PREPARING ROW
|
STA
|
1.000
|
$5,000.000
|
$50,000.000
|
$50,000.000
|
$6,231.610
|
$115,000.000
|
$9,000.000
|
$25,000.000
|
$5,000.000
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
1.000
|
$500.000
|
$750.000
|
$2,000.000
|
$720.680
|
$400.000
|
$1,000.000
|
$500.000
|
$1,500.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
3.000
|
$785.000
|
$950.000
|
$2,000.000
|
$2,162.040
|
$1,100.000
|
$2,000.000
|
$1,200.000
|
$2,500.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
70.000
|
$1.500
|
$20.740
|
$25.000
|
$42.350
|
$21.000
|
$25.000
|
$15.000
|
$50.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
700.000
|
$0.500
|
$5.000
|
$1.250
|
$1.480
|
$2.200
|
$1.500
|
$1.500
|
$250.000
|
|
|
VEGETATIVE WATERING
|
MG
|
11.000
|
$15.000
|
$50.000
|
$10.000
|
$223.950
|
$100.000
|
$140.000
|
$500.000
|
$200.000
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
300.000
|
$3.000
|
$10.000
|
$7.500
|
$9.150
|
$7.000
|
$7.000
|
$10.000
|
$10.000
|
|
|
AGGR (TY-B GR-5)
|
CY
|
11.000
|
$350.000
|
$150.000
|
$550.000
|
$635.930
|
$200.000
|
$110.000
|
$500.000
|
$300.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG70-22
|
TON
|
173.000
|
$95.000
|
$125.000
|
$205.000
|
$130.660
|
$125.000
|
$125.000
|
$210.000
|
$150.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
1,500.000
|
$3.000
|
$5.000
|
$4.500
|
$7.960
|
$8.000
|
$10.000
|
$6.000
|
$25.000
|
|
|
PLANE ASPH CONC PAV (2"-3")
|
SY
|
832.000
|
$6.000
|
$5.000
|
$5.000
|
$14.360
|
$9.500
|
$6.150
|
$9.000
|
$25.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
4.000
|
$500.000
|
$1,500.000
|
$1,100.000
|
$1,140.410
|
$2,000.000
|
$3,100.000
|
$1,600.000
|
$3,000.000
|
|
|
REINF CONC SLAB
|
SF
|
3,050.000
|
$45.000
|
$35.000
|
$45.000
|
$34.850
|
$50.000
|
$56.000
|
$48.000
|
$120.000
|
|
|
BLAST FINISH
|
SF
|
12,000.000
|
$28.000
|
$3.300
|
$3.500
|
$3.330
|
$3.250
|
$3.500
|
$2.000
|
$1.500
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
50.000
|
$200.000
|
$15.000
|
$140.000
|
$187.750
|
$120.000
|
$140.000
|
$160.000
|
$500.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
72.000
|
$200.000
|
$100.000
|
$200.000
|
$225.130
|
$190.000
|
$255.000
|
$210.000
|
$1,000.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
150.000
|
$300.000
|
$125.000
|
$170.000
|
$203.440
|
$130.000
|
$255.000
|
$180.000
|
$1,000.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
10.000
|
$450.000
|
$150.000
|
$155.000
|
$517.220
|
$85.000
|
$300.000
|
$160.000
|
$1,000.000
|
|
|
CONC STR REP (REMOVE AND REPL BM END)
|
CY
|
2.400
|
$10,000.000
|
$3,500.000
|
$11,000.000
|
$10,628.900
|
$7,000.000
|
$17,400.000
|
$12,000.000
|
$15,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
42.000
|
$435.000
|
$425.000
|
$450.000
|
$757.360
|
$525.000
|
$510.000
|
$680.000
|
$500.000
|
|
|
CONCRETE OVERLAY (2 IN)
|
SY
|
832.000
|
$90.000
|
$25.000
|
$135.000
|
$44.030
|
$85.000
|
$110.000
|
$32.000
|
$150.000
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
640.000
|
$20.000
|
$8.000
|
$35.000
|
$37.450
|
$30.000
|
$10.000
|
$30.000
|
$25.000
|
|
|
STR STEEL (SHEAR ANCHOR)
|
LB
|
4,002.000
|
$30.000
|
$8.000
|
$20.000
|
$17.560
|
$35.000
|
$55.000
|
$8.000
|
$15.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$500,000.000
|
$564,345.970
|
$650,000.000
|
$593,362.010
|
$823,000.000
|
$590,000.000
|
$1,150,000.000
|
$450,000.000
|
|
|
(PARAPET)
|
LF
|
20.000
|
$350.000
|
$200.000
|
$250.000
|
$1,096.980
|
$450.000
|
$896.000
|
$800.000
|
$1,000.000
|
|
|
ARMOR JOINT (MOD)
|
LF
|
48.000
|
$100.000
|
$100.000
|
$100.000
|
$195.290
|
$100.000
|
$100.000
|
$400.000
|
$200.000
|
|
|
PIPE (PVC) (SCH 40) (4 IN)
|
LF
|
178.000
|
$45.000
|
$15.000
|
$15.000
|
$37.800
|
$15.000
|
$90.000
|
$45.000
|
$20.000
|
|
|
MILLING CONCRETE SLAB (1/2 IN)
|
SY
|
832.000
|
$15.000
|
$5.000
|
$18.000
|
$29.540
|
$25.000
|
$18.500
|
$26.000
|
$25.000
|
|
|
SHOT BLASTING
|
SY
|
832.000
|
$15.000
|
$10.000
|
$25.000
|
$18.420
|
$18.000
|
$13.000
|
$32.000
|
$25.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
1.000
|
$50,000.000
|
$100,000.000
|
$80,000.000
|
$92,599.110
|
$90,000.000
|
$80,000.000
|
$350,000.000
|
$300,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$162,385.440
|
$150,000.000
|
$200,000.000
|
$345,082.060
|
$220,000.000
|
$222,000.000
|
$250,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$7,000.000
|
$6,500.000
|
$6,000.000
|
$1,326.000
|
$5,000.000
|
$4,700.000
|
$8,400.000
|
$3,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
20.000
|
$25.000
|
$33.000
|
$48.000
|
$45.160
|
$35.000
|
$53.000
|
$60.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
20.000
|
$9.000
|
$11.000
|
$43.000
|
$18.560
|
$11.000
|
$48.000
|
$60.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$16.000
|
$26.970
|
$12.500
|
$27.270
|
$27.000
|
$13.500
|
$45.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$9.000
|
$7.700
|
$9.000
|
$10.650
|
$9.000
|
$10.000
|
$45.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
125.000
|
$5.000
|
$5.500
|
$6.000
|
$5.830
|
$6.000
|
$7.000
|
$3.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
125.000
|
$1.000
|
$2.750
|
$3.000
|
$3.500
|
$2.000
|
$3.350
|
$2.000
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
700.000
|
$20.000
|
$22.990
|
$25.000
|
$26.090
|
$23.000
|
$24.000
|
$24.000
|
$20.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,900.000
|
$1,606.000
|
$1,400.000
|
$1,954.780
|
$1,600.000
|
$2,000.000
|
$2,100.000
|
$10,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
340.000
|
$3.000
|
$1.650
|
$1.500
|
$2.640
|
$2.000
|
$6.000
|
$3.000
|
$20.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$253.000
|
$137.500
|
$110.000
|
$234.530
|
$150.000
|
$170.000
|
$300.000
|
$1,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$3,003.000
|
$3,500.000
|
$3,218.280
|
$3,100.000
|
$3,000.000
|
$2,750.000
|
$10,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$280.000
|
$220.000
|
$125.000
|
$371.100
|
$300.000
|
$400.000
|
$400.000
|
$25,000.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
28.000
|
$40.000
|
$50.000
|
$31.000
|
$110.150
|
$50.000
|
$40.000
|
$20.000
|
$150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$600.000
|
$653.670
|
$590.000
|
$491.780
|
$700.000
|
$700.000
|
$560.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$100.000
|
$110.000
|
$140.000
|
$192.530
|
$125.000
|
$160.000
|
$200.000
|
$87.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$22.000
|
$11.000
|
$13.000
|
$35.360
|
$12.000
|
$20.000
|
$45.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
12.000
|
$22.000
|
$11.000
|
$14.000
|
$35.360
|
$12.000
|
$20.000
|
$100.000
|
$26.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$60.000
|
$47.300
|
$55.000
|
$92.780
|
$48.000
|
$65.000
|
$100.000
|
$115.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
3.000
|
$15.000
|
$16.500
|
$15.000
|
$39.020
|
$16.000
|
$20.000
|
$40.000
|
$20.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
3,900.000
|
$0.250
|
$0.820
|
$0.760
|
$1.020
|
$0.850
|
$0.850
|
$1.000
|
$1.430
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,950.000
|
$0.500
|
$1.650
|
$1.510
|
$2.050
|
$1.650
|
$1.700
|
$7.000
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,950.000
|
$0.500
|
$1.650
|
$1.510
|
$2.050
|
$1.650
|
$1.700
|
$7.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
25.000
|
$2.900
|
$55.000
|
$51.000
|
$70.700
|
$55.000
|
$60.000
|
$10.000
|
$11.000
|
|
|
REPAIR (STL POST RETROFIT)
|
EA
|
2.000
|
$2,500.000
|
$1,500.000
|
$1,250.000
|
$1,677.320
|
$3,000.000
|
$6,800.000
|
$1,800.000
|
$3,500.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
50.000
|
$300.000
|
$150.000
|
$130.000
|
$326.190
|
$175.000
|
$330.000
|
$400.000
|
$500.000
|
|
|
CONCRETE POST REPAIR
|
EA
|
5.000
|
$1,000.000
|
$1,200.000
|
$1,300.000
|
$977.600
|
$1,400.000
|
$1,800.000
|
$280.000
|
$5,000.000
|
|
|
CONCRETE POST REPLACEMENT
|
EA
|
3.000
|
$2,000.000
|
$1,750.000
|
$1,100.000
|
$3,034.630
|
$1,700.000
|
$5,500.000
|
$2,500.000
|
$5,000.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
161.000
|
$40.000
|
$20.000
|
$65.000
|
$148.740
|
$25.000
|
$68.000
|
$140.000
|
$300.000
|
|
|
REP STL BRIDGE MEMBER (TRUSS VERTICAL)
|
EA
|
8.000
|
$20,000.000
|
$2,500.000
|
$4,500.000
|
$8,865.730
|
$7,000.000
|
$9,600.000
|
$4,200.000
|
$6,000.000
|
|
|
REP STL BRIDGE MEMBER (TRUSS DIAGONAL)
|
EA
|
4.000
|
$3,000.000
|
$2,500.000
|
$4,500.000
|
$7,702.130
|
$1,400.000
|
$6,000.000
|
$8,000.000
|
$6,000.000
|
|
|
REP STL BRIDGE MEMBER (BENT SWAY BRACE)
|
EA
|
4.000
|
$5,000.000
|
$2,800.000
|
$9,500.000
|
$7,702.130
|
$5,700.000
|
$4,800.000
|
$6,000.000
|
$8,000.000
|
|
|
REP STL BRIDGE MEMBER (BEARINGS)
|
EA
|
60.000
|
$1,500.000
|
$600.000
|
$1,750.000
|
$2,258.030
|
$1,800.000
|
$2,500.000
|
$1,800.000
|
$1,600.000
|
|
|
REP STL BRDG MEMB (TRUSS PORTAL BRACE)
|
EA
|
2.000
|
$8,000.000
|
$2,500.000
|
$10,000.000
|
$8,367.130
|
$9,200.000
|
$8,500.000
|
$8,500.000
|
$12,000.000
|
|
|
REP STL BRIDGE MEMBER(REPL RIVET/BOLT)
|
EA
|
40.000
|
$200.000
|
$1,200.000
|
$1,000.000
|
$292.300
|
$65.000
|
$110.000
|
$240.000
|
$200.000
|
|
|
REP STL BRIDGE MEMBER(LATERAL BRACING)
|
EA
|
1.000
|
$1,000.000
|
$2,500.000
|
$9,000.000
|
$6,505.130
|
$5,600.000
|
$5,000.000
|
$600.000
|
$8,000.000
|
|
|
REPR STL BRG MEMBER (VERTICAL)(TY I)
|
EA
|
2.000
|
$2,000.000
|
$2,500.000
|
$7,000.000
|
$17,399.260
|
$900.000
|
$20,000.000
|
$3,400.000
|
$10,000.000
|
|
|
REPR STL BRG MEMBER (VERTICAL)(TY II)
|
EA
|
1.000
|
$10,000.000
|
$2,500.000
|
$4,800.000
|
$16,069.260
|
$3,000.000
|
$20,000.000
|
$24,000.000
|
$10,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$150.000
|
$200.000
|
$250.000
|
$258.050
|
$300.000
|
$275.000
|
$240.000
|
$500.000
|
|
Totals: |
$2,058,726.940
|
$1,479,046.420
|
$2,010,250.000
|
$2,081,246.050
|
$2,221,349.000
|
$2,223,292.550
|
$2,777,299.000
|
$2,915,822.000
|