PREPARING ROW
|
STA
|
12.000
|
$4,500.000
|
$3,200.000
|
$1,217.000
|
$800.000
|
$3,000.000
|
$2,000.000
|
$12,000.000
|
$2,000.000
|
$9,750.000
|
$1,500.000
|
$3,240.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
669.000
|
$9.000
|
$18.000
|
$14.750
|
$10.000
|
$15.000
|
$15.000
|
$11.000
|
$20.000
|
$22.000
|
$24.000
|
$97.350
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
467.000
|
$7.000
|
$18.000
|
$18.400
|
$10.000
|
$25.000
|
$15.000
|
$12.000
|
$30.000
|
$31.000
|
$25.000
|
$109.890
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
3,335.000
|
$5.000
|
$20.000
|
$29.700
|
$20.000
|
$26.000
|
$30.000
|
$15.000
|
$30.000
|
$17.000
|
$35.000
|
$73.260
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
STA
|
13.000
|
$435.000
|
$320.000
|
$184.350
|
$100.000
|
$1,000.000
|
$1,100.000
|
$793.000
|
$1,000.000
|
$2,100.000
|
$375.000
|
$1,314.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
50.000
|
$0.250
|
$15.500
|
$1.050
|
$0.250
|
$17.000
|
$15.000
|
$1.750
|
$1.050
|
$1.500
|
$1.000
|
$15.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
3,548.000
|
$0.200
|
$0.310
|
$0.200
|
$0.250
|
$0.240
|
$0.220
|
$0.500
|
$0.180
|
$0.180
|
$0.190
|
$0.300
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
1,774.000
|
$0.100
|
$0.150
|
$0.150
|
$0.250
|
$0.480
|
$0.430
|
$0.500
|
$0.160
|
$0.150
|
$0.160
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
1,774.000
|
$0.100
|
$0.150
|
$0.150
|
$0.250
|
$0.480
|
$0.430
|
$0.500
|
$0.160
|
$0.180
|
$0.160
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
1,152.000
|
$16.000
|
$6.000
|
$10.000
|
$14.000
|
$10.000
|
$41.000
|
$1.500
|
$45.000
|
$0.010
|
$2.000
|
$36.630
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
50.000
|
$0.840
|
$6.500
|
$10.600
|
$15.000
|
$4.000
|
$2.000
|
$8.000
|
$10.600
|
$10.000
|
$10.000
|
$5.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
1,710.000
|
$75.000
|
$80.000
|
$60.000
|
$90.000
|
$74.000
|
$72.000
|
$77.350
|
$71.400
|
$92.000
|
$68.000
|
$102.900
|
|
|
D-GR HMA(SQ) TY-C PG70-22
|
TON
|
1,195.000
|
$104.000
|
$85.000
|
$65.400
|
$90.000
|
$79.000
|
$75.500
|
$83.140
|
$75.700
|
$75.000
|
$72.000
|
$108.150
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
2,196.000
|
$1.500
|
$4.000
|
$3.350
|
$10.000
|
$5.500
|
$4.500
|
$9.720
|
$5.300
|
$5.000
|
$5.750
|
$5.710
|
|
|
CEM STABIL BKFL
|
CY
|
55.000
|
$105.000
|
$125.000
|
$97.200
|
$125.000
|
$165.000
|
$115.000
|
$105.000
|
$200.000
|
$230.000
|
$125.000
|
$166.550
|
|
|
FLOWABLE BACKFILL
|
CY
|
9.000
|
$140.000
|
$135.000
|
$113.650
|
$125.000
|
$150.000
|
$115.000
|
$110.000
|
$200.000
|
$162.000
|
$180.000
|
$150.960
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
346.000
|
$5.380
|
$1.500
|
$1.000
|
$5.000
|
$1.000
|
$2.000
|
$7.000
|
$5.000
|
$5.000
|
$2.000
|
$16.780
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,376.000
|
$16.000
|
$9.000
|
$15.000
|
$15.000
|
$13.000
|
$21.000
|
$27.000
|
$25.000
|
$24.000
|
$27.000
|
$40.290
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
300.000
|
$177.000
|
$175.000
|
$135.000
|
$175.000
|
$145.000
|
$155.000
|
$130.000
|
$150.000
|
$188.000
|
$150.000
|
$192.200
|
|
|
CL C CONC (ABUT)
|
CY
|
38.600
|
$940.000
|
$900.000
|
$1,100.000
|
$750.000
|
$1,200.000
|
$900.000
|
$1,500.000
|
$1,200.000
|
$1,110.000
|
$800.000
|
$1,114.260
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
2,530.000
|
$18.000
|
$14.000
|
$19.000
|
$20.000
|
$16.000
|
$19.000
|
$18.400
|
$18.500
|
$25.500
|
$42.000
|
$25.090
|
|
|
APPROACH SLAB
|
CY
|
64.500
|
$450.000
|
$450.000
|
$418.000
|
$425.000
|
$550.000
|
$500.000
|
$1,200.000
|
$600.000
|
$600.000
|
$750.000
|
$552.540
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
178.500
|
$180.000
|
$180.000
|
$139.750
|
$200.000
|
$185.000
|
$160.000
|
$161.270
|
$220.000
|
$167.000
|
$200.000
|
$163.030
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
357.000
|
$185.000
|
$175.000
|
$153.350
|
$200.000
|
$155.000
|
$160.000
|
$161.270
|
$220.000
|
$167.000
|
$225.000
|
$163.290
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
177.000
|
$427.000
|
$365.000
|
$462.000
|
$450.000
|
$420.000
|
$375.000
|
$416.000
|
$475.000
|
$400.000
|
$650.000
|
$400.450
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
154.000
|
$118.610
|
$105.000
|
$130.000
|
$200.000
|
$136.540
|
$140.000
|
$201.500
|
$125.000
|
$144.000
|
$140.000
|
$125.330
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
75.000
|
$415.000
|
$450.000
|
$425.000
|
$450.000
|
$500.000
|
$450.000
|
$481.000
|
$600.000
|
$450.000
|
$475.000
|
$420.580
|
|
|
RAIL (TY T223)
|
LF
|
152.000
|
$112.000
|
$75.000
|
$152.000
|
$120.000
|
$75.000
|
$110.000
|
$57.200
|
$100.000
|
$180.000
|
$450.000
|
$194.430
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
80.000
|
$100.000
|
$80.000
|
$100.000
|
$100.000
|
$95.800
|
$85.000
|
$73.320
|
$100.000
|
$86.000
|
$110.000
|
$116.190
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
570.000
|
$85.000
|
$35.000
|
$30.450
|
$75.000
|
$60.000
|
$40.000
|
$37.130
|
$35.000
|
$53.000
|
$80.000
|
$57.910
|
|
|
CMP AR (GAL STL DES 5)
|
LF
|
27.000
|
$175.000
|
$75.000
|
$48.400
|
$100.000
|
$140.000
|
$90.000
|
$143.520
|
$100.000
|
$100.000
|
$150.000
|
$184.830
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
253.000
|
$87.490
|
$65.000
|
$88.950
|
$120.000
|
$75.000
|
$65.000
|
$53.950
|
$70.000
|
$127.000
|
$140.000
|
$121.080
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
93.000
|
$109.690
|
$90.000
|
$98.500
|
$160.000
|
$95.000
|
$105.000
|
$90.810
|
$100.000
|
$175.000
|
$155.000
|
$153.750
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$4,000.000
|
$1,800.000
|
$2,700.000
|
$1,800.000
|
$2,000.000
|
$1,200.000
|
$1,700.400
|
$3,000.000
|
$1,740.000
|
$3,000.000
|
$3,149.220
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$4,000.000
|
$2,400.000
|
$3,500.000
|
$3,000.000
|
$2,500.000
|
$1,600.000
|
$1,791.920
|
$4,000.000
|
$4,250.000
|
$3,500.000
|
$5,453.050
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$107,800.000
|
$140,000.000
|
$131,500.000
|
$75,000.000
|
$146,000.000
|
$157,335.910
|
$150,000.000
|
$152,000.000
|
$126,500.000
|
$125,000.000
|
$215,336.180
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$7,100.000
|
$9,500.000
|
$7,900.150
|
$1,500.000
|
$1,000.000
|
$4,000.000
|
$3,000.000
|
$5,000.000
|
$5,500.000
|
$5,000.000
|
$5,046.490
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
87.000
|
$41.000
|
$24.500
|
$33.450
|
$100.000
|
$27.600
|
$30.000
|
$34.920
|
$28.500
|
$38.000
|
$25.000
|
$24.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
87.000
|
$6.000
|
$7.500
|
$9.150
|
$50.000
|
$7.000
|
$10.000
|
$8.240
|
$6.700
|
$8.000
|
$8.000
|
$7.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$14.000
|
$11.000
|
$13.650
|
$15.000
|
$12.500
|
$15.000
|
$34.920
|
$25.100
|
$19.000
|
$11.000
|
$10.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$6.000
|
$2.250
|
$10.500
|
$5.000
|
$5.150
|
$9.000
|
$8.240
|
$6.700
|
$6.200
|
$2.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,404.000
|
$3.000
|
$2.300
|
$2.300
|
$4.000
|
$2.150
|
$3.000
|
$2.800
|
$2.300
|
$3.300
|
$2.500
|
$2.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,404.000
|
$1.000
|
$0.550
|
$0.350
|
$2.000
|
$0.350
|
$0.500
|
$0.460
|
$0.370
|
$1.250
|
$0.600
|
$0.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,291.000
|
$40.000
|
$31.000
|
$32.750
|
$25.000
|
$45.000
|
$30.000
|
$45.000
|
$30.400
|
$50.000
|
$40.000
|
$48.180
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
60.000
|
$50.000
|
$50.000
|
$28.300
|
$75.000
|
$16.000
|
$62.000
|
$35.000
|
$25.900
|
$71.000
|
$55.000
|
$60.570
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,540.000
|
$33.000
|
$20.000
|
$24.750
|
$75.000
|
$14.000
|
$57.000
|
$20.000
|
$48.400
|
$14.000
|
$40.000
|
$61.840
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
200.000
|
$35.000
|
$35.000
|
$18.000
|
$80.000
|
$16.000
|
$60.000
|
$20.000
|
$33.600
|
$16.000
|
$40.000
|
$64.260
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,780.000
|
$7.000
|
$6.000
|
$12.150
|
$15.000
|
$5.000
|
$8.000
|
$8.780
|
$4.300
|
$6.000
|
$5.000
|
$8.530
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
180.000
|
$10.000
|
$6.000
|
$16.300
|
$15.000
|
$5.000
|
$10.000
|
$10.140
|
$9.000
|
$9.000
|
$5.000
|
$18.420
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
60.000
|
$6.000
|
$40.000
|
$13.050
|
$15.000
|
$16.000
|
$15.000
|
$26.520
|
$22.800
|
$14.000
|
$19.000
|
$17.940
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,540.000
|
$6.000
|
$8.000
|
$8.600
|
$15.000
|
$16.000
|
$13.000
|
$7.480
|
$19.400
|
$7.500
|
$15.000
|
$12.060
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
200.000
|
$7.000
|
$8.000
|
$5.750
|
$15.000
|
$16.000
|
$15.000
|
$7.930
|
$16.600
|
$7.500
|
$15.000
|
$20.320
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
440.000
|
$11.000
|
$17.000
|
$23.170
|
$20.000
|
$17.000
|
$18.000
|
$13.000
|
$23.000
|
$19.300
|
$30.000
|
$14.630
|
|
|
DRIVEWAYS (ACP)
|
SY
|
492.000
|
$35.000
|
$32.000
|
$77.700
|
$20.000
|
$46.010
|
$42.000
|
$28.000
|
$51.600
|
$45.000
|
$29.000
|
$48.180
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
438.000
|
$18.000
|
$19.500
|
$19.100
|
$25.000
|
$18.000
|
$19.300
|
$19.800
|
$21.500
|
$19.000
|
$18.000
|
$20.300
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,410.000
|
$1,500.000
|
$1,766.000
|
$1,500.000
|
$1,102.000
|
$1,402.000
|
$1,212.200
|
$1,330.000
|
$1,110.000
|
$1,102.000
|
$1,752.000
|
|
|
SHORT RADIUS
|
LF
|
75.000
|
$32.000
|
$25.000
|
$39.700
|
$50.000
|
$37.390
|
$24.500
|
$41.130
|
$26.000
|
$40.000
|
$38.000
|
$24.500
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$720.000
|
$900.000
|
$900.000
|
$1,500.000
|
$850.000
|
$850.000
|
$935.000
|
$1,090.000
|
$850.000
|
$850.000
|
$1,025.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$1,300.000
|
$4,500.000
|
$8,300.000
|
$8,000.000
|
$8,000.000
|
$8,400.000
|
$7,696.000
|
$6,980.000
|
$7,000.000
|
$8,000.000
|
$6,582.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$900.000
|
$800.000
|
$563.600
|
$500.000
|
$500.000
|
$875.000
|
$1,248.000
|
$238.000
|
$225.000
|
$500.000
|
$225.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
2.000
|
$205.000
|
$80.000
|
$163.300
|
$300.000
|
$250.000
|
$175.000
|
$169.140
|
$265.000
|
$245.000
|
$205.000
|
$175.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$96.000
|
$70.000
|
$26.250
|
$200.000
|
$115.000
|
$150.000
|
$165.000
|
$159.000
|
$119.000
|
$50.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,975.000
|
$0.700
|
$0.660
|
$1.400
|
$0.750
|
$0.650
|
$0.650
|
$0.720
|
$0.690
|
$0.650
|
$0.650
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
11,750.000
|
$0.700
|
$0.660
|
$1.400
|
$0.750
|
$0.650
|
$0.650
|
$0.720
|
$0.690
|
$0.650
|
$0.650
|
$0.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
340.000
|
$1.000
|
$1.750
|
$0.600
|
$0.800
|
$1.000
|
$1.000
|
$1.050
|
$2.350
|
$2.400
|
$1.000
|
$1.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
320.000
|
$1.000
|
$1.750
|
$0.500
|
$0.650
|
$1.000
|
$1.000
|
$1.050
|
$2.450
|
$2.400
|
$1.000
|
$1.600
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,100.000
|
$0.400
|
$0.560
|
$1.150
|
$0.650
|
$0.550
|
$0.550
|
$0.610
|
$0.580
|
$0.550
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
350.000
|
$0.400
|
$1.050
|
$2.100
|
$1.250
|
$1.000
|
$1.000
|
$1.100
|
$1.050
|
$1.000
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,800.000
|
$0.400
|
$0.560
|
$1.150
|
$0.750
|
$0.550
|
$0.550
|
$0.610
|
$0.580
|
$0.550
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY II (W) 4" (SLD)
|
LF
|
3,100.000
|
$0.200
|
$0.260
|
$0.550
|
$0.350
|
$0.250
|
$0.250
|
$0.280
|
$0.260
|
$0.250
|
$0.250
|
$0.250
|
|
RE PM W/RET REQ TY II (Y) 4" (BRK)
|
LF
|
350.000
|
$0.200
|
$0.260
|
$0.550
|
$0.350
|
$0.250
|
$0.250
|
$0.280
|
$0.270
|
$0.250
|
$0.250
|
$0.250
|
|
RE PM W/RET REQ TY II (Y) 4" (SLD)
|
LF
|
1,800.000
|
$0.200
|
$0.260
|
$0.550
|
$0.350
|
$0.250
|
$0.250
|
$0.280
|
$0.260
|
$0.250
|
$0.250
|
$0.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
32.000
|
$5.000
|
$12.500
|
$25.500
|
$15.000
|
$12.000
|
$12.000
|
$13.200
|
$12.700
|
$12.000
|
$12.000
|
$12.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,400.000
|
$0.500
|
$0.500
|
$0.950
|
$0.500
|
$0.440
|
$1.500
|
$0.480
|
$0.930
|
$0.440
|
$1.300
|
$0.440
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
21.000
|
$150.000
|
$200.000
|
$17.250
|
$150.000
|
$165.000
|
$100.000
|
$275.000
|
$90.100
|
$180.000
|
$600.000
|
$162.370
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,194.000
|
$2.000
|
$2.000
|
$1.000
|
$5.000
|
$1.000
|
$1.500
|
$5.000
|
$1.200
|
$0.010
|
$1.050
|
$10.000
|
|
|
ADJUST EXISTING VALVE BOX
|
EA
|
4.000
|
$400.000
|
$750.000
|
$210.500
|
$400.000
|
$1,000.000
|
$320.000
|
$800.000
|
$592.000
|
$1,310.000
|
$700.000
|
$1,500.000
|
|
|
CONCRETE ENCASEMENT AND SADDLES
|
CY
|
67.000
|
$700.000
|
$300.000
|
$272.600
|
$125.000
|
$500.000
|
$450.000
|
$275.000
|
$563.000
|
$180.000
|
$400.000
|
$600.000
|
|
|
ADJUST FIRE HYDRANT
|
EA
|
1.000
|
$1,000.000
|
$2,500.000
|
$1,050.000
|
$1,500.000
|
$2,000.000
|
$1,500.000
|
$2,500.000
|
$6,630.000
|
$4,420.000
|
$2,000.000
|
$3,000.000
|
|
|
SERV LINE BRK/LEAK REPAIR(ALL SIZES)
|
EA
|
2.000
|
$850.000
|
$3,500.000
|
$880.000
|
$900.000
|
$2,000.000
|
$2,500.000
|
$2,500.000
|
$1,180.000
|
$2,000.000
|
$3,500.000
|
$6,000.000
|
|
|
WATER MAIN BREAK / LEAK REPAIR (20")
|
EA
|
2.000
|
$3,200.000
|
$10,500.000
|
$24,500.000
|
$2,000.000
|
$8,000.000
|
$8,000.000
|
$12,000.000
|
$1,420.000
|
$2,700.000
|
$6,100.000
|
$25,000.000
|
|
|
RELAY SHORT SERVICE (3/4")
|
EA
|
1.000
|
$1,300.000
|
$2,300.000
|
$4,000.000
|
$1,200.000
|
$2,100.000
|
$1,200.000
|
$2,000.000
|
$5,210.000
|
$4,000.000
|
$1,500.000
|
$3,500.000
|
|
|
RELAY LONG SERVICE (2")
|
EA
|
1.000
|
$3,000.000
|
$3,500.000
|
$8,500.000
|
$1,800.000
|
$5,500.000
|
$2,500.000
|
$3,000.000
|
$14,100.000
|
$6,830.000
|
$4,400.000
|
$8,500.000
|
|
|
WATER MAIN BREAK / LEAK REPAIR (6")
|
EA
|
2.000
|
$2,000.000
|
$4,500.000
|
$4,000.000
|
$2,000.000
|
$4,000.000
|
$5,000.000
|
$6,000.000
|
$1,180.000
|
$2,000.000
|
$4,000.000
|
$15,000.000
|
|
Totals: |
$1,544,302.960
|
$1,447,520.480
|
$1,539,471.075
|
$1,543,844.750
|
$1,552,749.740
|
$1,622,626.260
|
$1,741,742.915
|
$1,744,491.150
|
$1,752,977.170
|
$1,860,320.650
|
$2,414,165.071
|