PREPARING ROW
|
STA
|
299.300
|
$2,000.000
|
$507.800
|
$426.691
|
$900.000
|
$220.000
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
3,661.000
|
$5.000
|
$8.920
|
$10.076
|
$8.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
11,132.000
|
$7.000
|
$11.150
|
$9.843
|
$16.000
|
$13.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
8,677.000
|
$5.000
|
$8.920
|
$10.934
|
$8.000
|
$11.000
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
80.000
|
$100.000
|
$55.750
|
$95.035
|
$90.000
|
$77.000
|
|
|
FURNISHING AND PLACING TOPSOIL (3")
|
SY
|
236,560.000
|
$1.100
|
$1.120
|
$0.750
|
$0.750
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
236,560.000
|
$0.100
|
$0.140
|
$0.080
|
$0.110
|
$0.150
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
236,546.000
|
$0.300
|
$0.230
|
$0.130
|
$0.320
|
$0.250
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
236,546.000
|
$0.300
|
$0.230
|
$0.130
|
$0.320
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
3,982.300
|
$10.000
|
$6.000
|
$18.250
|
$20.000
|
$25.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
7,697.000
|
$45.000
|
$55.320
|
$58.446
|
$61.000
|
$54.500
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
6,927.000
|
$4.000
|
$4.120
|
$4.079
|
$3.700
|
$4.000
|
|
|
ASPH (TIER II)
|
GAL
|
35,158.000
|
$3.500
|
$2.950
|
$2.968
|
$3.420
|
$3.200
|
|
|
AGGR(TY-D GR-4 SAC-B)
|
CY
|
771.000
|
$40.000
|
$87.610
|
$71.837
|
$152.000
|
$62.000
|
|
|
D-GR HMA(SQ) TY-D PG70-22
|
TON
|
3,456.000
|
$100.000
|
$74.940
|
$81.935
|
$74.000
|
$92.000
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
171.000
|
$103.000
|
$104.700
|
$133.553
|
$183.000
|
$130.000
|
|
|
TACK COAT
|
GAL
|
139.000
|
$3.000
|
$3.120
|
$18.941
|
$3.000
|
$7.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
3,325.000
|
$30.420
|
$34.680
|
$39.163
|
$36.000
|
$42.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
667.000
|
$1.000
|
$10.040
|
$16.233
|
$6.000
|
$9.000
|
|
|
CEM STABIL BKFL
|
CY
|
159.000
|
$75.000
|
$195.000
|
$144.200
|
$134.000
|
$160.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
101.000
|
$3.500
|
$39.000
|
$5.150
|
$21.000
|
$27.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,355.000
|
$20.000
|
$19.650
|
$20.600
|
$30.000
|
$35.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
60.000
|
$130.000
|
$300.000
|
$206.000
|
$300.000
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
277.000
|
$450.000
|
$525.000
|
$453.200
|
$500.000
|
$515.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
2.000
|
$75.000
|
$165.000
|
$61.800
|
$450.000
|
$200.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
10.000
|
$250.000
|
$161.000
|
$154.500
|
$300.000
|
$200.000
|
|
|
CONC BOX CULV (10 FT X 7 FT)(EXTEND)
|
LF
|
75.000
|
$900.000
|
$742.000
|
$1,236.000
|
$1,300.000
|
$1,100.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
53.000
|
$1,000.000
|
$785.000
|
$1,442.000
|
$2,750.790
|
$1,100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
529.000
|
$55.000
|
$78.550
|
$51.500
|
$58.000
|
$72.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
95.000
|
$80.000
|
$100.000
|
$72.100
|
$75.000
|
$90.000
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
2.000
|
$10,000.000
|
$27,750.000
|
$18,540.000
|
$35,000.000
|
$20,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$22,000.000
|
$16,590.000
|
$28,840.000
|
$15,000.000
|
$23,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
6.000
|
$30,000.000
|
$16,855.000
|
$39,140.000
|
$15,000.000
|
$30,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
42.000
|
$800.000
|
$1,555.000
|
$1,236.000
|
$1,600.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
10.000
|
$1,400.000
|
$2,505.000
|
$1,339.000
|
$1,600.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,200.000
|
$1,865.000
|
$1,545.000
|
$1,700.000
|
$1,600.000
|
|
|
SET (TY II) (30 IN) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$1,900.000
|
$2,780.000
|
$2,575.000
|
$2,600.000
|
$2,300.000
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
6.000
|
$1,200.000
|
$3,500.000
|
$2,781.000
|
$2,600.000
|
$2,300.000
|
|
|
SET (TY II) (36 IN) (CMP) (4: 1) (C)
|
EA
|
10.000
|
$2,000.000
|
$4,160.000
|
$4,635.000
|
$5,000.000
|
$3,400.000
|
|
|
SET (TY II) (48 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$5,000.000
|
$5,620.000
|
$7,210.000
|
$4,600.000
|
$4,600.000
|
|
|
SET (TY II) (66 IN) (CMP) (2: 1) (P)
|
EA
|
2.000
|
$7,000.000
|
$5,350.000
|
$10,300.000
|
$6,000.000
|
$8,000.000
|
|
|
SET (TY II) (DES 1) (CMP) (3: 1) (C)
|
EA
|
1.000
|
$8,000.000
|
$6,580.000
|
$1,802.500
|
$8,000.000
|
$1,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
20.000
|
$2,000.000
|
$1,485.000
|
$1,545.000
|
$50.000
|
$1,600.000
|
|
|
REMOV STR (SET)
|
EA
|
9.000
|
$350.000
|
$750.000
|
$412.000
|
$500.000
|
$400.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$1,000.000
|
$2,900.000
|
$1,236.000
|
$3,500.000
|
$1,600.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
3.000
|
$900.000
|
$1,145.000
|
$1,236.000
|
$3,500.000
|
$1,600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
751.000
|
$12.000
|
$32.500
|
$10.300
|
$20.000
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$290,503.000
|
$414,850.570
|
$562,566.382
|
$347,500.000
|
$475,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$8,000.000
|
$11,528.000
|
$4,921.542
|
$12,000.000
|
$2,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,560.000
|
$25.000
|
$18.360
|
$23.021
|
$23.000
|
$21.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,560.000
|
$7.000
|
$6.390
|
$8.745
|
$5.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
25,305.000
|
$2.500
|
$2.950
|
$2.318
|
$4.000
|
$3.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
25,305.000
|
$0.500
|
$0.480
|
$0.258
|
$0.250
|
$0.750
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,112.000
|
$30.000
|
$37.840
|
$42.455
|
$52.000
|
$40.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,637.500
|
$20.000
|
$21.820
|
$20.764
|
$22.000
|
$25.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
28.000
|
$2,775.000
|
$2,913.000
|
$2,726.600
|
$3,000.000
|
$3,200.000
|
|
|
WIRE FENCE (TY B)
|
LF
|
200.000
|
$25.000
|
$19.000
|
$25.750
|
$32.000
|
$11.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
38.000
|
$450.000
|
$515.000
|
$485.666
|
$500.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$600.000
|
$598.000
|
$657.367
|
$600.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
2.000
|
$900.000
|
$895.000
|
$968.612
|
$1,000.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
42.000
|
$80.000
|
$83.000
|
$77.250
|
$50.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
|
EA
|
130.000
|
$65.000
|
$47.000
|
$43.713
|
$45.000
|
$65.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
27.000
|
$90.000
|
$65.000
|
$77.199
|
$80.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
68.000
|
$25.000
|
$20.000
|
$17.459
|
$20.000
|
$32.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
11,960.000
|
$1.000
|
$1.060
|
$1.385
|
$1.000
|
$0.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
58.000
|
$6.000
|
$14.100
|
$8.240
|
$15.000
|
$17.250
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
59,885.000
|
$0.150
|
$0.050
|
$0.113
|
$0.050
|
$0.140
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
58.000
|
$3.000
|
$2.000
|
$5.150
|
$2.150
|
$5.500
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
2,670.000
|
$0.150
|
$0.150
|
$0.113
|
$0.160
|
$0.150
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
47,905.000
|
$0.150
|
$0.130
|
$0.113
|
$0.140
|
$0.150
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
59,885.000
|
$0.500
|
$0.590
|
$0.659
|
$0.630
|
$0.640
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
47,905.000
|
$0.500
|
$0.590
|
$0.659
|
$0.630
|
$0.640
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,670.000
|
$0.300
|
$0.470
|
$0.371
|
$0.510
|
$1.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
751.000
|
$3.000
|
$4.000
|
$4.120
|
$4.300
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$15,000.000
|
$17,560.000
|
$11,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$185.000
|
$200.000
|
$567.000
|
$200.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
92.000
|
$55.000
|
$40.000
|
$54.000
|
$38.000
|
$25.000
|
|
Totals: |
$3,895,929.600
|
$3,837,576.300
|
$4,030,108.732
|
$4,247,916.970
|
$4,283,184.350
|