|
|
PREPARING ROW
|
AC
|
0.250
|
$6,101.010
|
$15,200.000
|
$15,000.000
|
$16,650.000
|
$10,500.000
|
$6,000.000
|
$34,906.760
|
$7,750.000
|
$15,000.000
|
$10,300.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
100.000
|
$12.480
|
$12.000
|
$8.000
|
$9.990
|
$9.000
|
$48.000
|
$14.180
|
$26.200
|
$20.000
|
$18.103
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
6,490.000
|
$8.260
|
$8.000
|
$7.000
|
$5.610
|
$7.700
|
$10.000
|
$5.790
|
$7.000
|
$7.000
|
$10.085
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
4,267.000
|
$2.100
|
$1.000
|
$1.050
|
$2.330
|
$1.500
|
$2.520
|
$1.690
|
$2.140
|
$0.990
|
$2.916
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
14.000
|
$4.070
|
$217.000
|
$50.000
|
$73.260
|
$5.000
|
$289.900
|
$39.960
|
$22.930
|
$1.600
|
$138.126
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,001.000
|
$7.250
|
$16.960
|
$27.000
|
$12.270
|
$9.000
|
$9.650
|
$20.700
|
$16.000
|
$23.000
|
$8.349
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
349.000
|
$15.460
|
$19.680
|
$57.000
|
$13.140
|
$15.000
|
$15.860
|
$14.110
|
$51.200
|
$25.000
|
$21.800
|
|
|
BACKFILL (TY B)
|
STA
|
938.070
|
$177.500
|
$86.310
|
$100.000
|
$85.800
|
$140.000
|
$199.610
|
$126.900
|
$60.000
|
$150.000
|
$104.564
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
6,058.000
|
$2.620
|
$2.500
|
$3.150
|
$2.500
|
$1.500
|
$2.770
|
$1.940
|
$1.340
|
$4.000
|
$2.575
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
6,058.000
|
$0.140
|
$0.150
|
$0.150
|
$0.150
|
$0.350
|
$0.170
|
$0.320
|
$0.320
|
$0.250
|
$0.155
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
6,058.000
|
$0.130
|
$0.080
|
$0.080
|
$0.080
|
$0.310
|
$0.090
|
$0.290
|
$0.290
|
$0.250
|
$0.155
|
|
|
VEGETATIVE WATERING
|
MG
|
283.000
|
$23.660
|
$40.000
|
$15.000
|
$16.650
|
$42.000
|
$8.870
|
$38.630
|
$48.750
|
$16.000
|
$24.114
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY G)
|
SY
|
5,255.000
|
$4.260
|
$3.950
|
$3.950
|
$3.950
|
$4.250
|
$4.380
|
$4.250
|
$4.250
|
$4.000
|
$4.069
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
9.000
|
$78.600
|
$100.000
|
$125.000
|
$211.810
|
$100.000
|
$458.450
|
$559.230
|
$131.000
|
$175.000
|
$230.010
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
9.000
|
$99.440
|
$100.000
|
$125.000
|
$211.810
|
$100.000
|
$458.450
|
$559.230
|
$125.000
|
$175.000
|
$230.010
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
638.000
|
$3.750
|
$14.750
|
$5.250
|
$9.900
|
$4.000
|
$3.880
|
$5.370
|
$4.930
|
$5.000
|
$5.806
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
262.000
|
$95.110
|
$83.230
|
$83.000
|
$72.330
|
$75.000
|
$91.080
|
$57.520
|
$93.000
|
$67.000
|
$100.371
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
5,437.000
|
$86.470
|
$54.150
|
$71.000
|
$82.830
|
$70.000
|
$76.200
|
$66.980
|
$76.000
|
$85.000
|
$89.154
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
54,191.000
|
$47.810
|
$32.967
|
$37.000
|
$34.440
|
$40.000
|
$37.810
|
$42.000
|
$44.500
|
$39.000
|
$36.049
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
1,601.000
|
$25.720
|
$21.100
|
$26.000
|
$22.590
|
$25.000
|
$22.840
|
$34.000
|
$24.000
|
$20.000
|
$37.419
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
4,719.000
|
$3.350
|
$1.300
|
$3.500
|
$2.010
|
$1.350
|
$1.540
|
$3.000
|
$3.480
|
$2.000
|
$4.074
|
|
|
PLANE ASPH CONC PAV(MICRO-MLLING)(1")
|
SY
|
245,716.000
|
$2.000
|
$0.680
|
$0.500
|
$0.960
|
$0.800
|
$0.980
|
$0.900
|
$0.950
|
$0.500
|
$1.283
|
|
|
PLANE ASPH CONC PAV(MICRO-MLLING)(2")
|
SY
|
242,318.000
|
$2.000
|
$0.910
|
$0.500
|
$1.280
|
$0.850
|
$1.850
|
$1.250
|
$1.170
|
$1.000
|
$1.615
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
720.000
|
$13.110
|
$20.000
|
$16.000
|
$16.000
|
$21.000
|
$28.830
|
$16.000
|
$18.000
|
$19.000
|
$20.600
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
42.400
|
$372.520
|
$485.000
|
$375.000
|
$400.000
|
$400.000
|
$460.200
|
$422.630
|
$410.000
|
$590.000
|
$481.500
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
399.500
|
$136.780
|
$125.000
|
$150.000
|
$126.000
|
$160.000
|
$277.230
|
$150.000
|
$200.000
|
$200.000
|
$153.488
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
557.100
|
$487.280
|
$445.000
|
$395.000
|
$412.000
|
$420.000
|
$499.020
|
$427.620
|
$395.000
|
$600.000
|
$481.500
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
886.000
|
$24.190
|
$11.000
|
$8.000
|
$8.000
|
$12.000
|
$8.930
|
$8.000
|
$9.000
|
$11.000
|
$11.330
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
102.000
|
$400.000
|
$380.000
|
$360.000
|
$360.000
|
$410.000
|
$648.720
|
$360.000
|
$370.000
|
$365.000
|
$391.400
|
|
|
JOINT SEALANT
|
LF
|
886.000
|
$14.690
|
$15.000
|
$12.000
|
$12.000
|
$16.500
|
$16.630
|
$12.000
|
$13.000
|
$15.000
|
$15.450
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
8.000
|
$165.870
|
$80.000
|
$225.000
|
$240.000
|
$240.000
|
$127.530
|
$174.050
|
$350.000
|
$125.000
|
$334.420
|
|
|
SET (TY II) (DES 4) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$2,458.570
|
$4,500.000
|
$2,450.000
|
$2,500.000
|
$2,600.000
|
$3,604.000
|
$1,520.930
|
$3,060.000
|
$2,500.000
|
$3,959.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
16.000
|
$1,250.000
|
$500.000
|
$525.000
|
$1,700.000
|
$450.000
|
$1,663.390
|
$634.350
|
$500.000
|
$2,250.000
|
$1,605.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$1,846.140
|
$1,500.000
|
$2,000.000
|
$2,000.000
|
$2,200.000
|
$2,772.310
|
$1,675.240
|
$7,950.000
|
$3,500.000
|
$2,675.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,063.500
|
$1,500.000
|
$1,000.000
|
$2,181.280
|
$1,100.000
|
$2,772.310
|
$294.240
|
$1,350.000
|
$3,000.000
|
$1,177.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
245.000
|
$3.000
|
$8.000
|
$10.000
|
$7.350
|
$10.000
|
$19.960
|
$2.980
|
$60.000
|
$10.000
|
$8.560
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,200,000.000
|
$240,217.000
|
$345,000.000
|
$665,000.000
|
$700,000.000
|
$400,000.000
|
$1,028,373.180
|
$208,000.000
|
$1,000,000.000
|
$1,224,333.685
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$7,436.970
|
$2,400.000
|
$4,500.000
|
$2,800.000
|
$10,000.000
|
$1,219.820
|
$4,500.000
|
$20,000.000
|
$5,000.000
|
$5,893.297
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
344.000
|
$3.810
|
$3.500
|
$4.000
|
$3.950
|
$6.300
|
$4.380
|
$6.650
|
$6.650
|
$6.000
|
$4.069
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
6,793.000
|
$6.020
|
$4.100
|
$4.500
|
$4.450
|
$5.500
|
$4.930
|
$5.370
|
$5.370
|
$6.500
|
$4.584
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
7,137.000
|
$1.300
|
$0.600
|
$0.500
|
$1.250
|
$0.500
|
$1.390
|
$0.460
|
$0.460
|
$2.500
|
$1.277
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
736.000
|
$70.140
|
$30.000
|
$90.000
|
$96.900
|
$70.000
|
$166.340
|
$33.920
|
$54.000
|
$55.000
|
$45.786
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
170,242.000
|
$0.210
|
$0.065
|
$0.230
|
$0.120
|
$0.110
|
$0.130
|
$0.100
|
$0.180
|
$0.150
|
$0.144
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
6,162.500
|
$21.340
|
$23.750
|
$20.550
|
$20.550
|
$22.000
|
$21.510
|
$20.550
|
$21.000
|
$28.000
|
$21.167
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$1,512.520
|
$2,050.000
|
$1,711.000
|
$1,711.000
|
$1,650.000
|
$1,929.530
|
$1,610.000
|
$1,750.000
|
$2,200.000
|
$2,190.330
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
2.000
|
$1,418.560
|
$2,300.000
|
$1,219.000
|
$1,219.000
|
$900.000
|
$1,164.370
|
$1,050.000
|
$1,250.000
|
$2,500.000
|
$1,255.570
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
13.000
|
$1,266.450
|
$525.000
|
$1,230.000
|
$1,230.000
|
$1,200.000
|
$1,375.060
|
$1,170.000
|
$1,260.000
|
$1,800.000
|
$1,266.900
|
|
|
CONNECTOR PLATE FOR THRIE BEAM
|
EA
|
4.000
|
$321.540
|
$375.000
|
$1,155.000
|
$1,155.000
|
$800.000
|
$720.800
|
$650.000
|
$1,180.000
|
$1,400.000
|
$1,189.650
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,750.000
|
$1.540
|
$1.000
|
$1.000
|
$1.000
|
$1.900
|
$1.000
|
$0.950
|
$1.050
|
$3.500
|
$1.030
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$197.700
|
$295.000
|
$195.000
|
$195.000
|
$160.000
|
$194.060
|
$175.000
|
$199.000
|
$500.000
|
$200.850
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$280.860
|
$295.000
|
$175.000
|
$175.000
|
$210.000
|
$155.250
|
$210.000
|
$179.000
|
$450.000
|
$180.250
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
5,026.000
|
$10.000
|
$12.500
|
$12.500
|
$12.500
|
$15.000
|
$13.310
|
$10.300
|
$12.750
|
$21.000
|
$12.875
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
6.000
|
$4,000.000
|
$2,375.000
|
$2,375.000
|
$2,375.000
|
$2,600.000
|
$3,326.770
|
$2,715.000
|
$2,425.000
|
$4,000.000
|
$2,446.250
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$2,694.820
|
$2,825.000
|
$2,476.000
|
$2,476.000
|
$2,600.000
|
$2,694.680
|
$2,645.000
|
$2,530.000
|
$3,000.000
|
$2,550.280
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
18.000
|
$200.000
|
$250.000
|
$175.000
|
$175.000
|
$210.000
|
$216.240
|
$275.000
|
$179.000
|
$500.000
|
$180.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
247.000
|
$482.460
|
$495.000
|
$526.000
|
$526.000
|
$550.000
|
$583.290
|
$405.000
|
$526.000
|
$600.000
|
$541.780
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
12.000
|
$747.180
|
$400.000
|
$594.000
|
$594.000
|
$620.000
|
$658.700
|
$530.000
|
$594.000
|
$675.000
|
$611.820
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
121.000
|
$504.850
|
$480.000
|
$597.000
|
$597.000
|
$625.000
|
$662.030
|
$480.000
|
$597.000
|
$700.000
|
$614.910
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$709.180
|
$600.000
|
$672.000
|
$672.000
|
$700.000
|
$745.190
|
$810.000
|
$672.000
|
$1,300.000
|
$692.160
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
69.000
|
$729.660
|
$525.000
|
$754.000
|
$754.000
|
$800.000
|
$836.130
|
$810.000
|
$754.000
|
$1,000.000
|
$776.620
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$928.650
|
$480.000
|
$905.000
|
$905.000
|
$950.000
|
$1,003.580
|
$990.000
|
$905.000
|
$1,250.000
|
$932.150
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
374.000
|
$90.170
|
$65.000
|
$83.000
|
$83.000
|
$88.000
|
$92.040
|
$90.000
|
$83.000
|
$200.000
|
$85.490
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
39.000
|
$24.180
|
$31.500
|
$17.000
|
$17.000
|
$18.000
|
$18.850
|
$20.000
|
$17.000
|
$20.000
|
$17.510
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
107.000
|
$34.830
|
$42.000
|
$21.000
|
$21.000
|
$22.000
|
$23.290
|
$35.000
|
$21.000
|
$30.000
|
$21.630
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF
|
EA
|
68.000
|
$164.140
|
$42.000
|
$75.000
|
$75.000
|
$80.000
|
$83.170
|
$90.000
|
$75.000
|
$100.000
|
$77.250
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
7,340.000
|
$0.550
|
$0.010
|
$1.000
|
$0.400
|
$1.100
|
$1.110
|
$1.350
|
$1.000
|
$0.500
|
$1.030
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
12,658.000
|
$0.480
|
$0.010
|
$0.750
|
$0.400
|
$1.100
|
$0.940
|
$1.150
|
$0.850
|
$0.500
|
$1.030
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
20,240.000
|
$1.750
|
$0.010
|
$1.000
|
$0.450
|
$1.350
|
$1.110
|
$1.350
|
$1.000
|
$1.000
|
$1.329
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
89,926.000
|
$1.800
|
$0.010
|
$1.450
|
$0.450
|
$1.350
|
$1.660
|
$1.120
|
$1.500
|
$1.450
|
$1.329
|
|
|
WK ZN PAV MRK REMOV (W)8"(LNDP)
|
LF
|
188.000
|
$1.500
|
$0.010
|
$2.500
|
$1.000
|
$2.100
|
$2.770
|
$2.600
|
$2.500
|
$2.500
|
$2.060
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
17,249.000
|
$1.220
|
$0.010
|
$2.000
|
$1.000
|
$1.600
|
$2.220
|
$2.300
|
$2.000
|
$2.000
|
$1.545
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
3,109.000
|
$5.790
|
$0.010
|
$7.000
|
$4.500
|
$6.500
|
$7.760
|
$6.550
|
$7.000
|
$7.000
|
$6.180
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
187.000
|
$168.700
|
$0.010
|
$250.000
|
$90.000
|
$160.000
|
$277.230
|
$210.000
|
$250.000
|
$250.000
|
$154.500
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
142.000
|
$215.420
|
$0.010
|
$250.000
|
$90.000
|
$160.000
|
$277.230
|
$230.000
|
$250.000
|
$250.000
|
$154.500
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
353.000
|
$28.990
|
$0.010
|
$50.000
|
$18.000
|
$46.000
|
$55.450
|
$24.000
|
$50.000
|
$50.000
|
$45.320
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
2,590.000
|
$0.730
|
$0.010
|
$1.000
|
$0.400
|
$1.050
|
$1.110
|
$1.300
|
$1.000
|
$1.000
|
$1.030
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
29,290.000
|
$0.490
|
$0.010
|
$0.750
|
$0.400
|
$1.050
|
$0.940
|
$1.140
|
$0.850
|
$0.750
|
$1.030
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
88,236.000
|
$1.490
|
$0.010
|
$1.450
|
$0.450
|
$1.350
|
$1.660
|
$1.200
|
$1.500
|
$1.450
|
$1.329
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
8,525.000
|
$1.360
|
$1.000
|
$0.800
|
$2.000
|
$1.250
|
$1.110
|
$0.810
|
$1.050
|
$0.500
|
$1.384
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,790.000
|
$1.130
|
$1.000
|
$0.800
|
$2.000
|
$1.250
|
$1.110
|
$0.510
|
$1.050
|
$0.500
|
$1.384
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
176.000
|
$0.640
|
$0.850
|
$1.500
|
$0.970
|
$1.050
|
$1.660
|
$0.850
|
$1.500
|
$1.500
|
$1.030
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
17,177.000
|
$0.720
|
$0.850
|
$0.750
|
$0.870
|
$0.850
|
$0.830
|
$0.850
|
$0.750
|
$0.750
|
$0.824
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
3,079.000
|
$5.430
|
$5.000
|
$7.000
|
$5.110
|
$7.350
|
$7.760
|
$4.000
|
$7.000
|
$7.000
|
$7.210
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
170.000
|
$133.980
|
$90.000
|
$125.000
|
$91.950
|
$210.000
|
$138.620
|
$95.000
|
$125.000
|
$125.000
|
$206.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
126.000
|
$156.130
|
$115.000
|
$150.000
|
$117.490
|
$210.000
|
$166.340
|
$95.000
|
$150.000
|
$150.000
|
$206.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
322.000
|
$33.860
|
$20.000
|
$50.000
|
$20.430
|
$53.000
|
$55.450
|
$24.000
|
$50.000
|
$50.000
|
$51.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
51,718.000
|
$0.110
|
$0.150
|
$0.150
|
$0.180
|
$0.160
|
$0.170
|
$0.090
|
$0.150
|
$0.150
|
$0.155
|
|
|
PAVEMENT SEALER 6"
|
LF
|
195,836.000
|
$0.190
|
$0.210
|
$0.200
|
$0.210
|
$0.230
|
$0.220
|
$0.140
|
$0.200
|
$0.200
|
$0.227
|
|
|
PAVEMENT SEALER 8"
|
LF
|
17,353.000
|
$0.370
|
$0.300
|
$0.250
|
$0.360
|
$0.460
|
$0.280
|
$0.180
|
$0.250
|
$0.250
|
$0.453
|
|
|
PAVEMENT SEALER 24"
|
LF
|
3,079.000
|
$2.110
|
$3.000
|
$1.000
|
$3.070
|
$3.000
|
$1.110
|
$2.240
|
$1.000
|
$1.000
|
$2.966
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
170.000
|
$51.900
|
$65.000
|
$20.000
|
$66.410
|
$80.000
|
$22.180
|
$45.000
|
$20.000
|
$20.000
|
$77.250
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
126.000
|
$54.360
|
$65.000
|
$25.000
|
$66.410
|
$80.000
|
$27.720
|
$45.000
|
$25.000
|
$25.000
|
$77.250
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
322.000
|
$5.890
|
$15.000
|
$10.000
|
$15.330
|
$35.000
|
$11.090
|
$11.000
|
$10.000
|
$10.000
|
$33.990
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
7,180.000
|
$0.380
|
$0.300
|
$0.400
|
$0.360
|
$0.480
|
$0.500
|
$0.440
|
$0.450
|
$0.400
|
$0.464
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
12,658.000
|
$0.330
|
$0.300
|
$0.300
|
$0.360
|
$0.430
|
$0.390
|
$0.450
|
$0.350
|
$0.300
|
$0.412
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
20,060.000
|
$0.520
|
$0.360
|
$0.500
|
$0.410
|
$0.580
|
$0.610
|
$0.620
|
$0.550
|
$0.500
|
$0.567
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
88,977.000
|
$0.550
|
$0.360
|
$0.450
|
$0.410
|
$0.580
|
$0.550
|
$0.620
|
$0.500
|
$0.450
|
$0.567
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,590.000
|
$0.410
|
$0.300
|
$0.400
|
$0.360
|
$0.480
|
$0.500
|
$0.450
|
$0.450
|
$0.400
|
$0.464
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
29,290.000
|
$0.330
|
$0.300
|
$0.300
|
$0.360
|
$0.430
|
$0.390
|
$0.450
|
$0.350
|
$0.300
|
$0.412
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
86,799.000
|
$0.580
|
$0.360
|
$0.450
|
$0.410
|
$0.580
|
$0.550
|
$0.620
|
$0.500
|
$0.450
|
$0.567
|
|
REFL PAV MRKR TY I-C
|
EA
|
476.000
|
$3.540
|
$3.000
|
$4.500
|
$3.070
|
$4.200
|
$4.990
|
$4.200
|
$4.500
|
$4.500
|
$4.120
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,091.000
|
$2.870
|
$3.000
|
$4.000
|
$3.070
|
$4.000
|
$4.440
|
$4.200
|
$4.000
|
$4.000
|
$3.883
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,877.000
|
$3.340
|
$3.000
|
$4.000
|
$3.070
|
$4.000
|
$4.440
|
$4.200
|
$4.000
|
$4.000
|
$3.883
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$3,000.000
|
$1,500.000
|
$1,500.000
|
$1,588.440
|
$2,400.000
|
$5,544.620
|
$3,172.680
|
$24,700.000
|
$7,000.000
|
$5,350.000
|
|
|
LITTER REMOVAL
|
CYC
|
18.000
|
$2,000.000
|
$350.000
|
$800.000
|
$1,469.190
|
$2,100.000
|
$2,295.470
|
$900.640
|
$4,920.000
|
$6,000.000
|
$2,247.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
18.000
|
$2,000.000
|
$1,000.000
|
$850.000
|
$1,500.000
|
$600.000
|
$1,108.920
|
$1,576.220
|
$1,000.000
|
$6,000.000
|
$1,819.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
54,502.000
|
$79.630
|
$67.114
|
$70.000
|
$70.560
|
$69.000
|
$74.020
|
$72.500
|
$76.500
|
$78.000
|
$79.513
|
|
|
UNDERSEAL COURSE
|
GAL
|
100,729.000
|
$3.480
|
$2.770
|
$2.800
|
$2.960
|
$2.500
|
$2.380
|
$3.100
|
$2.900
|
$2.000
|
$3.486
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
466.000
|
$73.220
|
$50.000
|
$50.000
|
$60.000
|
$90.000
|
$83.170
|
$53.340
|
$64.000
|
$100.000
|
$85.600
|
|
|
TMA (STATIONARY)
|
DAY
|
203.000
|
$147.360
|
$100.000
|
$150.000
|
$227.710
|
$170.000
|
$180.750
|
$235.200
|
$305.000
|
$329.000
|
$214.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
84.000
|
$113.480
|
$150.000
|
$150.000
|
$303.610
|
$200.000
|
$196.280
|
$492.530
|
$400.000
|
$329.000
|
$535.000
|
|
Totals: |
$12,566,158.424
|
$8,387,879.072
|
$9,473,636.775
|
$9,754,268.781
|
$10,322,598.110
|
$10,726,061.225
|
$10,824,980.852
|
$10,980,675.660
|
$11,518,530.930
|
$11,753,647.587
|