Show Job Controls
Bid Cobra

BELL SH0036 (6496-31-001)

Items: 72

County: BELL
Length: 0.0100 MILES
Highway: SH0036
District: WACO
Control Number: 6496-31-001
DBE Goal: 0.0%
Project: BPM - A00219217
Guaranty: $0.00
Time: 85 WORKING DAYS
Engineer's Estimate: $1,644,862.51
Date: 08/05/2026 1:00 PM CDT (6 weeks ago) Changed
Contract Number: 8264003
Type: BRIDGE REPAIR
Project ID: A00219217
Project Description: BRIDGE REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (4)
E
Engineer's Estimate
$1,644,862.51
$1,320,412.04
Over/Under Est: -19.73% -$324,450.47
$1,493,369.00
Over/Under Est: -9.21% -$151,493.51
Amt Left: 13.1% $172,956.96
Over/Under Est: -0.22% -$3,694.14
Amt Left: 24.29% $320,756.33
Delta: -9.90% -$147,799.37
Over/Under Est: 89.19% $1,466,977.49
Amt Left: 135.67% $1,791,427.96
Delta: -89.61% -$1,470,671.63

Bid Items & Bid Tabulations

72 Total 0 of 72
BELL  |  SH0036  |  WACO  |  6496-31-001  |  08/05/2026 1:00 PM CDT  |  $1,644,862.51  |  BPM - A00219217  |  BRIDGE REPAIR  |  85 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCR CIVIL CONSTRUCTION, LLC
TAYLOR BRIDGE LLC
RAGLE CONSTRUCTION, INC.
BLACKSMITH VENTURES LLC
REMOV CONC (MOWSTRIP)
LF 19.000 $5.290 $62.000 $50.000 $40.000 $240.000
REMOV CONC (RIPRAP)
SY 20.000 $31.620 $95.750 $500.000 $74.000 $300.000
REMOV CONC (MISC)
CY 10.000 $100.000 $273.000 $500.000 $123.000 $500.000
EMBANK (VEH)(OC)(TY B)
CY 90.000 $40.000 $71.000 $50.000 $82.000 $200.000
SP MIXES SP-C SAC-B PG70-22 (EXEMPT)
TON 216.000 $367.500 $330.000 $255.000 $215.000 $300.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 270.000 $45.100 $224.000 $120.000 $60.000 $250.000
PLANE ASPH CONC PAV (0" TO 5")
SY 1,874.000 $4.000 $17.000 $12.500 $8.700 $15.000
PAV JT UNDERSEAL (24")
LF 1,246.000 $16.330 $31.000 $20.000 $15.800 $40.000
FLOWABLE BACKFILL
CY 34.000 $385.000 $681.000 $1,000.000 $354.000 $900.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 140.000 $27.500 $45.000 $35.000 $108.000 $200.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 750.000 $143.000 $31.000 $60.000 $155.000 $180.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 137.000 $148.000 $142.000 $375.000 $70.000 $500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 204.000 $177.500 $179.000 $500.000 $80.000 $220.000
RIPRAP (MOW STRIP)(4 IN)
CY 0.800 $620.000 $3,900.000 $2,000.000 $2,200.000 $4,500.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 50.000 $200.000 $302.000 $500.000 $136.000 $300.000
CLEANING AND SEALING EXIST JOINTS (CL3)
LF 863.000 $50.000 $26.000 $50.000 $30.000 $65.000
CLEANING AND SEALING EXIST JOINTS (CL7)
LF 931.000 $45.000 $26.000 $50.000 $30.000 $65.000
STR STEEL (MISC NON-BRIDGE)
LB 78.000 $20.000 $38.000 $50.000 $34.000 $200.000
STR STEEL (PEDESTAL)
LB 1,327.000 $15.000 $33.000 $10.000 $24.000 $120.000
RETROFIT RAIL (TY T402)
LF 7.700 $195.000 $2,620.000 $1,500.000 $815.000 $900.000
GABIONS (GALV)
CY 40.000 $530.000 $450.000 $500.000 $411.000 $750.000
SHOT BLASTING
SY 1,888.000 $4.500 $5.750 $10.000 $2.900 $25.000
RAISING EXIST STRUCT
LS 2.000 $49,396.000 $14,500.000 $35,000.000 $200,000.000 $90,000.000
MOBILIZATION
LS 1.000 $121,841.670 $126,000.000 $150,000.000 $163,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,830.000 $11,600.000 $5,000.000 $60,000.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $83.540 $160.000 $500.000 $55.000 $400.000
TMA (STATIONARY)
DAY 50.000 $150.000 $320.000 $250.000 $287.000 $200.000
TMA (MOBILE OPERATION)
HR 40.000 $65.000 $90.000 $125.000 $769.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $4.260 $5.900 $5.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $1.000 $1.420 $1.000 $1.200 $2.000
MTL W-BEAM GD FEN (STEEL POST)
LF 30.000 $30.000 $118.000 $125.000 $45.000 $200.000
MTL BEAM GD FEN TRANS(THRIE BEAM)28"
EA 1.000 $2,000.000 $3,540.000 $5,000.000 $2,800.000 $4,500.000
REMOVE METAL BEAM GUARD FENCE
LF 19.000 $3.000 $23.600 $50.000 $5.000 $100.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,500.000 $4,000.000 $7,500.000 $5,000.000 $6,500.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 1.000 $350.000 $600.000 $500.000 $500.000 $3,500.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 287.000 $1.400 $4.700 $15.000 $2.370 $20.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 26.000 $1.300 $4.700 $40.000 $1.880 $20.000
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 140.000 $0.700 $5.650 $2.000 $2.000 $50.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 1,000.000 $0.700 $2.050 $2.000 $2.000 $10.000
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 1,000.000 $0.700 $2.050 $2.000 $2.000 $10.000
TY I HIGH PERF PM (W)6"(DOT)(100 MIL)
LF 52.000 $3.500 $13.550 $2.000 $2.000 $50.000
TY I HIGH PERF PM (W)8"(DOT)(100 MIL)
LF 32.000 $6.000 $22.550 $2.000 $2.000 $50.000
TY I HIGH PERF PM(W)8"(SLD)(100 MIL)
LF 316.000 $4.000 $2.850 $2.000 $2.000 $25.000
PREFAB PM TY C (W)(24")(SLD)
LF 184.000 $16.000 $16.000 $2.000 $12.000 $140.000
PREFAB PM TY C (W)(ARROW)
EA 2.000 $238.500 $333.000 $300.000 $300.000 $700.000
PREFAB PM TY C (W)(DBL ARROW)
EA 2.000 $320.000 $321.000 $400.000 $400.000 $1,200.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $289.000 $395.000 $400.000 $300.000 $900.000
REFL PAV MRKR TY II-A-A
EA 26.000 $5.250 $6.760 $5.000 $5.000 $100.000
REFL PAV MRKR TY II-C-R
EA 26.000 $5.050 $6.760 $5.000 $5.000 $100.000
ELIM EXT PM & MRKS (6")
LF 192.000 $0.750 $1.700 $5.000 $5.000 $20.000
ELIM EXT PM & MRKS (8")
LF 348.000 $1.000 $2.850 $5.000 $5.000 $25.000
ELIM EXT PM & MRKS (24")
LF 184.000 $4.000 $9.000 $10.000 $10.000 $30.000
ELIM EXT PM & MRKS (ARROW)
EA 2.000 $69.450 $254.000 $100.000 $100.000 $400.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 2.000 $76.000 $254.000 $150.000 $150.000 $400.000
ELIM EXT PM & MRKS (WORD)
EA 2.000 $70.000 $254.000 $100.000 $100.000 $600.000
PAV SURF PREP FOR MRK (6")
LF 192.000 $0.240 $0.030 $0.250 $0.100 $10.000
PAV SURF PREP FOR MRK (8")
LF 348.000 $0.200 $0.170 $0.250 $0.100 $10.000
PAV SURF PREP FOR MRK (24")
LF 184.000 $1.000 $1.150 $0.250 $0.100 $10.000
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $15.000 $34.000 $5.000 $0.100 $300.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $16.250 $34.000 $5.000 $0.100 $300.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $15.300 $34.000 $5.000 $0.100 $300.000
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 665.000 $230.000 $75.500 $65.000 $51.000 $300.000
DRIFTWOOD REMOVAL
CY 15.000 $80.850 $526.000 $500.000 $109.000 $400.000
REPLACE(STEEL RAIL)
LF 30.000 $200.000 $429.000 $500.000 $165.000 $600.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 60.000 $63.800 $139.000 $200.000 $29.500 $150.000
CNC CRACK REPAIR (FLOOD)(GRAVITY)
SF 16,960.000 $16.000 $2.000 $7.500 $3.700 $14.000
REP STL BRIDGE MBR (WELD REPAIR)
EA 2.000 $7,500.000 $3,300.000 $22,500.000 $2,100.000 $40,000.000
BRIDGE JOINT REPAIR (HEADER)
LF 156.000 $140.000 $109.000 $150.000 $114.000 $900.000
CONCRETE BEAM REPAIR
EA 11.000 $3,500.000 $2,490.000 $2,000.000 $1,900.000 $16,000.000
UNDERSEAL COURSE
GAL 469.000 $3.700 $7.000 $10.000 $12.000 $30.000
INWATER COLUMN ENCAPSULATION
LF 160.000 $2,500.000 $2,365.000 $1,800.000 $853.000 $3,500.000
BENT CAP/ABUTMENT CAP CLEANING
EA 9.000 $556.000 $1,682.000 $1,000.000 $678.000 $1,000.000
Totals: $1,644,862.510 $1,320,412.040 $1,493,369.000 $1,641,168.370 $3,111,840.000