BEXAR SL 1604 (1479-01-028)

Items: 112

County: BEXAR
Length: 0.0000 MILES (1.8769 MILES)
Highway: SL 1604
District: SAN ANTONIO
Control Number: 1479-01-028
DBE Goal: 0.0%
Project: STP 2026(979)HES
Guaranty: $81,000.00
Time: 263 WORKING DAYS
Engineer's Estimate: $4,058,576.49
Date: 09/03/2026 1:00 PM CDT (16 days ago)
Contract Number: 9263210
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00206794
Contract Type: FEDERAL
Project Description: WIDEN EXISTING ROADWAY TO INCLUDE CONTINUOUS LEFT TURN LANE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$4,058,576.49
Over/Under Est: -15.11% -$613,361.81
Over/Under Est: -11.82% -$479,915.72
Amt Left: 3.87% $133,446.09
Over/Under Est: -7.54% -$306,079.79
Amt Left: 8.92% $307,282.02
Delta: -4.86% -$173,835.93
$3,943,874.43
Over/Under Est: -2.83% -$114,702.06
Amt Left: 14.47% $498,659.75
Delta: -5.10% -$191,377.73
Over/Under Est: -2% -$81,030.93
Amt Left: 15.45% $532,330.88
Delta: -0.85% -$33,671.13
Over/Under Est: 22.91% $929,762.36
Amt Left: 44.79% $1,543,124.17
Delta: -25.41% -$1,010,793.29

Bid Items & Bid Tabulations

112 Total 0 of 112
BEXAR  |  SL 1604  |  SAN ANTONIO  |  1479-01-028  |  09/03/2026 1:00 PM CDT  |  $4,058,576.49  |  STP 2026(979)HES  |  HAZARD ELIM & SAFETY  |  263 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
TEXAS MATERIALS GROUP, INC.
DEAN WORD COMPANY, LTD.
DAN WILLIAMS COMPANY
E-Z BEL CONSTRUCTION, LLC
ROMAN EMPERORS ROAD, LLC
PREPARING ROW
STA 78.800 $4,000.000 $779.210 $800.000 $2,400.000 $2,000.000 $2,000.000 $1,000.000
REMOV CONC (RIPRAP)
SY 802.000 $12.500 $20.750 $43.000 $51.500 $17.500 $1.000 $20.000
REMOV CONC (DRIVEWAYS)
SY 137.000 $15.200 $20.750 $53.000 $67.500 $25.000 $1.000 $30.000
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
SY 3,420.000 $10.000 $5.470 $5.500 $10.750 $7.000 $3.000 $10.000
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 4,883.000 $15.190 $5.470 $6.500 $11.500 $6.000 $5.000 $14.000
EXCAV (ROADWAY)
CY 6,245.000 $15.000 $21.880 $18.000 $10.500 $15.000 $20.000 $20.000
EMBANK (FNL)(OC)(TY C1)
CY 2,494.000 $28.360 $18.490 $14.000 $29.250 $20.000 $14.000 $45.000
FURN & PLACE TOPSOIL (4")
SY 30,001.000 $2.000 $1.090 $1.400 $2.250 $1.150 $1.000 $2.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 30,001.000 $0.280 $0.260 $0.250 $0.250 $0.250 $0.300 $0.250
BROADCAST SEED (TEMP_WARM)
SY 15,002.000 $0.160 $0.190 $0.150 $0.250 $0.150 $0.200 $0.250
BROADCAST SEED (TEMP_COOL)
SY 15,002.000 $0.170 $0.190 $0.180 $0.250 $0.180 $0.200 $0.250
VEGETATIVE WATERING
TGL 467.900 $24.510 $22.890 $5.000 $93.500 $5.000 $61.000 $80.000
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 30,001.000 $1.300 $1.640 $0.950 $1.000 $1.000 $1.700 $2.500
PROOF ROLLING
HR 16.000 $150.000 $71.500 $136.000 $138.250 $100.000 $200.000 $130.000
FL BS(CIP)(TY D, GR 1-2 OR 5)(FNAL POS)
CY 2,961.000 $62.500 $68.040 $92.300 $73.500 $90.000 $94.000 $45.000
PRIME COAT(MC-30 OR AE-P)
GAL 3,149.000 $4.380 $4.730 $4.650 $0.100 $5.000 $5.000 $5.000
D-GR HMA TY-B PG64-22
TON 1,735.000 $135.000 $96.990 $89.000 $104.000 $100.000 $160.000 $140.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 188.000 $135.000 $114.320 $160.000 $142.000 $190.000 $188.000 $230.000
D-GR HMA TY-D PG76-22
TON 1,914.000 $125.000 $105.580 $101.000 $116.000 $120.000 $118.000 $165.000
TOM-C PG76-22 SAC-B
TON 3,249.000 $150.000 $123.710 $134.000 $126.250 $145.000 $141.000 $165.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 12,065.000 $27.840 $36.150 $36.300 $29.750 $33.000 $35.000 $60.000
PLANE ASPH CONC PAV(0" TO 0.5")
SY 56,000.000 $0.370 $0.880 $0.750 $0.500 $1.000 $1.000 $1.500
PLANE ASPH CONC PAV(1")
SY 50,929.000 $1.500 $1.070 $1.160 $1.750 $1.600 $1.600 $2.000
TEMPORARY SPL SHORING
SF 438.000 $18.320 $39.000 $39.000 $43.250 $45.000 $10.000 $40.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 53.000 $416.650 $162.000 $420.000 $489.750 $200.000 $380.000 $500.000
RIPRAP (CONC)(5 IN)
CY 22.600 $564.130 $634.000 $634.000 $801.250 $575.000 $1,500.000 $560.000
RIPRAP (MOW STRIP)(4 IN)
CY 85.000 $600.820 $684.000 $684.000 $881.750 $575.000 $1,000.000 $650.000
RAIL (TY T631)
LF 150.000 $107.380 $95.000 $95.000 $110.750 $100.000 $88.000 $120.000
CONC BOX CULV (8 FT X 4 FT)
LF 71.200 $823.930 $994.000 $994.000 $1,102.000 $1,200.000 $1,600.000 $1,000.000
WINGWALL (FW - 0) (HW=7 FT)
EA 1.000 $23,338.500 $13,030.000 $13,030.000 $15,462.250 $27,500.000 $25,000.000 $30,000.000
REMOV STR (WINGWALL)
EA 1.000 $1,818.430 $8,325.000 $8,325.000 $9,550.250 $3,000.000 $1,000.000 $3,000.000
MOBILIZATION
LS 1.000 $370,603.520 $247,081.310 $306,000.000 $270,000.000 $390,000.000 $330,000.000 $390,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $8,161.270 $1,400.720 $4,000.000 $6,011.250 $14,500.000 $1,800.000 $6,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 350.000 $84.000 $41.180 $25.000 $83.500 $80.000 $15.000 $100.000
TMA (STATIONARY)
DAY 125.000 $199.310 $128.690 $25.000 $50.000 $125.000 $261.000 $500.000
TMA (MOBILE OPERATION)
DAY 50.000 $313.260 $257.370 $25.000 $50.000 $300.000 $450.000 $900.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 255.000 $35.920 $35.500 $36.250 $48.500 $36.250 $36.000 $40.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 468.000 $50.710 $39.450 $38.750 $52.250 $38.750 $40.000 $45.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 99.000 $100.000 $128.700 $90.750 $129.500 $91.000 $129.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 822.000 $12.180 $9.440 $28.750 $20.500 $29.000 $10.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $25.060 $32.100 $31.500 $45.500 $39.000 $33.000 $65.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $5.200 $7.900 $16.500 $14.250 $32.000 $8.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,902.000 $3.770 $3.500 $2.650 $5.250 $3.000 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,902.000 $0.890 $0.250 $0.950 $1.500 $1.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 123.000 $6.390 $6.200 $3.750 $8.500 $3.750 $7.000 $25.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 123.000 $0.880 $1.000 $1.000 $1.500 $1.000 $1.000 $2.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 5,860.000 $39.800 $36.470 $26.000 $14.500 $25.000 $30.000 $45.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 760.000 $56.640 $39.030 $39.000 $30.000 $25.000 $28.000 $50.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 5,200.000 $7.150 $15.800 $11.500 $9.750 $10.000 $4.000 $25.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 740.000 $9.020 $14.700 $11.500 $10.500 $10.000 $4.000 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 5,860.000 $10.200 $13.520 $23.000 $10.000 $12.000 $6.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 760.000 $15.390 $15.040 $23.000 $9.750 $12.000 $7.000 $30.000
DRIVEWAYS (CONC)
SY 137.000 $135.000 $100.000 $119.250 $119.750 $100.000 $185.000 $120.000
DRIVEWAYS (SURF TREAT)
SY 3,420.000 $36.600 $34.720 $46.000 $69.750 $38.000 $40.000 $45.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $23.910 $25.000 $25.000 $29.250 $27.000 $24.000 $28.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,210.980 $1,350.000 $1,340.000 $1,562.750 $1,500.000 $1,375.000 $3,000.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 4.000 $1,403.000 $2,000.000 $2,550.000 $2,233.250 $2,000.000 $1,825.000 $3,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,150.000 $2.600 $2.500 $1.500 $1.750 $2.000 $3.000 $10.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $201.440 $250.000 $125.000 $145.750 $150.000 $300.000 $420.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $289.710 $250.000 $155.000 $1,554.250 $160.000 $300.000 $420.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,147.130 $3,250.000 $3,525.000 $4,111.000 $4,000.000 $3,300.000 $5,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $254.470 $250.000 $150.000 $175.000 $200.000 $300.000 $425.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 19.000 $314.650 $275.000 $275.000 $320.750 $300.000 $500.000 $300.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $352.400 $325.000 $325.000 $379.000 $350.000 $500.000 $800.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 9.000 $596.400 $550.000 $550.000 $641.500 $555.000 $500.000 $800.000
CONDT (PVC) (SCH 80) (2")
LF 40.000 $10.900 $16.500 $24.000 $28.000 $16.500 $37.000 $20.000
CONDT (PVC) (SCH 80) (3")
LF 20.000 $18.870 $22.190 $50.000 $58.250 $22.190 $40.000 $30.000
ELEC CONDR (NO.6) BARE
LF 95.000 $2.160 $2.090 $2.500 $3.000 $2.090 $2.000 $3.500
ELEC CONDR (NO.6) INSULATED
LF 20.000 $2.280 $2.550 $3.250 $3.750 $2.550 $3.000 $4.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 675.000 $2.960 $5.130 $3.400 $4.000 $5.130 $3.250 $4.000
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,313.880 $1,017.000 $1,500.000 $1,749.250 $1,050.000 $1,400.000 $1,700.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,823.570 $1,241.000 $2,100.000 $2,449.000 $1,250.000 $1,600.000 $1,800.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 420.000 $3.590 $5.220 $6.250 $7.250 $5.220 $6.000 $5.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 420.000 $3.800 $5.540 $6.250 $7.250 $5.540 $6.500 $4.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $471.570 $231.000 $470.000 $548.250 $250.000 $330.000 $750.000
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
EA 1.000 $7,112.410 $7,241.000 $6,500.000 $7,580.500 $10,000.000 $7,700.000 $10,500.000
ALUMINUM SIGNS (TY A)
SF 45.000 $39.170 $25.000 $25.000 $50.250 $60.000 $44.000 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $677.840 $625.000 $625.000 $729.000 $630.000 $785.440 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 1.000 $776.750 $750.000 $750.000 $874.750 $755.000 $378.670 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $776.110 $750.000 $750.000 $874.750 $755.000 $429.330 $860.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $918.160 $900.000 $900.000 $1,049.500 $910.000 $502.670 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,003.550 $900.000 $900.000 $1,049.500 $910.000 $606.670 $1,000.000
REMOVE SM RD SN SUP&AM
EA 22.000 $110.890 $75.000 $75.000 $87.500 $80.000 $100.000 $120.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 22.000 $26.750 $25.000 $25.000 $29.250 $25.000 $14.670 $35.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 8.000 $84.200 $75.000 $75.000 $87.500 $75.000 $29.330 $110.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 33,724.000 $0.760 $0.690 $0.670 $0.750 $0.670 $0.950 $0.700
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 414.000 $1.300 $1.250 $1.210 $1.500 $1.210 $2.000 $1.400
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 90.000 $7.390 $10.330 $10.000 $11.750 $10.000 $15.000 $6.500
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 36,297.000 $0.770 $0.690 $0.670 $0.750 $0.670 $0.950 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 998.000 $0.990 $1.450 $1.550 $1.750 $2.350 $1.000 $1.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,277.000 $0.350 $1.450 $1.550 $1.750 $2.350 $1.000 $1.600
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 22.000 $1.080 $1.250 $1.210 $1.500 $1.210 $5.000 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 828.000 $0.960 $0.830 $0.800 $1.000 $0.800 $3.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 142.000 $6.810 $7.740 $7.500 $8.750 $7.500 $15.000 $7.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 33.000 $149.630 $154.880 $150.000 $175.000 $150.000 $375.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 5.000 $168.990 $206.510 $200.000 $233.250 $200.000 $425.000 $180.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 19,106.000 $0.710 $0.740 $0.720 $0.750 $0.720 $1.250 $0.500
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 26,541.000 $0.720 $0.740 $0.720 $0.750 $0.720 $1.250 $0.500
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 3,005.000 $0.730 $0.800 $0.770 $1.000 $0.770 $1.250 $0.700
REFL PAV MRKR TY I-C
EA 44.000 $4.060 $3.870 $3.750 $4.250 $3.750 $10.000 $4.000
REFL PAV MRKR TY II-A-A
EA 1,004.000 $3.990 $3.870 $3.750 $4.250 $3.750 $8.000 $4.000
ELIM EXT PM & MRKS (4")
LF 30,727.000 $0.340 $0.260 $0.250 $0.300 $0.250 $1.000 $0.600
ELIM EXT PM & MRKS (6")
LF 16,846.000 $0.370 $0.260 $0.250 $0.300 $0.250 $1.000 $0.250
ELIM EXT PM & MRKS (8")
LF 317.000 $0.700 $0.260 $0.250 $0.300 $0.250 $1.000 $0.500
ELIM EXT PM & MRKS (24")
LF 67.000 $4.960 $6.200 $6.000 $7.000 $6.000 $5.000 $4.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $2,000.000 $5,382.000 $5,600.000 $6,531.000 $8,500.000 $32,000.000 $30,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $5,922.030 $1,930.000 $2,300.000 $2,682.250 $2,500.000 $3,700.000 $8,000.000
VEH SIG SEC (12")LED(RED)
EA 16.000 $311.750 $386.000 $420.000 $489.750 $386.000 $340.000 $450.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 670.000 $2.720 $4.160 $3.500 $4.000 $4.160 $2.500 $3.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $6,770.560 $6,867.000 $10,500.000 $12,245.500 $9,000.000 $10,000.000 $10,000.000
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 4.000 $7,780.000 $8,568.000 $8,600.000 $10,029.500 $12,000.000 $10,000.000 $14,000.000
BONDING COURSE
GAL 14,585.000 $3.420 $3.430 $0.010 $0.100 $0.100 $1.000 $3.000
Totals: $4,058,576.493 $3,445,214.679 $3,578,660.770 $3,752,496.700 $3,943,874.430 $3,977,545.560 $4,988,338.850
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,300.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,600.00
Total: $9,900.00