PREPARING ROW
|
STA
|
18.480
|
$5,857.620
|
$10,000.000
|
$12,000.000
|
$29,400.000
|
$3,650.000
|
$41,863.460
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
624.000
|
$20.000
|
$14.000
|
$21.050
|
$15.630
|
$24.500
|
$21.250
|
|
|
REMOV CONC (CURB OR CURB & GUTTER)
|
LF
|
175.000
|
$52.080
|
$6.500
|
$19.640
|
$7.410
|
$11.000
|
$9.350
|
|
|
REMOV CONC (APPR SLAB)
|
SY
|
223.000
|
$95.000
|
$26.000
|
$24.000
|
$8.440
|
$165.000
|
$318.710
|
|
|
REMOV CONC (FLUME)
|
SY
|
104.000
|
$150.000
|
$18.000
|
$30.600
|
$15.440
|
$31.310
|
$26.610
|
|
|
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
6,767.000
|
$6.320
|
$6.000
|
$5.400
|
$1.750
|
$40.000
|
$3.260
|
|
|
EXCAV (ROADWAY)
|
CY
|
1,817.000
|
$15.000
|
$25.000
|
$25.700
|
$15.000
|
$23.797
|
$15.910
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
6,849.000
|
$37.650
|
$42.000
|
$23.480
|
$25.440
|
$26.000
|
$41.250
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
9,168.000
|
$2.090
|
$2.500
|
$5.900
|
$0.310
|
$19.250
|
$3.400
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
9,168.000
|
$0.140
|
$0.380
|
$0.460
|
$0.550
|
$0.400
|
$0.340
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
9,168.000
|
$0.090
|
$0.380
|
$0.400
|
$0.500
|
$0.275
|
$0.250
|
|
|
VEGETATIVE WATERING
|
TGL
|
150.000
|
$80.000
|
$50.000
|
$50.140
|
$36.890
|
$34.500
|
$31.090
|
|
|
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
|
SY
|
788.000
|
$1.170
|
$2.750
|
$2.400
|
$2.000
|
$37.700
|
$45.330
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
2,265.000
|
$70.000
|
$95.000
|
$47.090
|
$62.750
|
$50.000
|
$39.960
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
215.000
|
$348.180
|
$355.000
|
$251.100
|
$316.280
|
$360.900
|
$312.510
|
|
|
LIME TRT (EXIST MATL)(12")
|
SY
|
7,957.000
|
$3.500
|
$8.000
|
$5.250
|
$6.950
|
$3.800
|
$3.590
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
9,548.000
|
$2.350
|
$4.750
|
$3.350
|
$5.000
|
$14.000
|
$11.200
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
796.000
|
$3.000
|
$6.600
|
$6.520
|
$5.000
|
$2.875
|
$3.400
|
|
|
ASPH (CRS-2)
|
GAL
|
2,387.000
|
$4.580
|
$6.600
|
$4.970
|
$5.000
|
$4.760
|
$4.530
|
|
|
AGGR (TY-D OR L, GR-4)
|
CY
|
59.000
|
$218.290
|
$450.000
|
$367.430
|
$350.000
|
$197.500
|
$255.120
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
1,750.000
|
$120.600
|
$210.000
|
$139.210
|
$155.000
|
$135.500
|
$228.910
|
|
|
TACK COAT
|
GAL
|
680.000
|
$2.600
|
$6.750
|
$3.730
|
$5.000
|
$4.480
|
$3.810
|
|
|
CEM STABIL BKFL
|
CY
|
224.000
|
$232.500
|
$220.000
|
$274.340
|
$194.140
|
$300.000
|
$247.300
|
|
|
TEMPORARY SPL SHORING
|
SF
|
6,057.000
|
$37.500
|
$10.500
|
$28.760
|
$71.100
|
$60.000
|
$32.020
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
114.000
|
$151.190
|
$200.000
|
$179.640
|
$132.010
|
$375.000
|
$162.870
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
602.000
|
$324.080
|
$265.000
|
$248.300
|
$189.460
|
$550.000
|
$237.340
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
240.000
|
$949.500
|
$500.000
|
$737.830
|
$357.770
|
$534.300
|
$451.800
|
|
|
CL B CONC (FLUME)
|
CY
|
44.000
|
$909.180
|
$750.000
|
$420.000
|
$569.580
|
$1,214.365
|
$1,032.090
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
61.800
|
$1,711.330
|
$1,900.000
|
$1,450.000
|
$780.000
|
$1,767.750
|
$1,188.860
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
19.400
|
$1,650.000
|
$2,500.000
|
$1,349.620
|
$1,605.310
|
$1,724.630
|
$3,187.120
|
|
|
CL C CONC (CAP)(HPC)(MASS)
|
CY
|
134.300
|
$1,500.000
|
$1,350.000
|
$1,955.000
|
$773.310
|
$1,724.630
|
$1,040.790
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
110.400
|
$1,988.510
|
$1,600.000
|
$1,615.000
|
$985.830
|
$1,724.630
|
$1,221.120
|
|
|
REINF CONC SLAB
|
SF
|
15,750.000
|
$29.500
|
$35.000
|
$27.000
|
$35.000
|
$35.000
|
$33.910
|
|
|
APPROACH SLAB
|
CY
|
64.200
|
$658.020
|
$1,000.000
|
$1,064.650
|
$593.360
|
$750.000
|
$1,011.160
|
|
|
RETAINING WALL (MSE)
|
SF
|
5,407.000
|
$94.250
|
$90.000
|
$86.480
|
$58.790
|
$70.500
|
$127.900
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
1,117.950
|
$190.000
|
$290.000
|
$238.320
|
$307.000
|
$200.000
|
$267.070
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
346.000
|
$1,119.000
|
$950.000
|
$642.140
|
$568.120
|
$1,000.000
|
$386.070
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
24.000
|
$384.000
|
$950.000
|
$435.230
|
$568.090
|
$594.070
|
$1,019.880
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
77.000
|
$643.750
|
$1,100.000
|
$649.680
|
$665.490
|
$700.000
|
$560.360
|
|
|
RIPRAP (STONE TY R)(DRY)(18 IN)
|
CY
|
41.000
|
$171.880
|
$320.000
|
$250.000
|
$225.530
|
$100.000
|
$280.470
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
14.000
|
$300.000
|
$400.000
|
$244.670
|
$263.770
|
$115.000
|
$97.740
|
|
|
ELASTOMERIC BEARING (F3)
|
EA
|
7.000
|
$6,600.000
|
$3,500.000
|
$4,135.200
|
$3,213.600
|
$4,000.000
|
$1,699.800
|
|
|
SLIDING ELASTOMERIC BEARING (ES 3)
|
EA
|
7.000
|
$5,000.000
|
$3,500.000
|
$2,804.400
|
$4,427.290
|
$5,000.000
|
$1,699.800
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
419,200.000
|
$3.080
|
$2.750
|
$2.370
|
$3.500
|
$2.860
|
$2.940
|
|
|
RAIL (TY SSTR)
|
LF
|
814.000
|
$232.500
|
$125.000
|
$126.310
|
$95.000
|
$101.970
|
$109.230
|
|
|
RAIL (CLF-RO)
|
LF
|
814.000
|
$102.300
|
$175.000
|
$142.500
|
$151.890
|
$162.000
|
$142.780
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
198.000
|
$166.250
|
$350.000
|
$252.180
|
$211.560
|
$246.710
|
$275.540
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
57.000
|
$115.000
|
$125.000
|
$114.000
|
$81.140
|
$127.300
|
$162.650
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
30.000
|
$195.000
|
$180.000
|
$148.000
|
$128.840
|
$138.800
|
$122.810
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,775.000
|
$2,000.000
|
$4,088.000
|
$1,610.630
|
$2,137.850
|
$1,817.930
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,650.000
|
$4,200.000
|
$5,702.000
|
$4,233.920
|
$3,946.350
|
$3,353.990
|
|
|
REMOV STR (PIPE)
|
LF
|
35.000
|
$18.000
|
$20.000
|
$36.930
|
$39.820
|
$31.400
|
$26.690
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$69,494.860
|
$150,000.000
|
$265,830.440
|
$350,000.000
|
$127,725.000
|
$212,553.710
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$600,000.000
|
$150,000.000
|
$1,013,641.410
|
$602,615.260
|
$995,222.000
|
$777,544.040
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$8,000.000
|
$6,000.000
|
$3,500.000
|
$3,975.320
|
$10,000.000
|
$21,247.440
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$143.260
|
$100.000
|
$120.330
|
$132.310
|
$100.000
|
$80.230
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$9,331.670
|
$25,000.000
|
$11,000.000
|
$17,509.370
|
$9,500.000
|
$8,169.330
|
|
|
TMA (STATIONARY)
|
DAY
|
180.000
|
$183.210
|
$250.000
|
$261.050
|
$717.870
|
$401.000
|
$188.910
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$43.690
|
$200.000
|
$90.000
|
$177.240
|
$73.950
|
$62.850
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
40.000
|
$20.000
|
$70.000
|
$47.200
|
$45.000
|
$54.300
|
$46.150
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
40.000
|
$10.000
|
$10.000
|
$13.940
|
$10.000
|
$17.030
|
$14.470
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
159.000
|
$39.100
|
$55.000
|
$28.930
|
$34.000
|
$34.000
|
$28.900
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
159.000
|
$14.900
|
$10.000
|
$9.290
|
$12.000
|
$12.655
|
$10.760
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,421.000
|
$9.500
|
$6.000
|
$3.300
|
$3.500
|
$4.570
|
$3.880
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,421.000
|
$4.130
|
$1.000
|
$1.080
|
$1.500
|
$1.250
|
$1.170
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
60.000
|
$75.000
|
$70.000
|
$41.660
|
$84.010
|
$62.500
|
$53.120
|
|
|
DRIVEWAYS (ACP)
|
SY
|
744.000
|
$45.000
|
$95.000
|
$62.100
|
$63.640
|
$91.155
|
$77.470
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
925.000
|
$31.500
|
$36.000
|
$21.890
|
$29.000
|
$33.000
|
$29.750
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,850.000
|
$2,800.000
|
$1,894.750
|
$2,250.000
|
$2,370.000
|
$2,124.740
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
958.000
|
$2.810
|
$3.250
|
$4.950
|
$2.500
|
$3.000
|
$2.740
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,075.000
|
$3,800.000
|
$2,503.080
|
$2,950.000
|
$3,331.540
|
$2,831.470
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$325.000
|
$600.000
|
$250.000
|
$300.000
|
$271.970
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
11.000
|
$305.000
|
$400.000
|
$424.630
|
$385.000
|
$340.200
|
$436.280
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$1,025.000
|
$1,000.000
|
$373.320
|
$720.000
|
$1,075.000
|
$815.900
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$675.000
|
$1,700.000
|
$627.910
|
$935.000
|
$1,000.000
|
$1,059.540
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
9.000
|
$20.000
|
$50.000
|
$46.200
|
$38.000
|
$50.000
|
$22.100
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
13.000
|
$42.500
|
$50.000
|
$46.200
|
$38.000
|
$45.000
|
$24.360
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
3,280.000
|
$0.790
|
$1.800
|
$0.760
|
$0.430
|
$0.190
|
$0.180
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
3,280.000
|
$0.480
|
$1.780
|
$0.770
|
$0.420
|
$0.190
|
$0.190
|
|
|
PAVEMENT SLER 6"
|
LF
|
6,560.000
|
$0.800
|
$0.100
|
$0.540
|
$0.350
|
$1.000
|
$0.390
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
3,280.000
|
$0.680
|
$2.840
|
$1.010
|
$1.250
|
$2.250
|
$0.680
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,280.000
|
$0.940
|
$2.840
|
$0.990
|
$1.250
|
$2.250
|
$0.660
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
47.000
|
$5.910
|
$21.000
|
$6.900
|
$8.900
|
$6.500
|
$4.670
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
7,192.000
|
$1.550
|
$1.050
|
$1.510
|
$0.760
|
$1.630
|
$0.640
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
6,560.000
|
$0.400
|
$0.430
|
$0.240
|
$0.040
|
$1.000
|
$0.170
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
47.000
|
$6.540
|
$4.250
|
$1.510
|
$1.600
|
$0.440
|
$1.030
|
|
|
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
|
SF
|
2,416.000
|
$2.000
|
$2.500
|
$2.040
|
$2.850
|
$3.000
|
$1.940
|
|
Totals: |
$6,814,396.230
|
$6,597,547.430
|
$6,697,724.592
|
$7,119,281.011
|
$7,773,922.507
|
$7,812,561.360
|