PREPARING ROW
|
STA
|
14.000
|
$5,050.000
|
$13,000.000
|
$53,150.000
|
$62,000.000
|
$2,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
304.000
|
$50.000
|
$29.000
|
$17.670
|
$62.990
|
$60.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
525.000
|
$20.000
|
$16.000
|
$6.320
|
$14.590
|
$35.000
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
3,825.000
|
$22.000
|
$11.000
|
$9.260
|
$14.590
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
970.000
|
$23.000
|
$25.000
|
$20.040
|
$52.380
|
$42.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
2,819.000
|
$38.000
|
$36.000
|
$30.540
|
$82.210
|
$39.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C1)
|
CY
|
1,379.000
|
$50.000
|
$25.000
|
$46.550
|
$33.150
|
$46.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C2)(DS)
|
CY
|
85.000
|
$75.000
|
$135.000
|
$124.340
|
$33.150
|
$88.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
4,766.000
|
$2.500
|
$1.500
|
$1.560
|
$1.330
|
$8.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
4,766.000
|
$1.000
|
$0.650
|
$0.500
|
$0.660
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,384.000
|
$6.000
|
$1.350
|
$0.700
|
$0.660
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,384.000
|
$6.000
|
$1.350
|
$0.700
|
$0.660
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
78.000
|
$40.000
|
$65.000
|
$54.050
|
$39.780
|
$90.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
200.000
|
$3.300
|
$7.500
|
$9.000
|
$5.300
|
$10.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
1,569.000
|
$85.000
|
$98.000
|
$94.210
|
$78.500
|
$45.000
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
4,705.000
|
$6.000
|
$3.000
|
$4.200
|
$5.970
|
$6.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
2,822.000
|
$8.000
|
$5.250
|
$6.000
|
$5.440
|
$6.000
|
|
|
AGGR(TY D GR 3 OR TY L GR 3)
|
CY
|
51.000
|
$270.000
|
$325.000
|
$400.000
|
$571.510
|
$640.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,000.000
|
$80.000
|
$98.000
|
$87.620
|
$112.710
|
$125.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
10,000.000
|
$10.000
|
$2.000
|
$0.940
|
$3.980
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
484.000
|
$275.000
|
$285.000
|
$223.860
|
$196.250
|
$325.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,360.000
|
$35.000
|
$15.000
|
$31.170
|
$36.470
|
$1.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
129.000
|
$205.000
|
$225.000
|
$163.970
|
$529.300
|
$270.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,263.000
|
$350.000
|
$315.000
|
$235.510
|
$520.370
|
$825.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
176.000
|
$540.000
|
$425.000
|
$345.890
|
$629.770
|
$3,450.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
116.900
|
$1,700.000
|
$1,200.000
|
$1,241.270
|
$2,002.120
|
$2,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
97.500
|
$2,000.000
|
$1,200.000
|
$1,261.720
|
$2,335.660
|
$3,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
224.500
|
$2,050.000
|
$1,250.000
|
$1,271.310
|
$2,725.330
|
$3,200.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
10.000
|
$950.000
|
$1,900.000
|
$899.090
|
$1,735.730
|
$1,500.000
|
|
|
REINF CONC SLAB
|
SF
|
22,540.000
|
$31.000
|
$25.000
|
$24.570
|
$28.210
|
$40.000
|
|
|
APPROACH SLAB
|
CY
|
163.000
|
$800.000
|
$640.000
|
$646.600
|
$1,190.650
|
$1,400.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
2,662.000
|
$120.000
|
$125.000
|
$97.290
|
$92.110
|
$225.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,011.000
|
$250.000
|
$250.000
|
$222.630
|
$271.140
|
$650.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
1,910.900
|
$250.000
|
$325.000
|
$221.610
|
$268.380
|
$350.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
20.000
|
$900.000
|
$1,000.000
|
$933.130
|
$535.700
|
$800.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
1,350.000
|
$305.000
|
$140.000
|
$161.280
|
$131.270
|
$120.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
3,339.000
|
$185.000
|
$140.000
|
$170.900
|
$131.270
|
$100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
53.300
|
$625.000
|
$750.000
|
$682.470
|
$535.700
|
$900.000
|
|
|
RAIL (TY T223)
|
LF
|
1,366.400
|
$165.000
|
$175.000
|
$108.690
|
$125.580
|
$125.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
185.000
|
$230.000
|
$250.000
|
$190.630
|
$232.050
|
$200.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$100,000.000
|
$150,000.000
|
$407,760.000
|
$120,666.000
|
$450,000.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
48.000
|
$200.000
|
$50.000
|
$68.980
|
$99.450
|
$400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$691,258.000
|
$630,000.000
|
$747,137.610
|
$860,000.000
|
$1,040,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$8,500.000
|
$3,000.000
|
$4,082.240
|
$13,525.200
|
$8,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,968.000
|
$6.150
|
$7.000
|
$5.500
|
$5.640
|
$25.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,968.000
|
$1.800
|
$1.000
|
$1.000
|
$1.330
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
289.000
|
$63.000
|
$65.000
|
$93.360
|
$59.670
|
$60.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
145.000
|
$130.000
|
$30.000
|
$68.980
|
$53.040
|
$125.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
450.000
|
$35.000
|
$38.000
|
$30.130
|
$39.950
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$2,700.000
|
$3,500.000
|
$2,593.670
|
$3,439.210
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,500.000
|
$3,500.000
|
$3,465.290
|
$4,594.980
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$8,200.000
|
$35,000.000
|
$28,500.000
|
$12,487.820
|
$35,000.000
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
25.000
|
$50.000
|
$40.000
|
$35.640
|
$46.410
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$800.000
|
$875.000
|
$567.610
|
$895.050
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$115.000
|
$115.000
|
$5.130
|
$139.230
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
14.000
|
$35.000
|
$60.000
|
$32.430
|
$19.230
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
9.000
|
$50.000
|
$75.000
|
$57.130
|
$24.530
|
$60.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
|
EA
|
6.000
|
$105.000
|
$115.000
|
$140.700
|
$139.230
|
$600.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
100.000
|
$1.500
|
$2.750
|
$2.500
|
$3.980
|
$12.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,800.000
|
$1.100
|
$2.500
|
$2.250
|
$3.980
|
$12.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
470.000
|
$1.000
|
$2.500
|
$2.150
|
$3.980
|
$12.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,304.000
|
$1.000
|
$2.500
|
$2.250
|
$3.980
|
$12.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
1.000
|
$295.000
|
$400.000
|
$350.000
|
$132.600
|
$1,200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
1.000
|
$360.000
|
$450.000
|
$415.000
|
$265.200
|
$1,200.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
6.000
|
$7.200
|
$14.000
|
$12.000
|
$6.630
|
$1,200.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
104.000
|
$11.000
|
$14.000
|
$2.000
|
$39.780
|
$90.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
670.000
|
$160.000
|
$140.000
|
$180.000
|
$192.270
|
$165.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
1,100.000
|
$300.000
|
$150.000
|
$130.000
|
$237.350
|
$175.000
|
|
|
TACK COAT
|
GAL
|
406.000
|
$5.000
|
$4.000
|
$6.000
|
$4.050
|
$4.000
|
|
|
SP MIXES SP-C SAC-B PG70-22 (EXEMPT)
|
TON
|
889.000
|
$175.000
|
$155.000
|
$200.000
|
$225.420
|
$200.000
|
|
|
LEAD CONTAINING COATING MANAGEMENT
|
SF
|
470.000
|
$105.000
|
$75.000
|
$74.330
|
$132.600
|
$90.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,000.000
|
$19,000.000
|
$9,748.560
|
$9,282.000
|
$14,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
360.000
|
$305.000
|
$5.000
|
$518.490
|
$530.400
|
$125.000
|
|
Totals: |
$7,591,387.300
|
$6,464,516.700
|
$7,453,895.004
|
$8,772,914.107
|
$10,588,123.000
|