PREPARING ROW
|
STA
|
5.000
|
$2,500.000
|
$15,000.000
|
$1,080.000
|
$7,500.000
|
$5,000.000
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
8,535.000
|
$20.000
|
$15.000
|
$5.400
|
$7.500
|
$5.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
183.000
|
$64.570
|
$30.000
|
$108.000
|
$20.000
|
$50.000
|
|
|
REMOV CONC (RIPRAP)
|
CY
|
9.000
|
$100.000
|
$200.000
|
$242.000
|
$75.000
|
$500.000
|
|
|
REMOV CONC (CURB)
|
LF
|
60.000
|
$12.000
|
$50.000
|
$44.000
|
$10.000
|
$15.000
|
|
|
REMOV CONC (SAWCUT)
|
LF
|
184.000
|
$60.000
|
$15.000
|
$16.200
|
$10.000
|
$7.000
|
|
|
REMOV CONC (ABUTMENT BACKWALL)
|
CY
|
3.000
|
$1,650.000
|
$2,000.000
|
$1,080.000
|
$100.000
|
$2,000.000
|
|
|
REMOV CONC (RAIL)
|
LF
|
299.000
|
$50.000
|
$50.000
|
$86.400
|
$25.000
|
$50.000
|
|
|
RMV (9") TRT/UNTRT BASE & ASPH PAV
|
SY
|
107.000
|
$40.000
|
$20.000
|
$44.000
|
$20.000
|
$30.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
1,947.000
|
$30.000
|
$35.000
|
$65.000
|
$20.000
|
$75.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
1,540.000
|
$70.000
|
$35.000
|
$86.000
|
$20.000
|
$75.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
2,071.000
|
$60.000
|
$75.000
|
$75.000
|
$20.000
|
$145.000
|
|
|
FURN & PLACE TOPSOIL (6")
|
SY
|
8,029.000
|
$2.000
|
$8.000
|
$11.000
|
$10.000
|
$5.000
|
|
|
BROADCAST SEED (PERM_URBAN_CLAY)
|
SY
|
8,029.000
|
$0.300
|
$0.600
|
$0.100
|
$2.000
|
$1.250
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
|
SY
|
8,029.000
|
$8.000
|
$3.000
|
$1.000
|
$15.000
|
$1.750
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
9.000
|
$175.000
|
$350.000
|
$432.000
|
$250.000
|
$3,000.000
|
|
|
D-GR HMA TY-C SAC-B PG70-22
|
TON
|
36.000
|
$175.000
|
$350.000
|
$324.000
|
$250.000
|
$775.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,963.000
|
$40.000
|
$30.000
|
$1.000
|
$100.000
|
$100.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
5.000
|
$1,651.750
|
$3,075.000
|
$2,160.000
|
$1,000.000
|
$6,000.000
|
|
|
CL C CONC (CAP)(EXTEND)
|
CY
|
52.000
|
$3,000.000
|
$1,950.000
|
$1,080.000
|
$2,500.000
|
$15,000.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
9.000
|
$1,500.000
|
$350.000
|
$432.000
|
$325.000
|
$900.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
335.000
|
$155.590
|
$275.000
|
$275.000
|
$330.000
|
$400.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
49.000
|
$677.500
|
$350.000
|
$540.000
|
$350.000
|
$1,000.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
233.000
|
$290.710
|
$275.000
|
$232.000
|
$275.000
|
$450.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
19.000
|
$2,000.000
|
$350.000
|
$262.000
|
$275.000
|
$850.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
22.000
|
$700.000
|
$525.000
|
$756.000
|
$850.000
|
$1,000.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
99.000
|
$1,000.000
|
$525.000
|
$648.000
|
$850.000
|
$900.000
|
|
|
RIPRAP (CONC) (CL B) (4 IN)
|
CY
|
3.000
|
$1,265.960
|
$900.000
|
$648.000
|
$850.000
|
$1,800.000
|
|
|
RIPRAP (CONC) (CL B) (6 IN)
|
CY
|
6.000
|
$1,250.000
|
$800.000
|
$972.000
|
$1,000.000
|
$1,500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
643.000
|
$700.000
|
$515.000
|
$648.000
|
$750.000
|
$750.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
315.000
|
$250.000
|
$195.000
|
$216.000
|
$325.000
|
$350.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
374.000
|
$300.000
|
$195.000
|
$216.000
|
$350.000
|
$350.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
171.000
|
$350.000
|
$195.000
|
$400.000
|
$250.000
|
$500.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
48.000
|
$236.630
|
$195.000
|
$270.000
|
$300.000
|
$350.000
|
|
|
ELASTOMERIC BEARING (EE1)
|
EA
|
13.000
|
$6,135.000
|
$4,500.000
|
$8,640.000
|
$2,500.000
|
$12,000.000
|
|
|
STR STEEL (MISC NON-BRIDGE)
|
LB
|
1,120.000
|
$27.070
|
$35.000
|
$44.000
|
$25.000
|
$25.000
|
|
|
STR STEEL (PEDESTAL)
|
LB
|
15.000
|
$36.000
|
$300.000
|
$108.000
|
$250.000
|
$400.000
|
|
|
RAIL (TY T2P)
|
LF
|
4,647.000
|
$225.000
|
$300.000
|
$324.000
|
$200.000
|
$375.000
|
|
|
RAIL (TY T221)
|
LF
|
14.000
|
$169.000
|
$600.000
|
$864.000
|
$200.000
|
$450.000
|
|
|
RAIL (TY T223)
|
LF
|
55.000
|
$231.160
|
$600.000
|
$756.000
|
$200.000
|
$225.000
|
|
|
RAIL (TY SSTR)
|
LF
|
136.000
|
$250.000
|
$600.000
|
$540.000
|
$200.000
|
$175.000
|
|
|
RAIL (TY C223)
|
LF
|
128.000
|
$231.160
|
$600.000
|
$540.000
|
$200.000
|
$400.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
364.000
|
$300.000
|
$250.000
|
$162.000
|
$350.000
|
$350.000
|
|
|
RAISING EXIST STRUCT
|
EA
|
3.000
|
$17,500.000
|
$75,000.000
|
$21,600.000
|
$30,000.000
|
$135,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$3,357.300
|
$4,500.000
|
$2,160.000
|
$1,000.000
|
$5,000.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
4,464.000
|
$111.670
|
$25.000
|
$13.000
|
$10.000
|
$12.000
|
|
|
REMOVE STR (GABION)
|
LF
|
253.000
|
$80.000
|
$50.000
|
$22.000
|
$50.000
|
$25.000
|
|
|
ADJUST STL SHOES
|
EA
|
1.000
|
$12,766.670
|
$8,500.000
|
$8,640.000
|
$500.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$811,490.000
|
$700,000.000
|
$605,000.000
|
$885,000.000
|
$1,800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$5,000.000
|
$8,500.000
|
$1.000
|
$12,000.000
|
$53,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
131.000
|
$60.000
|
$55.000
|
$10.000
|
$55.000
|
$75.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
146.000
|
$100.000
|
$80.000
|
$10.000
|
$70.000
|
$100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
277.000
|
$20.000
|
$15.000
|
$5.000
|
$20.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
587.000
|
$40.000
|
$30.000
|
$1.000
|
$40.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
587.000
|
$15.000
|
$15.000
|
$1.000
|
$10.000
|
$25.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,069.000
|
$5.000
|
$10.000
|
$2.000
|
$10.000
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,069.000
|
$2.000
|
$4.000
|
$1.000
|
$2.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
115.000
|
$8.000
|
$12.000
|
$10.000
|
$20.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
115.000
|
$4.000
|
$5.000
|
$5.000
|
$5.000
|
$1.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
6,470.000
|
$72.000
|
$40.000
|
$97.000
|
$100.000
|
$75.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,990.000
|
$70.000
|
$30.000
|
$97.000
|
$100.000
|
$30.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
240.000
|
$75.000
|
$30.000
|
$108.000
|
$100.000
|
$30.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
29,620.000
|
$16.000
|
$15.000
|
$16.000
|
$40.000
|
$16.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
2,053.000
|
$15.000
|
$15.000
|
$22.000
|
$20.000
|
$15.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
420.000
|
$20.000
|
$15.000
|
$22.000
|
$20.000
|
$19.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
29,570.000
|
$19.750
|
$18.000
|
$13.000
|
$35.000
|
$15.500
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
2,053.000
|
$20.000
|
$15.000
|
$22.000
|
$30.000
|
$14.250
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
420.000
|
$20.000
|
$15.000
|
$22.000
|
$30.000
|
$18.500
|
|
|
CONC CURB (TY II)
|
LF
|
13.000
|
$50.000
|
$200.000
|
$108.000
|
$50.000
|
$200.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
8,445.000
|
$30.000
|
$27.950
|
$30.000
|
$30.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
65.000
|
$2,300.000
|
$2,096.250
|
$2,376.000
|
$2,500.000
|
$2,600.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
18.000
|
$1,600.000
|
$1,451.250
|
$2,700.000
|
$2,500.000
|
$1,700.000
|
|
|
TL-3 31" SHORT RADIUS (COMPLETE)
|
EA
|
1.000
|
$30,000.000
|
$31,175.000
|
$2,160.000
|
$40,000.000
|
$32,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
10,327.000
|
$5.000
|
$2.680
|
$2.250
|
$6.000
|
$5.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$385.000
|
$268.750
|
$540.000
|
$500.000
|
$325.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
43.000
|
$3,400.000
|
$3,332.500
|
$4,320.000
|
$3,700.000
|
$4,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
32.000
|
$370.000
|
$268.750
|
$540.000
|
$500.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
50.000
|
$1,700.000
|
$800.000
|
$2,160.000
|
$2,000.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
50.000
|
$1,000.000
|
$800.000
|
$1,080.000
|
$750.000
|
$800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
10.000
|
$10,000.000
|
$8,500.000
|
$10,800.000
|
$12,000.000
|
$10,000.000
|
|
|
RELOCATE ELECTRICAL SERVICES
|
EA
|
2.000
|
$1,500.000
|
$5,500.000
|
$6,480.000
|
$12,000.000
|
$2,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
125.000
|
$40.000
|
$27.500
|
$54.000
|
$50.000
|
$35.000
|
|
|
DRIFTWOOD REMOVAL
|
CY
|
445.000
|
$262.930
|
$100.000
|
$66.000
|
$100.000
|
$75.000
|
|
|
CONCRETE RAIL REPLACEMENT (IN-KIND)
|
LF
|
41.000
|
$951.290
|
$400.000
|
$1,080.000
|
$250.000
|
$600.000
|
|
|
REP STL BRIDGE MBR (STRAIGHTEN MEMB)
|
EA
|
3.000
|
$34,575.000
|
$45,000.000
|
$10,800.000
|
$15,000.000
|
$25,000.000
|
|
|
REP STL BRIDGE MBR (ANCHOR BOLT NUTS)
|
EA
|
2.000
|
$34,575.000
|
$1,200.000
|
$5,400.000
|
$300.000
|
$1,500.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
33.000
|
$582.270
|
$400.000
|
$486.000
|
$500.000
|
$1,200.000
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
63.000
|
$13,000.000
|
$165.000
|
$270.000
|
$150.000
|
$450.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
12.000
|
$25,000.000
|
$9,500.000
|
$10,800.000
|
$10,000.000
|
$15,000.000
|
|
|
CONCRETE BEAM REP(STRAND SPLICE & CFRP)
|
EA
|
2.000
|
$25,000.000
|
$4,500.000
|
$43,200.000
|
$10,000.000
|
$25,000.000
|
|
|
LANE CLOSURE(SETUP & REM)(TYP 1)
|
EA
|
2.000
|
$3,000.000
|
$3,500.000
|
$8,640.000
|
$2,000.000
|
$1,000.000
|
|
|
LANE CLOSURE(SETUP & REM)(TYP 14)
|
EA
|
2.000
|
$3,000.000
|
$3,500.000
|
$8,640.000
|
$2,000.000
|
$1,000.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
24.000
|
$10.000
|
$75.000
|
$220.000
|
$40.000
|
$25.000
|
|
|
BONDING COURSE
|
GAL
|
20.000
|
$10.000
|
$75.000
|
$220.000
|
$40.000
|
$25.000
|
|
Totals: |
$9,122,455.440
|
$7,263,765.260
|
$7,514,627.050
|
$9,148,925.500
|
$11,895,137.750
|