|
|
PREPARING ROW
|
STA
|
431.110
|
$6,000.000
|
$5,000.000
|
$2,000.000
|
$7,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (11.5")
|
SY
|
147,972.000
|
$8.000
|
$9.000
|
$10.000
|
$15.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
|
CY
|
236.000
|
$110.000
|
$40.000
|
$50.000
|
$50.000
|
|
|
BACKFILL (TY A)
|
STA
|
429.590
|
$350.000
|
$350.000
|
$500.000
|
$2,000.000
|
|
|
BLADING
|
STA
|
429.590
|
$150.000
|
$350.000
|
$300.000
|
$2,000.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
143,401.000
|
$1.000
|
$0.120
|
$0.200
|
$0.140
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
35,850.000
|
$1.000
|
$0.600
|
$0.700
|
$0.600
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
35,850.000
|
$1.000
|
$0.570
|
$0.700
|
$0.550
|
|
|
VEGETATIVE WATERING
|
MG
|
2,292.000
|
$15.000
|
$20.000
|
$5.000
|
$15.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
31,981.000
|
$65.000
|
$105.000
|
$92.500
|
$110.000
|
|
|
CEMENT
|
TON
|
4,644.000
|
$225.000
|
$330.000
|
$300.000
|
$300.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
143,198.000
|
$4.000
|
$4.000
|
$6.000
|
$3.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
147,972.000
|
$4.000
|
$4.000
|
$6.000
|
$3.000
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
36,994.000
|
$6.000
|
$6.500
|
$7.000
|
$7.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
53,270.000
|
$4.500
|
$4.650
|
$6.500
|
$4.500
|
|
|
AGGR (TY-B GR-4)
|
CY
|
1,024.000
|
$550.000
|
$185.000
|
$110.000
|
$175.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
3,280.000
|
$4.500
|
$6.500
|
$6.000
|
$8.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
34.000
|
$250.000
|
$1,000.000
|
$100.000
|
$400.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
20.000
|
$350.000
|
$800.000
|
$100.000
|
$1,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
243.000
|
$750.000
|
$820.000
|
$600.000
|
$600.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
186.000
|
$264.000
|
$85.000
|
$50.000
|
$60.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
340.000
|
$285.000
|
$300.000
|
$210.000
|
$260.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
224.000
|
$95.000
|
$85.000
|
$60.000
|
$75.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,100.000
|
$1,100.000
|
$800.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$600.000
|
$500.000
|
$400.000
|
$600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
112.000
|
$30.000
|
$20.000
|
$10.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,759,000.000
|
$2,100,000.000
|
$3,200,000.000
|
$2,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$8,000.000
|
$10,000.000
|
$14,000.000
|
$70,000.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$10,000.000
|
$15,000.000
|
$5,000.000
|
$10,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
200.000
|
$125.000
|
$120.000
|
$150.000
|
$150.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
200.000
|
$40.000
|
$20.000
|
$100.000
|
$30.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
200.000
|
$40.000
|
$25.000
|
$20.000
|
$30.000
|
|
|
TURNOUTS (ACP)
|
SY
|
1,720.000
|
$90.000
|
$100.000
|
$80.000
|
$75.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
17,245.000
|
$2.000
|
$0.500
|
$2.000
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,900.000
|
$75.000
|
$25.000
|
$25.000
|
$28.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
350.000
|
$85.000
|
$105.000
|
$100.000
|
$120.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$1,750.000
|
$3,000.000
|
$2,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,250.000
|
$20.000
|
$2.200
|
$4.000
|
$3.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$250.000
|
$165.000
|
$200.000
|
$400.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
24.000
|
$5,000.000
|
$3,050.000
|
$3,000.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
24.000
|
$1,250.000
|
$220.000
|
$250.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$3,000.000
|
$2,200.000
|
$2,000.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$2,000.000
|
$880.000
|
$1,000.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$12,500.000
|
$9,500.000
|
$10,000.000
|
$15,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
27.000
|
$375.000
|
$320.000
|
$350.000
|
$350.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$500.000
|
$620.000
|
$1,000.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,300.000
|
$1,385.000
|
$2,000.000
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,600.000
|
$1,155.000
|
$1,800.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
36.000
|
$1,100.000
|
$450.000
|
$500.000
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
41.000
|
$400.000
|
$110.000
|
$150.000
|
$130.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
87,468.000
|
$1.000
|
$0.350
|
$0.400
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
8,030.000
|
$0.850
|
$0.550
|
$0.500
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
84,918.000
|
$1.000
|
$0.350
|
$0.500
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
100.000
|
$7.000
|
$9.000
|
$5.000
|
$9.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$20.000
|
$9.000
|
$10.000
|
$9.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4.000
|
$1.000
|
$24.000
|
$5.000
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
4,296.000
|
$1.000
|
$2.200
|
$5.000
|
$2.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
20.000
|
$20.000
|
$16.500
|
$20.000
|
$20.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,160.000
|
$4.000
|
$4.500
|
$5.000
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,400.000
|
$1.000
|
$0.750
|
$1.000
|
$0.700
|
|
|
NO. OF WORKING DAYS
|
$/D
|
24,588.000
|
$238.000
|
$238.000
|
$238.000
|
$230.000
|
|
|
SP MIXES SP-D PG76-22
|
TON
|
15,320.000
|
$175.000
|
$172.000
|
$200.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
16,375.000
|
$4.500
|
$4.600
|
$7.000
|
$5.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
14,754.000
|
$175.000
|
$218.000
|
$250.000
|
$245.000
|
|
|
TACK COAT
|
GAL
|
16,094.000
|
$4.500
|
$4.600
|
$7.000
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
3,420.000
|
$125.000
|
$200.000
|
$100.000
|
$150.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
8,622.000
|
$7.000
|
$6.600
|
$7.000
|
$6.600
|
|
|
PORTABLE TRAFFIC SIGNAL
|
MO
|
6.000
|
$4,500.000
|
$5,720.000
|
$6,000.000
|
$10,000.000
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
86,362.000
|
$0.550
|
$0.850
|
$0.800
|
$0.820
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
61,221.000
|
$0.550
|
$0.850
|
$0.800
|
$0.820
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
6,920.000
|
$0.550
|
$0.900
|
$0.800
|
$0.900
|
|
|
TMA (STATIONARY)
|
DAY
|
482.000
|
$170.000
|
$200.000
|
$100.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
16.000
|
$50.000
|
$275.000
|
$500.000
|
$250.000
|
|
Totals: |
$24,948,821.650
|
$26,827,889.570
|
$27,449,972.300
|
$30,973,875.500
|