PREPARING ROW
|
STA
|
1.000
|
$5,000.000
|
$5,000.000
|
$1,600.000
|
$2,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
14.000
|
$12.000
|
$35.000
|
$55.000
|
$45.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
75.000
|
$15.000
|
$26.000
|
$28.000
|
$17.000
|
|
|
REMOVE CONC (MISC)
|
EA
|
1.000
|
$1,000.000
|
$2,000.000
|
$4,200.000
|
$300.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
182.000
|
$15.000
|
$11.000
|
$32.000
|
$8.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,945.000
|
$15.000
|
$35.000
|
$30.000
|
$35.000
|
|
|
BLOCK SODDING
|
SY
|
21,661.000
|
$3.600
|
$3.500
|
$4.500
|
$3.450
|
|
|
VEGETATIVE WATERING
|
MG
|
176.000
|
$13.000
|
$35.000
|
$25.000
|
$30.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
2,295.000
|
$100.000
|
$101.000
|
$100.000
|
$108.000
|
|
|
D-GR HMA(SQ) TY-C SAC-B PG64-22
|
TON
|
2,897.000
|
$120.000
|
$95.000
|
$102.000
|
$112.000
|
|
|
TACK COAT
|
GAL
|
3,369.000
|
$3.000
|
$2.750
|
$4.500
|
$2.850
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
11.000
|
$480.000
|
$1,250.000
|
$1,080.000
|
$2,500.000
|
|
|
CL C CONC (CURB)
|
CY
|
13.000
|
$910.000
|
$1,675.000
|
$950.000
|
$1,500.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
100.000
|
$400.000
|
$495.000
|
$470.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
50.000
|
$435.000
|
$495.000
|
$500.000
|
$650.000
|
|
|
RIPRAP (STONE TY R)(GROUT)(24 IN)
|
CY
|
51.000
|
$200.000
|
$375.000
|
$450.000
|
$300.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
28.000
|
$800.000
|
$1,000.000
|
$900.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
44.000
|
$60.000
|
$150.000
|
$105.000
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
10.000
|
$65.000
|
$400.000
|
$124.000
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
32.000
|
$90.000
|
$300.000
|
$160.000
|
$200.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$3,400.000
|
$4,000.000
|
$3,700.000
|
$4,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
2.000
|
$15,500.000
|
$13,500.000
|
$14,800.000
|
$18,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$14,000.000
|
$10,500.000
|
$18,900.000
|
$20,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
3.000
|
$1,150.000
|
$1,250.000
|
$920.000
|
$950.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,375.000
|
$1,150.000
|
$1,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,700.000
|
$1,800.000
|
$2,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$3,500.000
|
$1,950.000
|
$2,100.000
|
$3,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,000.000
|
$1,850.000
|
$2,630.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
15.000
|
$16.000
|
$25.000
|
$55.000
|
$35.000
|
|
|
REMOVE STR (DAMAGED BEAM)
|
EA
|
1.000
|
$1,000.000
|
$1,200.000
|
$2,100.000
|
$5,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$121,148.000
|
$150,000.000
|
$139,750.190
|
$179,200.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$6,000.000
|
$13,000.000
|
$10,000.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
825.000
|
$26.000
|
$35.000
|
$25.000
|
$25.750
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
825.000
|
$11.000
|
$9.250
|
$5.000
|
$9.850
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,410.000
|
$3.500
|
$5.000
|
$3.000
|
$1.850
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,410.000
|
$0.500
|
$0.710
|
$1.000
|
$0.750
|
|
|
CONC CURB (RIBBON)
|
LF
|
64.000
|
$60.000
|
$50.000
|
$70.000
|
$100.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
711.000
|
$31.000
|
$50.000
|
$40.000
|
$34.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
248.000
|
$70.000
|
$85.000
|
$85.000
|
$125.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
999.000
|
$33.000
|
$55.000
|
$50.000
|
$30.000
|
|
|
TURNOUTS (ACP)
|
SY
|
92.000
|
$36.000
|
$100.000
|
$120.000
|
$154.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
4,102.000
|
$0.350
|
$3.000
|
$3.000
|
$2.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
912.500
|
$27.000
|
$24.000
|
$32.000
|
$21.750
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
37.500
|
$67.000
|
$80.000
|
$85.000
|
$72.350
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
558.000
|
$2.600
|
$2.200
|
$2.500
|
$2.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,830.000
|
$2,900.000
|
$3,210.000
|
$2,674.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$240.000
|
$225.000
|
$240.000
|
$200.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
3.000
|
$270.000
|
$225.000
|
$240.000
|
$201.730
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
2.000
|
$300.000
|
$290.000
|
$310.000
|
$257.980
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
6.000
|
$415.000
|
$428.000
|
$462.000
|
$385.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
14.000
|
$300.000
|
$375.000
|
$405.000
|
$337.600
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
36.000
|
$340.000
|
$390.000
|
$420.000
|
$350.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$80.000
|
$100.000
|
$120.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
8.000
|
$80.000
|
$75.000
|
$81.000
|
$67.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$40.000
|
$35.000
|
$39.000
|
$31.950
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
889.000
|
$0.700
|
$1.400
|
$1.000
|
$1.200
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
83.000
|
$3.000
|
$13.000
|
$14.500
|
$12.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
18,355.000
|
$0.300
|
$0.720
|
$0.080
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
160.000
|
$0.300
|
$1.390
|
$1.500
|
$1.250
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
17,555.000
|
$0.300
|
$0.770
|
$0.850
|
$0.690
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
230.000
|
$4.000
|
$6.500
|
$7.200
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$7,800.000
|
$1,500.000
|
$5,850.000
|
$1.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$3.500
|
$29.000
|
$32.000
|
$26.500
|
|
|
TMA (STATIONARY)
|
DAY
|
69.000
|
$180.000
|
$225.000
|
$250.000
|
$235.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
256.000
|
$50.000
|
$35.000
|
$55.000
|
$45.000
|
|
Totals: |
$1,369,154.400
|
$1,514,248.150
|
$1,536,783.340
|
$1,616,872.550
|