PREPARING ROW
|
STA
|
8.000
|
$1,219.100
|
$3,000.000
|
$1,950.000
|
$920.000
|
$1,100.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
300.000
|
$350.000
|
$250.000
|
$171.000
|
$190.000
|
$260.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
20,027.000
|
$65.000
|
$63.000
|
$59.500
|
$59.000
|
$58.000
|
|
|
PLANE ASPH CONC PAV(MICRO-MLLING)(1")
|
SY
|
104,551.000
|
$1.500
|
$1.250
|
$1.650
|
$1.250
|
$2.000
|
|
|
CEM STABIL BKFL
|
CY
|
149.000
|
$188.350
|
$225.000
|
$300.000
|
$210.000
|
$305.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
84.000
|
$102.200
|
$150.000
|
$150.000
|
$260.000
|
$210.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
122.000
|
$116.000
|
$15.000
|
$10.000
|
$21.000
|
$12.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
296.000
|
$64.800
|
$25.000
|
$80.000
|
$52.000
|
$20.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
16.700
|
$251.700
|
$300.000
|
$300.000
|
$210.000
|
$365.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
44.000
|
$497.300
|
$800.000
|
$675.000
|
$765.000
|
$825.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
116.000
|
$401.350
|
$500.000
|
$500.000
|
$842.000
|
$610.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
64.000
|
$627.600
|
$750.000
|
$750.000
|
$1,000.000
|
$915.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$17,766.000
|
$25,000.000
|
$9,500.000
|
$8,400.000
|
$11,600.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$21,278.000
|
$27,500.000
|
$11,000.000
|
$10,500.000
|
$13,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
202.000
|
$20.800
|
$25.000
|
$15.000
|
$63.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$468,369.810
|
$315,000.000
|
$340,600.000
|
$379,000.000
|
$405,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$7,000.000
|
$5,000.000
|
$2,500.000
|
$10,000.000
|
$7,250.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
900.000
|
$4.400
|
$5.000
|
$6.000
|
$9.750
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
900.000
|
$1.600
|
$1.000
|
$1.000
|
$2.100
|
$3.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.000
|
$3,812.000
|
$7,500.000
|
$7,900.000
|
$8,500.000
|
$8,000.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
240.000
|
$20.700
|
$50.000
|
$47.000
|
$48.000
|
$75.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
240.000
|
$11.500
|
$50.000
|
$47.000
|
$40.000
|
$30.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
240.000
|
$17.000
|
$50.000
|
$47.000
|
$46.000
|
$75.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
58,256.300
|
$0.200
|
$0.200
|
$0.160
|
$0.300
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
29,128.150
|
$0.200
|
$0.200
|
$0.200
|
$0.300
|
$0.350
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
625.000
|
$34.800
|
$40.000
|
$26.500
|
$27.900
|
$35.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,412.000
|
$1,500.000
|
$1,100.000
|
$1,150.000
|
$1,350.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$2.200
|
$5.000
|
$3.000
|
$3.150
|
$3.750
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,150.000
|
$3,500.000
|
$2,800.000
|
$2,950.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$286.000
|
$500.000
|
$250.000
|
$265.000
|
$310.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,015.000
|
$2,500.000
|
$1,650.810
|
$3,000.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,600.000
|
$1,500.000
|
$1,239.470
|
$1,150.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$5,000.000
|
$7,500.000
|
$8,736.000
|
$7,500.000
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
7.000
|
$433.000
|
$800.000
|
$775.000
|
$1,000.000
|
$625.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$40.000
|
$50.000
|
$45.000
|
$50.000
|
$55.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
4.000
|
$84.000
|
$150.000
|
$125.000
|
$100.000
|
$90.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,200.000
|
$0.750
|
$2.000
|
$0.550
|
$2.110
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
406.000
|
$0.750
|
$1.000
|
$1.000
|
$1.050
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
112.000
|
$4.300
|
$2.000
|
$8.000
|
$2.110
|
$8.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
10,860.000
|
$0.550
|
$0.500
|
$0.650
|
$0.470
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
57,920.000
|
$0.450
|
$0.500
|
$0.550
|
$0.470
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
102.000
|
$1.600
|
$1.500
|
$0.900
|
$1.450
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,081.000
|
$1.600
|
$1.500
|
$0.900
|
$1.450
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
203.000
|
$1.100
|
$1.000
|
$1.000
|
$1.050
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
56.000
|
$11.050
|
$40.000
|
$7.400
|
$31.590
|
$7.400
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
58,100.000
|
$0.900
|
$0.800
|
$0.680
|
$0.760
|
$0.680
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
5,430.000
|
$1.000
|
$0.800
|
$0.750
|
$0.760
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
28,960.000
|
$0.950
|
$0.800
|
$0.680
|
$0.760
|
$0.680
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
657.000
|
$7.750
|
$5.000
|
$5.000
|
$5.250
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
13.000
|
$6.750
|
$15.000
|
$5.000
|
$12.500
|
$5.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
5,747.000
|
$135.000
|
$120.000
|
$142.000
|
$130.000
|
$122.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
11,505.000
|
$150.000
|
$110.000
|
$121.000
|
$119.000
|
$122.000
|
|
|
TACK COAT
|
GAL
|
10,452.000
|
$4.000
|
$3.500
|
$3.050
|
$0.010
|
$0.010
|
|
|
UNDERSEAL COURSE
|
GAL
|
26,135.000
|
$3.100
|
$4.000
|
$0.010
|
$0.010
|
$0.010
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,772.000
|
$7,500.000
|
$10,000.000
|
$15,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$150.000
|
$275.000
|
$261.000
|
$500.000
|
$0.010
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
360.000
|
$70.000
|
$50.000
|
$20.000
|
$1.000
|
$0.010
|
|
Totals: |
$5,257,067.940
|
$4,557,803.140
|
$4,574,093.698
|
$4,579,854.865
|
$4,600,469.498
|