PREPARING ROW
|
STA
|
55.500
|
$3,000.000
|
$551.250
|
$1,500.000
|
$1,000.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,375.000
|
$9.000
|
$7.130
|
$11.000
|
$14.000
|
|
|
BACKFILL (TY C)
|
STA
|
243.000
|
$300.000
|
$207.300
|
$300.000
|
$225.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
14,282.000
|
$0.200
|
$1.000
|
$0.250
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
229.000
|
$12.000
|
$89.720
|
$12.000
|
$1.000
|
|
|
SUPERPAVE MIXTURES SP-D PG76-22
|
TON
|
7,442.000
|
$120.000
|
$102.200
|
$115.000
|
$115.000
|
|
|
STONE-MTRX-ASPH SMA-D PG76-22
|
TON
|
15,354.000
|
$140.000
|
$140.000
|
$155.000
|
$155.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
5,691.000
|
$5.000
|
$36.920
|
$32.000
|
$40.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
163,169.000
|
$1.500
|
$1.160
|
$1.750
|
$1.950
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
147.000
|
$450.000
|
$405.970
|
$450.000
|
$480.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
528.000
|
$20.000
|
$35.700
|
$45.000
|
$47.500
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
528.000
|
$20.000
|
$16.800
|
$25.000
|
$43.500
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
300.000
|
$100.000
|
$96.600
|
$85.000
|
$105.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$438,230.950
|
$117,000.000
|
$200,000.000
|
$450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,000.000
|
$533.060
|
$10,000.000
|
$2,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
250.000
|
$5.000
|
$3.150
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
250.000
|
$1.000
|
$1.050
|
$1.000
|
$2.200
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,699.000
|
$35.000
|
$14.530
|
$23.000
|
$30.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
42,842.000
|
$0.200
|
$0.320
|
$0.400
|
$0.160
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,350.000
|
$24.000
|
$19.430
|
$21.000
|
$20.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,800.000
|
$1,834.740
|
$1,800.000
|
$1,625.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,200.000
|
$1,023.750
|
$1,300.000
|
$1,075.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,475.000
|
$3.000
|
$2.100
|
$2.500
|
$2.200
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$300.000
|
$315.000
|
$200.000
|
$330.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,800.000
|
$2,808.750
|
$2,700.000
|
$2,950.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$350.000
|
$341.250
|
$250.000
|
$360.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$52.000
|
$778.690
|
$800.000
|
$815.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$42.000
|
$1,061.820
|
$800.000
|
$1,110.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
6.000
|
$42.000
|
$633.900
|
$800.000
|
$665.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$68.000
|
$251.950
|
$200.000
|
$265.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$40.000
|
$25.200
|
$30.000
|
$26.400
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
15.000
|
$40.000
|
$30.450
|
$30.000
|
$32.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
5,355.000
|
$0.350
|
$0.260
|
$0.270
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
42,841.000
|
$0.350
|
$0.260
|
$0.270
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
42,841.000
|
$0.350
|
$0.260
|
$0.270
|
$0.280
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
2,678.000
|
$1.500
|
$1.200
|
$2.000
|
$1.400
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
2,678.000
|
$1.500
|
$1.300
|
$2.000
|
$1.400
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,366.000
|
$1.000
|
$1.060
|
$1.100
|
$1.100
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
383.000
|
$15.000
|
$12.980
|
$13.000
|
$13.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
21.000
|
$200.000
|
$193.350
|
$200.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
17.000
|
$250.000
|
$236.790
|
$250.000
|
$245.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
40.000
|
$60.000
|
$47.150
|
$50.000
|
$48.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
1,190.000
|
$11.000
|
$12.980
|
$14.000
|
$13.500
|
|
PREFAB PAV MRK TY C (Y) (MED NOSE)
|
EA
|
1.000
|
$500.000
|
$211.890
|
$250.000
|
$220.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
560.000
|
$4.000
|
$3.500
|
$4.000
|
$3.650
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,573.000
|
$4.000
|
$3.500
|
$4.000
|
$3.650
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,000.000
|
$4,716.370
|
$15,000.000
|
$16,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
192.000
|
$2.700
|
$15.890
|
$16.000
|
$16.500
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
42,842.000
|
$5.500
|
$3.550
|
$3.700
|
$3.700
|
|
|
REFL PAV MRK AWT (W) (6")(SLD)(125 MIL)
|
LF
|
43,380.000
|
$0.700
|
$0.660
|
$0.680
|
$0.680
|
|
|
REFL PAV MRK AWT (W) (6")(BRK)(125 MIL)
|
LF
|
10,721.000
|
$0.700
|
$0.690
|
$0.700
|
$0.720
|
|
|
REFL PAV MRK AWT (Y) (6")(SLD)(125 MIL)
|
LF
|
50,105.000
|
$0.700
|
$0.660
|
$0.680
|
$0.680
|
|
|
REFL PAV MRK AWT (Y) (6")(BRK)(125 MIL)
|
LF
|
9,788.000
|
$0.700
|
$0.690
|
$0.700
|
$0.700
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$12,000.000
|
$36,079.560
|
$30,000.000
|
$16,500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
100.000
|
$12.000
|
$776.240
|
$30.000
|
$27.500
|
|
Totals: |
$4,788,910.400
|
$4,256,573.985
|
$4,844,091.640
|
$5,099,545.400
|