PREPARING ROW
|
AC
|
1.000
|
$5,200.000
|
$36,218.960
|
$3,994.690
|
$6,500.000
|
$40,000.000
|
$100,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
492.000
|
$15.000
|
$15.500
|
$20.000
|
$15.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,347.000
|
$30.000
|
$8.950
|
$16.000
|
$15.000
|
$16.000
|
$20.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
1,185.000
|
$10.000
|
$8.050
|
$4.000
|
$10.000
|
$10.000
|
$20.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
230.000
|
$15.000
|
$44.000
|
$10.000
|
$15.000
|
$20.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
6,246.000
|
$20.000
|
$11.000
|
$10.000
|
$8.000
|
$15.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
272.000
|
$30.000
|
$61.000
|
$30.000
|
$30.000
|
$16.000
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
541.000
|
$20.000
|
$57.000
|
$20.000
|
$20.000
|
$16.000
|
$35.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,435.000
|
$30.000
|
$43.000
|
$12.000
|
$25.000
|
$15.000
|
$30.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
11,792.000
|
$1.500
|
$8.400
|
$7.000
|
$5.750
|
$4.000
|
$6.000
|
|
|
BLOCK SODDING
|
SY
|
11,792.000
|
$5.000
|
$5.000
|
$6.000
|
$5.750
|
$5.000
|
$6.000
|
|
|
VEGETATIVE WATERING
|
MG
|
183.955
|
$30.000
|
$118.000
|
$27.900
|
$45.000
|
$1.000
|
$50.000
|
|
|
D-GR HMA(SQ) TY-C PG76-22
|
TON
|
135.600
|
$115.000
|
$300.000
|
$175.000
|
$290.000
|
$150.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
105.600
|
$3.000
|
$10.000
|
$20.000
|
$8.000
|
$5.000
|
$10.000
|
|
|
FLEX PAVE STRUCTURE REPAIR (8"-10")
|
SY
|
228.000
|
$100.000
|
$240.000
|
$160.000
|
$55.000
|
$80.000
|
$65.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
877.000
|
$2.250
|
$36.000
|
$35.000
|
$4.000
|
$12.000
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
47.000
|
$210.000
|
$162.000
|
$100.000
|
$165.000
|
$300.000
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
494.000
|
$5.000
|
$2.200
|
$8.000
|
$4.000
|
$1.000
|
$10.000
|
|
|
CL A CONC (MISC)
|
SY
|
20.000
|
$550.000
|
$350.000
|
$105.000
|
$150.000
|
$75.000
|
$500.000
|
|
|
CL C CONC (MISC)
|
CY
|
209.000
|
$675.000
|
$900.000
|
$595.000
|
$750.000
|
$850.000
|
$850.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
2,101.000
|
$55.000
|
$69.000
|
$32.000
|
$80.000
|
$35.000
|
$85.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
362.000
|
$500.000
|
$500.000
|
$500.000
|
$425.000
|
$650.000
|
$500.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
2,153.000
|
$125.000
|
$71.000
|
$100.000
|
$100.000
|
$50.000
|
$100.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
108.000
|
$350.000
|
$530.000
|
$500.000
|
$700.000
|
$400.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
10.000
|
$75.000
|
$230.000
|
$90.000
|
$100.000
|
$140.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
90.000
|
$85.000
|
$140.000
|
$120.000
|
$120.000
|
$170.000
|
$105.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
5.000
|
$4,000.000
|
$9,000.000
|
$8,000.000
|
$4,500.000
|
$4,500.000
|
$5,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
2.000
|
$4,500.000
|
$9,400.000
|
$8,000.000
|
$5,500.000
|
$4,500.000
|
$8,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
3.000
|
$5,200.000
|
$9,600.000
|
$8,000.000
|
$7,500.000
|
$5,000.000
|
$10,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$7,500.000
|
$12,400.000
|
$10,500.000
|
$12,000.000
|
$9,500.000
|
$20,000.000
|
|
|
GRATE & FRAME
|
EA
|
261.000
|
$1,250.000
|
$1,000.000
|
$1,000.000
|
$1,100.000
|
$900.000
|
$1,500.000
|
|
|
PIPE (PVC) (SCH 80) (18 IN)
|
LF
|
11.000
|
$75.000
|
$200.000
|
$140.000
|
$100.000
|
$170.000
|
$150.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$2,000.000
|
$3,600.000
|
$9,000.000
|
$5,000.000
|
$1,500.000
|
$5,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$2,500.000
|
$730.000
|
$4,500.000
|
$1,250.000
|
$1,500.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
100.000
|
$50.000
|
$48.000
|
$80.000
|
$18.000
|
$30.000
|
$30.000
|
|
|
REMOV STR (LARGE)
|
EA
|
1.000
|
$3,000.000
|
$1,510.000
|
$4,500.000
|
$5,000.000
|
$3,000.000
|
$5,000.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
41.000
|
$250.000
|
$38.000
|
$60.000
|
$55.000
|
$10.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$280,000.000
|
$126,766.370
|
$370,000.000
|
$270,000.000
|
$340,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$2,500.000
|
$8,600.000
|
$8,500.000
|
$4,500.000
|
$2,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
25.000
|
$40.000
|
$30.000
|
$38.000
|
$30.000
|
$5.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
25.000
|
$12.000
|
$10.000
|
$30.000
|
$9.000
|
$5.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$30.000
|
$13.000
|
$16.000
|
$14.000
|
$5.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$10.000
|
$2.000
|
$11.000
|
$4.000
|
$5.000
|
$20.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
2,400.000
|
$6.000
|
$5.000
|
$6.000
|
$4.000
|
$0.100
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,600.000
|
$55.000
|
$3.250
|
$4.000
|
$3.750
|
$0.100
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,600.000
|
$2.000
|
$1.000
|
$1.000
|
$0.750
|
$0.100
|
$9.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
560.000
|
$40.000
|
$12.500
|
$35.000
|
$40.000
|
$35.000
|
$85.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$65.000
|
$104.000
|
$35.000
|
$45.000
|
$35.000
|
$95.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
560.000
|
$10.000
|
$10.500
|
$20.000
|
$12.000
|
$10.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$15.000
|
$15.500
|
$20.000
|
$12.000
|
$10.000
|
$20.000
|
|
|
CONC CURB (TY I)
|
LF
|
177.000
|
$20.000
|
$24.000
|
$16.000
|
$19.000
|
$40.000
|
$35.000
|
|
|
CONC CURB (TY II)
|
LF
|
6,606.000
|
$22.000
|
$11.000
|
$16.000
|
$19.000
|
$40.000
|
$30.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
68.000
|
$40.000
|
$46.000
|
$40.000
|
$30.000
|
$40.000
|
$50.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
308.000
|
$200.000
|
$300.000
|
$160.000
|
$275.000
|
$225.000
|
$125.000
|
|
|
CONC CURB & GUTTER(VALLEY GUTTER)(36")
|
LF
|
52.000
|
$80.000
|
$54.000
|
$85.000
|
$60.000
|
$40.000
|
$80.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
5,302.000
|
$75.000
|
$64.000
|
$77.500
|
$80.000
|
$105.000
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,618.000
|
$65.000
|
$40.000
|
$65.000
|
$40.000
|
$42.000
|
$40.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
6,986.000
|
$60.000
|
$46.000
|
$50.000
|
$55.000
|
$92.000
|
$50.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
33.000
|
$65.000
|
$120.000
|
$95.000
|
$150.000
|
$100.000
|
$250.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
246.000
|
$65.000
|
$68.000
|
$95.000
|
$150.000
|
$100.000
|
$250.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
62.000
|
$65.000
|
$56.000
|
$95.000
|
$150.000
|
$100.000
|
$250.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
87.000
|
$65.000
|
$56.000
|
$145.000
|
$200.000
|
$100.000
|
$250.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
24.000
|
$65.000
|
$185.000
|
$120.000
|
$150.000
|
$100.000
|
$250.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
52.000
|
$65.000
|
$142.000
|
$120.000
|
$150.000
|
$100.000
|
$250.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
31.000
|
$65.000
|
$76.000
|
$120.000
|
$150.000
|
$100.000
|
$250.000
|
|
|
CURB RAMPS (TY 20)
|
SY
|
8.000
|
$65.000
|
$550.000
|
$200.000
|
$200.000
|
$100.000
|
$250.000
|
|
|
CURB RAMPS (TY 21)
|
SY
|
29.000
|
$65.000
|
$157.000
|
$145.000
|
$200.000
|
$100.000
|
$250.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
1,787.000
|
$75.000
|
$230.000
|
$168.000
|
$275.000
|
$170.000
|
$65.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$250.000
|
$200.000
|
$350.000
|
$300.000
|
$250.000
|
$850.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
4.000
|
$500.000
|
$890.000
|
$541.910
|
$1,100.000
|
$800.000
|
$1,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
4.000
|
$200.000
|
$220.000
|
$825.060
|
$225.000
|
$50.000
|
$550.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
26.000
|
$475.000
|
$350.000
|
$175.000
|
$495.000
|
$500.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$50.000
|
$84.000
|
$100.000
|
$100.000
|
$90.000
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,655.000
|
$2.000
|
$1.200
|
$1.450
|
$1.200
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
8.000
|
$4.000
|
$5.000
|
$6.040
|
$5.000
|
$5.000
|
$10.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,124.000
|
$7.000
|
$6.000
|
$7.240
|
$6.000
|
$7.000
|
$20.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,031.000
|
$0.600
|
$0.500
|
$0.600
|
$0.500
|
$5.000
|
$1.000
|
|
|
PAVEMENT SEALER 8"
|
LF
|
8.000
|
$0.700
|
$2.000
|
$2.410
|
$2.000
|
$55.000
|
$5.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,124.000
|
$1.250
|
$2.450
|
$2.940
|
$2.440
|
$2.000
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
905.000
|
$0.550
|
$2.500
|
$3.020
|
$2.500
|
$2.000
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
8.000
|
$0.400
|
$5.000
|
$6.040
|
$5.000
|
$2.000
|
$10.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
118.000
|
$0.400
|
$5.000
|
$6.030
|
$5.000
|
$2.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
905.000
|
$1.250
|
$1.400
|
$1.690
|
$1.400
|
$2.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
781.000
|
$3.000
|
$3.650
|
$4.420
|
$3.660
|
$4.000
|
$8.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,031.000
|
$0.200
|
$0.500
|
$0.600
|
$0.500
|
$0.100
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
8.000
|
$0.300
|
$1.000
|
$1.210
|
$1.000
|
$0.200
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,124.000
|
$0.650
|
$3.000
|
$3.620
|
$3.000
|
$0.400
|
$8.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
2.000
|
$500.000
|
$820.000
|
$1,000.000
|
$1,500.000
|
$2,500.000
|
$1,850.000
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
12.000
|
$450.000
|
$610.000
|
$800.000
|
$600.000
|
$500.000
|
$850.000
|
|
|
INSTALL OF VEHICLE DETECTORS
|
LF
|
4,000.000
|
$2.000
|
$0.180
|
$5.000
|
$8.000
|
$4.000
|
$12.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
14.000
|
$75.000
|
$76.000
|
$300.000
|
$100.000
|
$55.000
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
270.000
|
$72.000
|
$98.000
|
$66.000
|
$100.000
|
$55.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
135.000
|
$165.000
|
$340.000
|
$156.200
|
$250.000
|
$55.000
|
$300.000
|
|
|
NGP ADJUST GAS FACILITY ACCESS COVER
|
EA
|
4.000
|
$225.000
|
$1,200.000
|
$750.000
|
$795.000
|
$3,000.000
|
$5,000.000
|
|
|
ADJUST VALVE BOX
|
EA
|
4.000
|
$1,500.000
|
$1,000.000
|
$228.100
|
$795.000
|
$110.000
|
$650.000
|
|
Totals: |
$3,755,553.500
|
$3,621,896.470
|
$3,741,364.174
|
$3,897,359.295
|
$3,994,502.255
|
$4,408,905.750
|