FURN & PLACE TOPSOIL (4")
|
SY
|
3,403.000
|
$4.000
|
$7.500
|
$5.400
|
$4.000
|
$5.340
|
$4.400
|
$6.100
|
|
|
BLOCK SODDING
|
SY
|
3,403.000
|
$6.000
|
$7.500
|
$6.950
|
$7.320
|
$6.870
|
$6.700
|
$8.100
|
|
|
VEGETATIVE WATERING
|
TGL
|
58.000
|
$150.000
|
$75.000
|
$55.000
|
$117.060
|
$139.170
|
$23.100
|
$66.700
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
1,290.000
|
$92.000
|
$69.760
|
$127.000
|
$199.000
|
$113.710
|
$84.680
|
$100.000
|
|
|
SP MIXES SP-C SAC-B HPG
|
TON
|
13,866.000
|
$92.000
|
$117.870
|
$137.000
|
$139.000
|
$124.740
|
$129.800
|
$161.700
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
38,047.000
|
$33.000
|
$25.550
|
$27.000
|
$26.000
|
$29.640
|
$32.540
|
$32.300
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
14,256.000
|
$39.000
|
$39.500
|
$41.150
|
$40.500
|
$44.980
|
$48.650
|
$47.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(16")
|
SY
|
437.000
|
$165.000
|
$73.190
|
$116.000
|
$130.500
|
$128.800
|
$134.920
|
$145.500
|
|
|
PLANE ASPH CONC PAV(0" TO 0.5" MICRO)
|
SY
|
120,572.000
|
$0.500
|
$0.200
|
$0.900
|
$0.500
|
$0.940
|
$0.550
|
$0.500
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
120,572.000
|
$2.000
|
$1.250
|
$2.330
|
$2.000
|
$1.470
|
$2.200
|
$2.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$3,650.000
|
$2,500.000
|
$3,100.000
|
$2,666.160
|
$2,798.430
|
$3,200.000
|
$3,244.800
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$301,293.720
|
$34,310.680
|
$146,000.000
|
$185,000.000
|
$495,000.000
|
$396,903.680
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$15,000.000
|
$1,623.000
|
$6,700.000
|
$1,645.000
|
$3,159.940
|
$4,041.570
|
$10,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$7,600.000
|
$100.000
|
$1,000.000
|
$7,500.000
|
$11,489.350
|
$2,706.250
|
$14,698.000
|
|
|
TMA (STATIONARY)
|
DAY
|
196.000
|
$180.000
|
$50.000
|
$25.000
|
$250.000
|
$142.060
|
$81.190
|
$248.100
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
56.000
|
$85.000
|
$25.000
|
$50.000
|
$100.000
|
$73.560
|
$119.080
|
$82.900
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
369.000
|
$64.000
|
$36.500
|
$54.000
|
$51.960
|
$52.910
|
$46.350
|
$60.600
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
369.000
|
$12.000
|
$3.000
|
$7.000
|
$19.950
|
$6.910
|
$10.300
|
$8.100
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
112.000
|
$22.000
|
$0.010
|
$22.400
|
$43.880
|
$22.130
|
$25.750
|
$25.300
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
112.000
|
$5.000
|
$0.010
|
$6.800
|
$15.130
|
$6.720
|
$10.300
|
$7.600
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,914.000
|
$3.500
|
$6.500
|
$3.500
|
$6.360
|
$3.460
|
$3.140
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,914.000
|
$1.000
|
$1.000
|
$0.250
|
$1.590
|
$0.250
|
$1.030
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,499.000
|
$7.500
|
$3.250
|
$7.450
|
$9.450
|
$7.360
|
$4.890
|
$8.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,499.000
|
$1.000
|
$0.500
|
$1.000
|
$1.590
|
$0.990
|
$2.060
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
412.500
|
$27.000
|
$27.500
|
$25.550
|
$27.600
|
$29.790
|
$26.650
|
$30.300
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,200.000
|
$1,200.000
|
$1,280.000
|
$2,037.430
|
$1,205.340
|
$1,623.000
|
$1,842.900
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
375.000
|
$2.850
|
$4.000
|
$6.000
|
$2.280
|
$2.970
|
$4.000
|
$4.600
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$250.000
|
$300.000
|
$548.000
|
$262.680
|
$217.360
|
$285.000
|
$323.800
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$3,200.000
|
$3,500.000
|
$3,580.000
|
$3,638.960
|
$3,507.340
|
$3,592.000
|
$4,078.900
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$330.000
|
$250.000
|
$405.000
|
$277.530
|
$326.040
|
$315.000
|
$357.700
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
67.000
|
$720.000
|
$720.000
|
$615.000
|
$615.000
|
$657.010
|
$615.000
|
$698.200
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$805.000
|
$750.000
|
$845.000
|
$845.000
|
$854.610
|
$845.000
|
$959.400
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
5.000
|
$950.000
|
$885.000
|
$950.000
|
$950.000
|
$958.340
|
$950.000
|
$1,079.100
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
1.000
|
$600.000
|
$400.000
|
$500.000
|
$200.000
|
$217.360
|
$225.000
|
$851.800
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
82.000
|
$113.000
|
$120.000
|
$107.000
|
$107.000
|
$108.680
|
$107.000
|
$121.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
43.000
|
$95.000
|
$85.000
|
$95.000
|
$95.000
|
$47.420
|
$95.000
|
$108.100
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
18.000
|
$40.000
|
$65.000
|
$24.400
|
$30.000
|
$29.640
|
$30.000
|
$33.900
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
1.000
|
$98.000
|
$65.000
|
$95.000
|
$95.000
|
$58.290
|
$95.000
|
$108.100
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
68.000
|
$50.000
|
$65.000
|
$15.000
|
$15.000
|
$34.580
|
$15.000
|
$17.200
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)R
|
EA
|
13.000
|
$50.000
|
$65.000
|
$15.000
|
$15.000
|
$34.580
|
$15.000
|
$17.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
6,746.000
|
$0.250
|
$0.350
|
$0.370
|
$0.370
|
$0.360
|
$0.370
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
14,547.000
|
$0.250
|
$0.350
|
$0.220
|
$0.220
|
$0.220
|
$0.220
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
3,141.000
|
$0.600
|
$0.400
|
$0.540
|
$0.540
|
$0.540
|
$0.540
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,102.000
|
$5.000
|
$5.000
|
$3.400
|
$3.400
|
$3.360
|
$3.400
|
$4.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
28.000
|
$150.000
|
$100.000
|
$130.000
|
$130.000
|
$128.440
|
$130.000
|
$147.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(UTURN ARW)
|
EA
|
1.000
|
$150.000
|
$110.000
|
$215.000
|
$215.000
|
$212.420
|
$215.000
|
$244.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
16.000
|
$150.000
|
$125.000
|
$130.000
|
$130.000
|
$128.440
|
$130.000
|
$147.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
710.000
|
$0.300
|
$0.350
|
$0.370
|
$0.370
|
$0.360
|
$0.370
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
4,996.000
|
$0.300
|
$0.350
|
$0.220
|
$0.220
|
$0.220
|
$0.220
|
$0.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
932.000
|
$1.500
|
$0.520
|
$1.000
|
$1.000
|
$3.230
|
$1.630
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
6,696.000
|
$1.500
|
$0.520
|
$1.000
|
$1.000
|
$3.270
|
$1.630
|
$1.500
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
47.000
|
$1.200
|
$2.500
|
$1.600
|
$1.600
|
$1.580
|
$1.600
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
9,052.000
|
$0.950
|
$0.950
|
$0.900
|
$0.900
|
$0.890
|
$0.900
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
112.000
|
$3.250
|
$2.500
|
$3.750
|
$3.750
|
$3.700
|
$3.750
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
4,556.000
|
$8.000
|
$5.000
|
$7.250
|
$7.250
|
$7.170
|
$7.250
|
$8.100
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
91.000
|
$150.000
|
$125.000
|
$130.000
|
$130.000
|
$128.440
|
$130.000
|
$147.500
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
2.000
|
$230.000
|
$135.000
|
$200.000
|
$200.000
|
$197.600
|
$200.000
|
$227.300
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
3.000
|
$470.000
|
$225.000
|
$250.000
|
$250.000
|
$247.000
|
$250.000
|
$283.900
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
65.000
|
$190.000
|
$135.000
|
$160.000
|
$160.000
|
$158.080
|
$160.000
|
$181.900
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
18.000
|
$53.000
|
$25.000
|
$57.000
|
$57.000
|
$56.320
|
$57.000
|
$64.700
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
128.000
|
$8.000
|
$5.000
|
$7.250
|
$7.250
|
$7.170
|
$7.250
|
$8.100
|
|
|
PAVEMENT SLER 6"
|
LF
|
46,573.000
|
$0.250
|
$0.200
|
$0.220
|
$0.220
|
$0.220
|
$0.220
|
$0.300
|
|
|
PAVEMENT SLER 8"
|
LF
|
9,052.000
|
$0.400
|
$0.350
|
$0.500
|
$0.500
|
$0.490
|
$0.500
|
$0.500
|
|
|
PAVEMENT SLER 12"
|
LF
|
112.000
|
$1.050
|
$2.000
|
$1.800
|
$1.800
|
$1.780
|
$1.800
|
$2.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
4,684.000
|
$2.500
|
$4.000
|
$2.600
|
$2.600
|
$2.560
|
$2.600
|
$3.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
91.000
|
$45.000
|
$50.000
|
$83.000
|
$82.500
|
$81.510
|
$82.500
|
$93.500
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
65.000
|
$45.000
|
$65.000
|
$95.000
|
$95.000
|
$93.860
|
$95.000
|
$108.100
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
2.000
|
$55.000
|
$60.000
|
$115.000
|
$115.000
|
$113.620
|
$115.000
|
$130.900
|
|
|
PAVEMENT SLER (LN REDUCT ARROW)
|
EA
|
3.000
|
$145.000
|
$125.000
|
$140.000
|
$140.000
|
$138.320
|
$140.000
|
$159.100
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
18.000
|
$20.000
|
$15.000
|
$32.000
|
$32.000
|
$31.620
|
$32.000
|
$36.400
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
7,969.000
|
$0.560
|
$0.850
|
$0.700
|
$0.700
|
$0.690
|
$0.700
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
30,399.000
|
$0.560
|
$0.850
|
$0.650
|
$0.650
|
$0.650
|
$0.650
|
$0.700
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,506.000
|
$0.560
|
$0.850
|
$0.700
|
$0.700
|
$0.690
|
$0.700
|
$1.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
6,652.000
|
$0.560
|
$0.850
|
$0.650
|
$0.650
|
$0.650
|
$0.650
|
$0.700
|
|
REFL PAV MRKR TY I-C
|
EA
|
530.000
|
$3.750
|
$5.000
|
$4.000
|
$4.000
|
$3.950
|
$4.000
|
$4.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,502.000
|
$3.750
|
$5.000
|
$4.000
|
$4.000
|
$3.950
|
$4.000
|
$4.600
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
625.000
|
$3.750
|
$5.000
|
$4.000
|
$4.000
|
$3.950
|
$4.000
|
$4.600
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
53.000
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$0.990
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
46,573.000
|
$0.250
|
$0.010
|
$0.020
|
$0.020
|
$0.020
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
9,052.000
|
$0.200
|
$0.020
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
112.000
|
$0.500
|
$0.030
|
$0.250
|
$0.250
|
$0.250
|
$0.250
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
4,684.000
|
$1.500
|
$0.060
|
$0.500
|
$0.500
|
$0.490
|
$0.500
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
97.000
|
$25.000
|
$1.000
|
$11.500
|
$11.500
|
$11.360
|
$11.500
|
$13.100
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
2.000
|
$25.000
|
$1.000
|
$16.500
|
$16.500
|
$16.310
|
$16.500
|
$18.700
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
65.000
|
$45.000
|
$1.000
|
$13.500
|
$13.500
|
$13.330
|
$13.500
|
$15.200
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
18.000
|
$10.500
|
$1.000
|
$5.500
|
$5.500
|
$5.430
|
$5.500
|
$6.100
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
2,657.000
|
$1.250
|
$1.000
|
$0.700
|
$0.700
|
$0.690
|
$0.700
|
$1.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
6.000
|
$150.000
|
$275.000
|
$200.000
|
$1,400.000
|
$1,383.180
|
$293.390
|
$1,589.800
|
|
|
INSTALL OF SIGNAL HEAD ASSM
|
EA
|
6.000
|
$600.000
|
$350.000
|
$1,685.000
|
$1,400.000
|
$1,383.180
|
$2,471.770
|
$1,589.800
|
|
|
LITTER REMOVAL
|
CYC
|
20.000
|
$2,500.000
|
$100.000
|
$250.000
|
$500.000
|
$873.180
|
$2,357.430
|
$875.500
|
|
|
DEBRIS REMOV-CNTR MED/MN LNS/RAMPS
|
CYC
|
20.000
|
$3,700.000
|
$1.000
|
$250.000
|
$500.000
|
$873.180
|
$2,357.430
|
$302.600
|
|
|
UNDERSEAL COURSE
|
GAL
|
28,414.000
|
$4.000
|
$0.010
|
$3.700
|
$3.750
|
$5.430
|
$4.620
|
$4.800
|
|
Totals: |
$4,814,213.780
|
$3,947,711.240
|
$4,889,950.625
|
$4,957,514.770
|
$5,210,369.715
|
$5,350,448.005
|
$5,691,168.210
|