PREPARING ROW
|
STA
|
78.800
|
$4,000.000
|
$779.210
|
$800.000
|
$2,400.000
|
$2,000.000
|
$2,000.000
|
$1,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
802.000
|
$12.500
|
$20.750
|
$43.000
|
$51.500
|
$17.500
|
$1.000
|
$20.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
137.000
|
$15.200
|
$20.750
|
$53.000
|
$67.500
|
$25.000
|
$1.000
|
$30.000
|
|
|
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
3,420.000
|
$10.000
|
$5.470
|
$5.500
|
$10.750
|
$7.000
|
$3.000
|
$10.000
|
|
|
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
4,883.000
|
$15.190
|
$5.470
|
$6.500
|
$11.500
|
$6.000
|
$5.000
|
$14.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
6,245.000
|
$15.000
|
$21.880
|
$18.000
|
$10.500
|
$15.000
|
$20.000
|
$20.000
|
|
|
EMBANK (FNL)(OC)(TY C1)
|
CY
|
2,494.000
|
$28.360
|
$18.490
|
$14.000
|
$29.250
|
$20.000
|
$14.000
|
$45.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
30,001.000
|
$2.000
|
$1.090
|
$1.400
|
$2.250
|
$1.150
|
$1.000
|
$2.000
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
30,001.000
|
$0.280
|
$0.260
|
$0.250
|
$0.250
|
$0.250
|
$0.300
|
$0.250
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
15,002.000
|
$0.160
|
$0.190
|
$0.150
|
$0.250
|
$0.150
|
$0.200
|
$0.250
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
15,002.000
|
$0.170
|
$0.190
|
$0.180
|
$0.250
|
$0.180
|
$0.200
|
$0.250
|
|
|
VEGETATIVE WATERING
|
TGL
|
467.900
|
$24.510
|
$22.890
|
$5.000
|
$93.500
|
$5.000
|
$61.000
|
$80.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
|
SY
|
30,001.000
|
$1.300
|
$1.640
|
$0.950
|
$1.000
|
$1.000
|
$1.700
|
$2.500
|
|
|
PROOF ROLLING
|
HR
|
16.000
|
$150.000
|
$71.500
|
$136.000
|
$138.250
|
$100.000
|
$200.000
|
$130.000
|
|
|
FL BS(CIP)(TY D, GR 1-2 OR 5)(FNAL POS)
|
CY
|
2,961.000
|
$62.500
|
$68.040
|
$92.300
|
$73.500
|
$90.000
|
$94.000
|
$45.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
3,149.000
|
$4.380
|
$4.730
|
$4.650
|
$0.100
|
$5.000
|
$5.000
|
$5.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,735.000
|
$135.000
|
$96.990
|
$89.000
|
$104.000
|
$100.000
|
$160.000
|
$140.000
|
|
|
D-GR HMA TY-D PG64-22 (LEVEL-UP)
|
TON
|
188.000
|
$135.000
|
$114.320
|
$160.000
|
$142.000
|
$190.000
|
$188.000
|
$230.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
1,914.000
|
$125.000
|
$105.580
|
$101.000
|
$116.000
|
$120.000
|
$118.000
|
$165.000
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
3,249.000
|
$150.000
|
$123.710
|
$134.000
|
$126.250
|
$145.000
|
$141.000
|
$165.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
12,065.000
|
$27.840
|
$36.150
|
$36.300
|
$29.750
|
$33.000
|
$35.000
|
$60.000
|
|
|
PLANE ASPH CONC PAV(0" TO 0.5")
|
SY
|
56,000.000
|
$0.370
|
$0.880
|
$0.750
|
$0.500
|
$1.000
|
$1.000
|
$1.500
|
|
|
PLANE ASPH CONC PAV(1")
|
SY
|
50,929.000
|
$1.500
|
$1.070
|
$1.160
|
$1.750
|
$1.600
|
$1.600
|
$2.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
438.000
|
$18.320
|
$39.000
|
$39.000
|
$43.250
|
$45.000
|
$10.000
|
$40.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
53.000
|
$416.650
|
$162.000
|
$420.000
|
$489.750
|
$200.000
|
$380.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
22.600
|
$564.130
|
$634.000
|
$634.000
|
$801.250
|
$575.000
|
$1,500.000
|
$560.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
85.000
|
$600.820
|
$684.000
|
$684.000
|
$881.750
|
$575.000
|
$1,000.000
|
$650.000
|
|
|
RAIL (TY T631)
|
LF
|
150.000
|
$107.380
|
$95.000
|
$95.000
|
$110.750
|
$100.000
|
$88.000
|
$120.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
71.200
|
$823.930
|
$994.000
|
$994.000
|
$1,102.000
|
$1,200.000
|
$1,600.000
|
$1,000.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
1.000
|
$23,338.500
|
$13,030.000
|
$13,030.000
|
$15,462.250
|
$27,500.000
|
$25,000.000
|
$30,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,818.430
|
$8,325.000
|
$8,325.000
|
$9,550.250
|
$3,000.000
|
$1,000.000
|
$3,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$370,603.520
|
$247,081.310
|
$306,000.000
|
$270,000.000
|
$390,000.000
|
$330,000.000
|
$390,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$8,161.270
|
$1,400.720
|
$4,000.000
|
$6,011.250
|
$14,500.000
|
$1,800.000
|
$6,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
350.000
|
$84.000
|
$41.180
|
$25.000
|
$83.500
|
$80.000
|
$15.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
125.000
|
$199.310
|
$128.690
|
$25.000
|
$50.000
|
$125.000
|
$261.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
$313.260
|
$257.370
|
$25.000
|
$50.000
|
$300.000
|
$450.000
|
$900.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
255.000
|
$35.920
|
$35.500
|
$36.250
|
$48.500
|
$36.250
|
$36.000
|
$40.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
468.000
|
$50.710
|
$39.450
|
$38.750
|
$52.250
|
$38.750
|
$40.000
|
$45.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
99.000
|
$100.000
|
$128.700
|
$90.750
|
$129.500
|
$91.000
|
$129.000
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
822.000
|
$12.180
|
$9.440
|
$28.750
|
$20.500
|
$29.000
|
$10.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
78.000
|
$25.060
|
$32.100
|
$31.500
|
$45.500
|
$39.000
|
$33.000
|
$65.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$5.200
|
$7.900
|
$16.500
|
$14.250
|
$32.000
|
$8.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,902.000
|
$3.770
|
$3.500
|
$2.650
|
$5.250
|
$3.000
|
$4.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,902.000
|
$0.890
|
$0.250
|
$0.950
|
$1.500
|
$1.000
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
123.000
|
$6.390
|
$6.200
|
$3.750
|
$8.500
|
$3.750
|
$7.000
|
$25.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
123.000
|
$0.880
|
$1.000
|
$1.000
|
$1.500
|
$1.000
|
$1.000
|
$2.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
5,860.000
|
$39.800
|
$36.470
|
$26.000
|
$14.500
|
$25.000
|
$30.000
|
$45.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
760.000
|
$56.640
|
$39.030
|
$39.000
|
$30.000
|
$25.000
|
$28.000
|
$50.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
5,200.000
|
$7.150
|
$15.800
|
$11.500
|
$9.750
|
$10.000
|
$4.000
|
$25.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
740.000
|
$9.020
|
$14.700
|
$11.500
|
$10.500
|
$10.000
|
$4.000
|
$30.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
5,860.000
|
$10.200
|
$13.520
|
$23.000
|
$10.000
|
$12.000
|
$6.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
760.000
|
$15.390
|
$15.040
|
$23.000
|
$9.750
|
$12.000
|
$7.000
|
$30.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
137.000
|
$135.000
|
$100.000
|
$119.250
|
$119.750
|
$100.000
|
$185.000
|
$120.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
3,420.000
|
$36.600
|
$34.720
|
$46.000
|
$69.750
|
$38.000
|
$40.000
|
$45.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,000.000
|
$23.910
|
$25.000
|
$25.000
|
$29.250
|
$27.000
|
$24.000
|
$28.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,210.980
|
$1,350.000
|
$1,340.000
|
$1,562.750
|
$1,500.000
|
$1,375.000
|
$3,000.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
4.000
|
$1,403.000
|
$2,000.000
|
$2,550.000
|
$2,233.250
|
$2,000.000
|
$1,825.000
|
$3,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,150.000
|
$2.600
|
$2.500
|
$1.500
|
$1.750
|
$2.000
|
$3.000
|
$10.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$201.440
|
$250.000
|
$125.000
|
$145.750
|
$150.000
|
$300.000
|
$420.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$289.710
|
$250.000
|
$155.000
|
$1,554.250
|
$160.000
|
$300.000
|
$420.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,147.130
|
$3,250.000
|
$3,525.000
|
$4,111.000
|
$4,000.000
|
$3,300.000
|
$5,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$254.470
|
$250.000
|
$150.000
|
$175.000
|
$200.000
|
$300.000
|
$425.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
19.000
|
$314.650
|
$275.000
|
$275.000
|
$320.750
|
$300.000
|
$500.000
|
$300.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$352.400
|
$325.000
|
$325.000
|
$379.000
|
$350.000
|
$500.000
|
$800.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
9.000
|
$596.400
|
$550.000
|
$550.000
|
$641.500
|
$555.000
|
$500.000
|
$800.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
40.000
|
$10.900
|
$16.500
|
$24.000
|
$28.000
|
$16.500
|
$37.000
|
$20.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
20.000
|
$18.870
|
$22.190
|
$50.000
|
$58.250
|
$22.190
|
$40.000
|
$30.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
95.000
|
$2.160
|
$2.090
|
$2.500
|
$3.000
|
$2.090
|
$2.000
|
$3.500
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
20.000
|
$2.280
|
$2.550
|
$3.250
|
$3.750
|
$2.550
|
$3.000
|
$4.000
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
675.000
|
$2.960
|
$5.130
|
$3.400
|
$4.000
|
$5.130
|
$3.250
|
$4.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$1,313.880
|
$1,017.000
|
$1,500.000
|
$1,749.250
|
$1,050.000
|
$1,400.000
|
$1,700.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,823.570
|
$1,241.000
|
$2,100.000
|
$2,449.000
|
$1,250.000
|
$1,600.000
|
$1,800.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/16")
|
LF
|
420.000
|
$3.590
|
$5.220
|
$6.250
|
$7.250
|
$5.220
|
$6.000
|
$5.000
|
|
|
ZINC-COAT STL WIRE STRAND (5/16")
|
LF
|
420.000
|
$3.800
|
$5.540
|
$6.250
|
$7.250
|
$5.540
|
$6.500
|
$4.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
2.000
|
$471.570
|
$231.000
|
$470.000
|
$548.250
|
$250.000
|
$330.000
|
$750.000
|
|
|
ELC SRV TY D 120/240 070(NS)AL(E)TP(O)
|
EA
|
1.000
|
$7,112.410
|
$7,241.000
|
$6,500.000
|
$7,580.500
|
$10,000.000
|
$7,700.000
|
$10,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
45.000
|
$39.170
|
$25.000
|
$25.000
|
$50.250
|
$60.000
|
$44.000
|
$40.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$677.840
|
$625.000
|
$625.000
|
$729.000
|
$630.000
|
$785.440
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$776.750
|
$750.000
|
$750.000
|
$874.750
|
$755.000
|
$378.670
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$776.110
|
$750.000
|
$750.000
|
$874.750
|
$755.000
|
$429.330
|
$860.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$918.160
|
$900.000
|
$900.000
|
$1,049.500
|
$910.000
|
$502.670
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,003.550
|
$900.000
|
$900.000
|
$1,049.500
|
$910.000
|
$606.670
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
22.000
|
$110.890
|
$75.000
|
$75.000
|
$87.500
|
$80.000
|
$100.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
22.000
|
$26.750
|
$25.000
|
$25.000
|
$29.250
|
$25.000
|
$14.670
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
8.000
|
$84.200
|
$75.000
|
$75.000
|
$87.500
|
$75.000
|
$29.330
|
$110.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
33,724.000
|
$0.760
|
$0.690
|
$0.670
|
$0.750
|
$0.670
|
$0.950
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
414.000
|
$1.300
|
$1.250
|
$1.210
|
$1.500
|
$1.210
|
$2.000
|
$1.400
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
90.000
|
$7.390
|
$10.330
|
$10.000
|
$11.750
|
$10.000
|
$15.000
|
$6.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
36,297.000
|
$0.770
|
$0.690
|
$0.670
|
$0.750
|
$0.670
|
$0.950
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
998.000
|
$0.990
|
$1.450
|
$1.550
|
$1.750
|
$2.350
|
$1.000
|
$1.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,277.000
|
$0.350
|
$1.450
|
$1.550
|
$1.750
|
$2.350
|
$1.000
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
22.000
|
$1.080
|
$1.250
|
$1.210
|
$1.500
|
$1.210
|
$5.000
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
828.000
|
$0.960
|
$0.830
|
$0.800
|
$1.000
|
$0.800
|
$3.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
142.000
|
$6.810
|
$7.740
|
$7.500
|
$8.750
|
$7.500
|
$15.000
|
$7.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
33.000
|
$149.630
|
$154.880
|
$150.000
|
$175.000
|
$150.000
|
$375.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
5.000
|
$168.990
|
$206.510
|
$200.000
|
$233.250
|
$200.000
|
$425.000
|
$180.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
19,106.000
|
$0.710
|
$0.740
|
$0.720
|
$0.750
|
$0.720
|
$1.250
|
$0.500
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
26,541.000
|
$0.720
|
$0.740
|
$0.720
|
$0.750
|
$0.720
|
$1.250
|
$0.500
|
|
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
|
LF
|
3,005.000
|
$0.730
|
$0.800
|
$0.770
|
$1.000
|
$0.770
|
$1.250
|
$0.700
|
|
REFL PAV MRKR TY I-C
|
EA
|
44.000
|
$4.060
|
$3.870
|
$3.750
|
$4.250
|
$3.750
|
$10.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,004.000
|
$3.990
|
$3.870
|
$3.750
|
$4.250
|
$3.750
|
$8.000
|
$4.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
30,727.000
|
$0.340
|
$0.260
|
$0.250
|
$0.300
|
$0.250
|
$1.000
|
$0.600
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
16,846.000
|
$0.370
|
$0.260
|
$0.250
|
$0.300
|
$0.250
|
$1.000
|
$0.250
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
317.000
|
$0.700
|
$0.260
|
$0.250
|
$0.300
|
$0.250
|
$1.000
|
$0.500
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
67.000
|
$4.960
|
$6.200
|
$6.000
|
$7.000
|
$6.000
|
$5.000
|
$4.000
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
1.000
|
$2,000.000
|
$5,382.000
|
$5,600.000
|
$6,531.000
|
$8,500.000
|
$32,000.000
|
$30,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$5,922.030
|
$1,930.000
|
$2,300.000
|
$2,682.250
|
$2,500.000
|
$3,700.000
|
$8,000.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
16.000
|
$311.750
|
$386.000
|
$420.000
|
$489.750
|
$386.000
|
$340.000
|
$450.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
670.000
|
$2.720
|
$4.160
|
$3.500
|
$4.000
|
$4.160
|
$2.500
|
$3.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
1.000
|
$6,770.560
|
$6,867.000
|
$10,500.000
|
$12,245.500
|
$9,000.000
|
$10,000.000
|
$10,000.000
|
|
|
INS TRF SIG PL AM (S)STR(TY B)LUM
|
EA
|
4.000
|
$7,780.000
|
$8,568.000
|
$8,600.000
|
$10,029.500
|
$12,000.000
|
$10,000.000
|
$14,000.000
|
|
|
BONDING COURSE
|
GAL
|
14,585.000
|
$3.420
|
$3.430
|
$0.010
|
$0.100
|
$0.100
|
$1.000
|
$3.000
|
|
Totals: |
$4,058,576.493
|
$3,445,214.679
|
$3,578,660.770
|
$3,752,496.700
|
$3,943,874.430
|
$3,977,545.560
|
$4,988,338.850
|