5,700.000 $6,270.000 $6,750.000 $13,500.000 $4,000.000 $1,250.000
INSTALL HWY TRF SIG (UPGRADE)
EA 5.000 $7,000.000 $3,491.360 $8,000.000 $6,400.000 $7,040.000 $7,500.000 $37,000.000 $4,000.000 $24,100.000
VEH SIG SEC (12")LED(GRN ARW)
EA 22.000 $340.000 $367.500 $356.500 $310.000 $341.000 $365.000 $500.000 $425.000 $300.000
VEH SIG SEC (12")LED(YEL ARW)
EA 44.000 $340.000 $367.500 $356.500 $310.000 $341.000 $365.000 $400.000 $425.000 $300.000
VEH SIG SEC (12")LED(RED ARW)
EA 22.000 $340.000 $367.500 $356.500 $310.000 $341.000 $365.000 $400.000 $425.000 $300.000
PED SIG SEC (LED)(COUNTDOWN)
EA 68.000 $750.000 $819.000 $759.000 $660.000 $726.000 $775.000 $1,000.000 $900.000 $300.000
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 65.000 $250.000 $514.500 $178.250 $155.000 $170.500 $185.000 $250.000 $600.000 $350.000
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 23.000 $275.000 $493.500 $253.000 $220.000 $242.000 $255.000 $330.000 $850.000 $350.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 11,261.000 $2.000 $2.100 $2.130 $1.850 $2.040 $2.500 $2.750 $2.500 $5.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 14,430.000 $3.000 $3.465 $3.050 $2.650 $2.920 $3.500 $5.250 $4.000 $5.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 2,597.000 $3.750 $5.250 $3.680 $3.200 $3.520 $4.000 $5.000 $6.250 $5.000
PED POLE ASSEMBLY
EA 61.000 $3,000.000 $2,075.850 $1,495.000 $1,300.000 $1,430.000 $1,650.000 $5,000.000 $2,400.000 $999.000
PED DETECT PUSH BUTTON (APS)
EA 68.000 $1,000.000 $1,176.000 $1,138.500 $990.000 $1,089.000 $1,250.000 $1,000.000 $1,400.000 $1,199.000
PED DETECTOR CONTROLLER UNIT
EA 9.000 $3,000.000 $4,935.000 $5,060.000 $4,400.000 $4,840.000 $5,500.000 $4,500.000 $5,800.000 $5,955.000
INSTALL OF CABLES
LF 291.000 $5.000 $2.360 $5.060 $4.400 $4.840 $5.000 $6.000 $130.000 $5.000
VIVDS CABLE (INSTALL)
LF 2,667.000 $5.000 $3.940 $3.910 $3.400 $3.740 $4.250 $4.000 $4.500 $4.000
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 4.000 $9,500.000 $10,573.500 $12,625.000 $10,100.000 $11,110.000 $12,750.000 $2,800.000 $12,500.000 $14,000.000
GROUND BOX (PREPARE)
EA 13.000 $500.000 $238.350 $281.750 $245.000 $269.500 $315.000 $750.000 $3,000.000 $750.000
Totals: $4,466,139.970 $4,094,514.950 $4,347,031.700 $4,372,041.170 $4,887,385.140 $4,935,019.250 $5,007,508.400 $5,347,359.160 $5,835,648.100
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $30,000.00