Show Job Controls
Bid Cobra

BLANCO US 281 (0252-03-056)

Items: 86

County: BLANCO
Length: 1.3150 MILES
Highway: US 281
District: AUSTIN
Control Number: 0252-03-056
DBE Goal: 0.0%
Project: STP 2026(902)VRU
Guaranty: $50,000.00
Time: 146 WORKING DAYS
Engineer's Estimate: $2,495,198.94
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263226
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00193144
Contract Type: FEDERAL
Project Description: CONSTRUCT PAVED SHOULDER >= 5FT, PROFILE EDGE AND CENTER LINE STRIPING
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (7)
E
Engineer's Estimate
$2,495,198.94
$2,419,095.11
Over/Under Est: -3.05% -$76,103.83
Over/Under Est: -0.24% -$6,107.49
Amt Left: 2.89% $69,996.34
Over/Under Est: 19.66% $490,636.74
Amt Left: 23.43% $566,740.57
Delta: -19.96% -$496,744.23
$2,995,793.49
Over/Under Est: 20.06% $500,594.55
Amt Left: 23.84% $576,698.38
Delta: -0.33% -$9,957.81
$3,165,294.90
Over/Under Est: 26.86% $670,095.96
Amt Left: 30.85% $746,199.79
Delta: -5.66% -$169,501.41
Over/Under Est: 29.68% $740,625.81
Amt Left: 33.76% $816,729.64
Delta: -2.23% -$70,529.85
Over/Under Est: 37.96% $947,195.25
Amt Left: 42.3% $1,023,299.08
Delta: -6.38% -$206,569.44

Bid Items & Bid Tabulations

86 Total 0 of 86
BLANCO  |  US 281  |  AUSTIN  |  0252-03-056  |  08/06/2026 1:00 PM CDT  |  $2,495,198.94  |  STP 2026(902)VRU  |  HAZARD ELIM & SAFETY  |  146 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
CLARK CONSTRUCTION OF TEXAS, INC.
TEXAS MATERIALS GROUP, INC.
MPB, INC.
STX CIVIL
JOE BLAND CONSTRUCTION LLC
E-Z BEL CONSTRUCTION, LLC
PREPARING ROW
STA 76.340 $1,150.000 $761.210 $460.680 $461.000 $334.000 $1,200.000 $1,500.000 $900.000
TREE PROTECTION (INSTALL)
LF 200.000 $12.000 $7.700 $15.000 $8.000 $6.000 $12.000 $20.000 $15.000
TREE PROTECTION (REMOVE)
LF 200.000 $1.400 $7.700 $5.000 $5.000 $3.000 $6.000 $4.000 $5.000
REMOV CONC (MOWSTRIP)
SY 477.000 $23.000 $12.100 $30.000 $45.000 $15.620 $22.000 $25.000 $7.000
REMOV CONC (RIPRAP)
SY 102.000 $20.000 $14.300 $30.000 $25.000 $17.550 $28.000 $30.000 $9.000
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 907.000 $15.000 $5.500 $12.650 $9.000 $19.800 $18.000 $18.000 $7.700
REMOVE STAB BASE AND ASPH PAV (6"-20")
SY 326.000 $15.000 $7.700 $33.430 $35.000 $27.650 $25.000 $16.000 $12.300
EXCAV (ROADWAY)
CY 10,631.000 $13.000 $19.800 $14.370 $28.000 $24.300 $16.000 $28.000 $40.000
EMBANK (FNL)(OC)(TY B)
CY 2,517.000 $15.000 $19.800 $25.480 $18.500 $16.050 $18.000 $7.000 $2.800
EMBANK (FNL)(OC)(TY C)
CY 5.000 $17.000 $133.100 $150.000 $98.000 $108.100 $150.000 $330.000 $30.000
BACKFILL (TY A)
STA 28.000 $220.000 $154.000 $1,129.080 $450.000 $140.170 $900.000 $1,100.000 $1,400.000
FURN & PLACE TOPSOIL (4")
SY 24,136.000 $1.750 $1.590 $2.500 $6.000 $1.400 $4.500 $1.500 $1.100
DRILL SEED (PERM_RURAL_CLAY)
SY 24,136.000 $0.200 $0.230 $0.220 $0.170 $0.180 $0.750 $0.250 $0.220
VEGETATIVE WATERING
TGL 406.000 $13.000 $23.100 $55.000 $65.000 $125.000 $60.000 $25.000 $50.000
SOIL RET BLKT(SL_MOD_CLAY_LONG)
SY 21,797.000 $1.750 $1.430 $1.350 $0.650 $0.700 $2.250 $1.500 $1.350
SOIL RET BLKT(CHAN_PERM_6 PSF)
SY 2,339.000 $1.750 $1.850 $1.750 $2.920 $3.150 $5.500 $2.000 $1.750
WILDFLOWER SEEDING
AC 4.980 $1,100.000 $2,190.490 $2,075.000 $2,176.580 $2,330.000 $400.000 $2,500.000 $2,075.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 2,514.000 $60.000 $55.660 $58.630 $65.000 $84.350 $95.000 $120.000 $93.300
PRIME COAT (AE-P)
GAL 1,908.000 $5.000 $5.170 $5.100 $5.500 $3.950 $5.750 $4.000 $3.650
D-GR HMA TY-B PG64-22
TON 1,428.000 $98.000 $97.570 $97.000 $117.000 $118.770 $115.000 $125.000 $111.000
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 367.000 $126.000 $124.480 $125.750 $155.000 $163.000 $148.000 $175.000 $152.000
D-GR HMA TY-D PG76-22
TON 718.000 $128.500 $126.680 $135.900 $140.000 $135.000 $154.000 $142.000 $126.000
TOM-C PG76-22 SAC-B
TON 2,144.000 $135.000 $129.100 $121.570 $168.000 $167.000 $172.000 $175.000 $155.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 4,453.000 $33.000 $32.920 $30.200 $38.000 $39.100 $46.000 $40.000 $36.500
PLANE ASPH CONC PAV(0" TO 1" MICRO)
SY 2,130.000 $1.650 $3.300 $2.000 $8.300 $5.350 $7.500 $6.000 $5.000
TEMPORARY SPL SHORING
SF 3,860.000 $30.000 $38.630 $35.000 $28.000 $58.850 $28.000 $32.000 $25.000
RIPRAP (CONC)(CL B)(5 IN)
CY 23.000 $750.000 $663.650 $900.000 $753.000 $635.000 $950.000 $850.000 $1,900.000
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $700.000 $570.000 $900.000 $630.470 $745.000 $700.000 $760.000 $900.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 529.000 $180.000 $125.000 $255.000 $276.300 $240.000 $130.000 $145.000 $480.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 14.000 $800.000 $938.220 $850.000 $1,473.750 $1,130.000 $1,100.000 $3,650.000 $3,600.000
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
LF 6.000 $2,000.000 $3,311.360 $3,000.000 $5,741.000 $6,230.000 $3,200.000 $15,325.000 $15,000.000
RC PIPE (CL III)(18 IN)
LF 119.000 $110.000 $68.430 $62.000 $251.080 $105.000 $120.000 $250.000 $340.000
RC PIPE (CL III)(36 IN)
LF 10.000 $250.000 $496.700 $450.000 $281.130 $175.000 $250.000 $650.000 $670.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $12,500.000 $9,934.090 $9,000.000 $9,737.630 $11,825.000 $9,500.000 $12,500.000 $10,800.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $15,000.000 $6,622.730 $6,000.000 $14,232.730 $25,780.000 $14,000.000 $8,000.000 $45,000.000
WINGWALL (PW - 1) (HW=15 FT)
EA 1.000 $50,000.000 $55,189.400 $50,000.000 $75,834.860 $100,600.000 $65,000.000 $56,500.000 $125,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $1,480.000 $1,048.600 $950.000 $2,461.880 $2,375.000 $1,600.000 $3,150.000 $4,800.000
REMOV STR (WINGWALL)
EA 4.000 $2,650.000 $2,207.580 $2,000.000 $3,762.500 $250.000 $3,500.000 $2,650.000 $6,500.000
REMOV STR (HEADWALL)
EA 1.000 $2,500.000 $2,207.580 $2,000.000 $3,452.500 $510.000 $2,500.000 $2,650.000 $5,500.000
REMOV STR (PIPE)
LF 31.000 $25.000 $38.630 $35.000 $248.770 $14.250 $45.000 $60.000 $85.000
MOBILIZATION
LS 1.000 $176,850.000 $191,739.110 $177,133.900 $80,000.000 $215,000.000 $195,000.000 $125,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,500.000 $9,244.620 $3,180.000 $7,500.000 $1,500.000 $9,500.000 $1,500.000 $6,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $3,570.330 $6,250.000 $15,000.000 $78.000 $9,000.000 $15,000.000 $8,000.000
TMA (STATIONARY)
DAY 200.000 $208.000 $102.010 $125.750 $225.000 $100.000 $350.000 $350.000 $350.000
TMA (MOBILE OPERATION)
DAY 30.000 $225.000 $255.020 $178.950 $250.000 $350.000 $700.000 $875.000 $650.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 109.000 $40.000 $42.230 $40.000 $47.730 $43.400 $28.000 $45.000 $40.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 273.000 $65.000 $50.140 $47.500 $45.500 $58.400 $32.000 $55.000 $47.500
ROCK FILTER DAMS (REMOVE)
LF 382.000 $12.000 $21.110 $20.000 $15.640 $47.650 $9.000 $25.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,661.000 $5.000 $2.900 $2.750 $4.220 $4.150 $2.750 $6.000 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,661.000 $2.500 $1.060 $1.000 $1.300 $1.060 $0.750 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 11,050.000 $5.000 $3.690 $3.500 $5.910 $7.250 $4.250 $9.000 $3.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 11,050.000 $1.500 $1.060 $1.000 $1.300 $1.060 $1.000 $2.000 $1.000
DRIVEWAYS (ACP)
SY 482.000 $55.000 $48.400 $46.710 $106.000 $75.000 $90.000 $40.000 $89.000
TURNOUTS (ACP)
SY 34.000 $95.000 $96.800 $357.830 $155.000 $135.000 $415.000 $50.000 $96.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,135.000 $25.000 $24.500 $25.000 $25.380 $27.160 $32.000 $28.000 $25.890
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,500.000 $1,350.000 $1,300.000 $1,302.650 $1,395.000 $1,100.000 $1,550.000 $1,458.000
REMOVE METAL BEAM GUARD FENCE
LF 900.000 $2.500 $2.500 $2.000 $6.000 $6.420 $6.000 $2.500 $3.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,150.000 $3,300.000 $3,500.000 $3,736.730 $4,000.000 $3,900.000 $4,150.000 $3,399.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $250.000 $250.000 $150.000 $436.260 $467.000 $450.000 $175.000 $375.000
WIRE FENCE (TY C)
LF 380.000 $25.000 $18.000 $15.000 $40.000 $19.260 $14.000 $30.000 $27.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000 $365.000 $250.000 $500.000 $300.000 $325.000 $900.000 $465.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $700.000 $850.000 $645.000 $825.000 $802.500 $1,000.000 $1,000.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $750.000 $900.000 $685.000 $780.000 $909.500 $850.000 $1,100.000 $850.000
REMOVE SM RD SN SUP&AM
EA 5.000 $110.000 $125.000 $125.000 $125.000 $107.000 $250.000 $165.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 11.000 $70.000 $90.000 $85.000 $160.000 $160.500 $120.000 $180.000 $150.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 16.000 $40.000 $17.000 $75.000 $51.950 $37.450 $95.000 $36.000 $35.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 8.000 $120.000 $56.000 $75.000 $135.000 $107.000 $150.000 $85.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 3,827.000 $0.400 $0.250 $0.250 $0.250 $0.270 $0.550 $0.250 $0.250
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 15,269.000 $0.280 $0.220 $0.220 $0.220 $0.270 $0.500 $0.250 $0.250
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 15,269.000 $0.280 $0.220 $0.220 $0.220 $0.270 $0.500 $0.250 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,144.000 $1.800 $1.600 $1.250 $1.200 $1.500 $2.500 $1.500 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,489.000 $1.300 $1.600 $1.250 $1.200 $1.500 $2.500 $1.500 $1.000
RE PM TY II (W) 6" (BRK)
LF 3,814.000 $0.850 $0.330 $0.330 $0.330 $0.270 $0.550 $0.250 $0.250
RE PM TY II (W) 6" (SLD)
LF 15,257.000 $0.400 $0.300 $0.300 $0.300 $0.270 $0.500 $0.250 $0.250
RE PM TY II (Y) 6" (SLD)
LF 15,357.000 $0.550 $0.300 $0.300 $0.300 $0.270 $0.500 $0.250 $0.250
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
LF 15,257.000 $0.800 $1.000 $1.000 $1.000 $0.890 $1.550 $1.000 $0.830
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
LF 15,357.000 $0.800 $1.000 $1.000 $1.000 $0.890 $1.550 $1.000 $0.830
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 3,814.000 $0.850 $1.050 $1.050 $1.050 $0.700 $1.100 $1.000 $0.650
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
LF 14,905.000 $3.000 $3.000 $3.000 $3.000 $4.010 $4.000 $4.500 $3.750
PREFAB PM TY C (W)(12")(SLD)
LF 12.000 $9.000 $15.000 $15.000 $15.000 $5.350 $25.000 $5.500 $5.000
PRFB RUMBLE STRIP (BLK)(1')(EDGELINE)
LF 14,950.000 $3.000 $3.550 $3.550 $3.550 $3.750 $4.000 $4.000 $3.500
REFL PAV MRKR TY I-C
EA 191.000 $5.000 $6.000 $6.000 $6.000 $4.820 $8.000 $5.250 $4.500
REFL PAV MRKR TY II-A-A
EA 192.000 $5.000 $6.500 $6.500 $6.500 $4.820 $8.000 $5.250 $4.500
ELIM EXT PM & MRKS (6")
LF 78,255.000 $0.350 $0.160 $0.160 $0.160 $0.270 $1.100 $0.250 $0.250
BONDING COURSE
GAL 5,662.000 $4.000 $4.400 $4.450 $4.500 $4.000 $5.250 $4.250 $3.700
TEMP SPEED MONITOR SYS
EA 2.000 $15,000.000 $5,100.470 $33,750.000 $23,000.000 $7,000.000 $15,000.000 $23,500.000 $5,000.000
Totals: $2,495,198.940 $2,419,095.112 $2,489,091.451 $2,985,835.678 $2,995,793.490 $3,165,294.900 $3,235,824.750 $3,442,394.190
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $7,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $35,000.00
Total: $67,000.00