PREPARING ROW
|
STA
|
25.400
|
$2,500.000
|
$2,000.000
|
$1,552.340
|
$1,200.000
|
$3,800.000
|
$1,400.000
|
$1,250.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,389.000
|
$9.000
|
$10.000
|
$25.220
|
$9.500
|
$10.000
|
$15.000
|
$18.500
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
241.000
|
$28.000
|
$5.000
|
$25.000
|
$14.000
|
$100.000
|
$20.000
|
$80.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
159.000
|
$10.000
|
$10.000
|
$3.000
|
$8.000
|
$12.000
|
$20.000
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
2,569.000
|
$13.000
|
$6.000
|
$9.560
|
$4.750
|
$8.000
|
$11.000
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
365.000
|
$7.000
|
$9.000
|
$4.000
|
$12.000
|
$10.000
|
$12.000
|
$23.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
985.000
|
$11.000
|
$9.000
|
$20.000
|
$14.000
|
$15.000
|
$12.000
|
$23.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
487.000
|
$25.000
|
$9.000
|
$15.000
|
$16.000
|
$30.000
|
$12.000
|
$21.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
15,549.000
|
$9.000
|
$9.000
|
$11.790
|
$10.500
|
$10.000
|
$12.000
|
$29.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
28,700.000
|
$2.500
|
$1.000
|
$1.900
|
$1.750
|
$1.000
|
$2.500
|
$3.100
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
14,350.000
|
$0.150
|
$0.150
|
$0.170
|
$0.110
|
$0.500
|
$0.300
|
$0.320
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
14,350.000
|
$0.150
|
$0.110
|
$0.120
|
$0.110
|
$0.500
|
$0.300
|
$0.320
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
28,700.000
|
$0.800
|
$0.770
|
$0.770
|
$1.050
|
$0.800
|
$1.000
|
$0.900
|
|
|
VEGETATIVE WATERING
|
MG
|
460.000
|
$11.000
|
$7.000
|
$7.000
|
$1.000
|
$1.000
|
$15.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
2,513.000
|
$2.000
|
$2.000
|
$1.700
|
$2.250
|
$2.500
|
$2.000
|
$1.700
|
|
|
CEMENT
|
TON
|
112.000
|
$160.000
|
$155.000
|
$165.000
|
$195.000
|
$170.000
|
$200.000
|
$160.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
8,146.000
|
$4.500
|
$3.000
|
$5.500
|
$2.750
|
$5.000
|
$7.500
|
$4.750
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,523.000
|
$5.000
|
$5.000
|
$6.000
|
$4.750
|
$8.000
|
$8.250
|
$8.000
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
322.000
|
$4.500
|
$6.000
|
$10.000
|
$6.250
|
$8.000
|
$15.000
|
$10.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
12,827.000
|
$1.500
|
$2.250
|
$1.550
|
$3.250
|
$2.000
|
$7.000
|
$1.250
|
|
|
CEM STABIL BKFL
|
CY
|
331.000
|
$191.000
|
$150.000
|
$162.000
|
$230.000
|
$150.000
|
$200.000
|
$235.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
285.000
|
$32.000
|
$50.000
|
$43.000
|
$70.000
|
$50.000
|
$40.000
|
$38.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
204.000
|
$120.000
|
$75.000
|
$85.000
|
$140.000
|
$100.000
|
$90.000
|
$72.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,044.000
|
$192.000
|
$215.000
|
$240.000
|
$235.000
|
$170.000
|
$235.000
|
$210.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
130.000
|
$1,300.000
|
$950.000
|
$965.000
|
$1,050.000
|
$1,000.000
|
$1,100.000
|
$1,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
79.400
|
$1,300.000
|
$950.000
|
$965.000
|
$1,050.000
|
$1,000.000
|
$1,200.000
|
$1,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
56.600
|
$1,200.000
|
$950.000
|
$1,120.000
|
$975.000
|
$1,000.000
|
$1,200.000
|
$875.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
18,860.000
|
$23.000
|
$19.000
|
$21.400
|
$20.000
|
$22.000
|
$22.000
|
$24.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
221.300
|
$718.000
|
$550.000
|
$625.000
|
$540.000
|
$800.000
|
$550.000
|
$545.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
4,007.000
|
$25.000
|
$26.000
|
$16.000
|
$22.000
|
$10.000
|
$34.000
|
$23.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
891.000
|
$151.000
|
$160.000
|
$195.000
|
$140.000
|
$180.000
|
$160.000
|
$275.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
1,551.000
|
$155.000
|
$160.000
|
$165.000
|
$165.000
|
$190.000
|
$185.000
|
$275.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
2,438.000
|
$128.000
|
$115.000
|
$110.000
|
$142.000
|
$120.000
|
$120.000
|
$123.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
11.000
|
$500.000
|
$650.000
|
$800.000
|
$500.000
|
$600.000
|
$550.000
|
$1,260.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
37.000
|
$450.000
|
$475.000
|
$440.000
|
$515.000
|
$500.000
|
$525.000
|
$550.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
948.000
|
$79.000
|
$90.000
|
$113.000
|
$74.000
|
$100.000
|
$110.000
|
$85.000
|
|
|
ARMOR JOINT
|
LF
|
176.000
|
$51.000
|
$35.000
|
$70.000
|
$45.000
|
$75.000
|
$90.000
|
$55.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
181.300
|
$120.000
|
$95.000
|
$95.000
|
$70.000
|
$85.000
|
$95.000
|
$120.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$80,000.000
|
$40,000.000
|
$60,000.000
|
$60,000.000
|
$55,000.000
|
$30,000.000
|
$60,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$417,000.000
|
$350,000.000
|
$325,000.000
|
$340,000.000
|
$400,000.000
|
$480,000.000
|
$410,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$8,100.000
|
$2,500.000
|
$1,650.000
|
$4,000.000
|
$7,700.000
|
$3,000.000
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
328.000
|
$53.000
|
$70.000
|
$83.500
|
$51.000
|
$5.000
|
$68.000
|
$118.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
328.000
|
$15.000
|
$14.000
|
$16.000
|
$13.000
|
$1.000
|
$16.000
|
$29.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,115.000
|
$3.000
|
$3.000
|
$3.000
|
$2.900
|
$1.000
|
$3.000
|
$2.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,115.000
|
$1.250
|
$1.200
|
$0.900
|
$1.000
|
$1.000
|
$1.400
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
240.000
|
$4.500
|
$13.000
|
$7.250
|
$6.600
|
$8.000
|
$10.000
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
240.000
|
$4.000
|
$1.000
|
$3.000
|
$1.550
|
$4.000
|
$4.500
|
$5.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
13.000
|
$5,000.000
|
$1,000.000
|
$1,500.000
|
$10,000.000
|
$2,500.000
|
$5,000.000
|
$6,250.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
2,675.000
|
$71.000
|
$70.000
|
$40.000
|
$80.000
|
$40.000
|
$70.000
|
$65.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
2,520.000
|
$10.000
|
$5.000
|
$7.000
|
$7.000
|
$8.000
|
$12.000
|
$9.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
2,675.000
|
$11.000
|
$5.000
|
$5.000
|
$12.000
|
$12.000
|
$24.000
|
$8.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
14,580.000
|
$0.300
|
$0.750
|
$1.000
|
$0.200
|
$1.000
|
$0.700
|
$0.600
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,100.000
|
$22.000
|
$22.000
|
$18.000
|
$18.250
|
$20.000
|
$21.000
|
$17.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,850.000
|
$1,600.000
|
$1,275.000
|
$1,450.000
|
$1,400.000
|
$1,450.000
|
$1,400.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,750.000
|
$2,600.000
|
$2,200.000
|
$2,500.000
|
$2,500.000
|
$2,700.000
|
$2,400.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,500.000
|
$2,200.000
|
$1,000.000
|
$2,400.000
|
$3,000.000
|
$2,200.000
|
$2,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$500.000
|
$880.000
|
$1,000.000
|
$900.000
|
$850.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$8,000.000
|
$9,500.000
|
$10,000.000
|
$9,500.000
|
$9,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
4.000
|
$950.000
|
$950.000
|
$951.000
|
$825.000
|
$800.000
|
$950.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$90.000
|
$150.000
|
$134.200
|
$110.000
|
$100.000
|
$190.700
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$25.000
|
$20.000
|
$25.000
|
$20.000
|
$40.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
12.000
|
$25.000
|
$30.000
|
$25.000
|
$26.000
|
$40.000
|
$25.000
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
11,775.000
|
$0.250
|
$0.830
|
$0.830
|
$0.480
|
$0.800
|
$0.180
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
48.000
|
$3.900
|
$8.000
|
$7.500
|
$6.600
|
$10.000
|
$3.300
|
$4.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
15,100.000
|
$0.250
|
$0.830
|
$0.800
|
$0.480
|
$0.800
|
$0.180
|
$0.200
|
|
|
PAVEMENT SEALER 4"
|
LF
|
930.000
|
$0.200
|
$1.100
|
$1.100
|
$0.160
|
$1.000
|
$1.600
|
$1.500
|
|
PREFAB PAV MRK TY B (W)(4")(SLD)
|
LF
|
1,340.000
|
$7.000
|
$8.000
|
$7.700
|
$7.150
|
$8.000
|
$6.200
|
$6.000
|
|
PREFAB PAV MRK TY B (Y)(4")(BRK)CNTST
|
LF
|
180.000
|
$8.000
|
$11.000
|
$11.000
|
$7.150
|
$15.000
|
$14.000
|
$12.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
90.000
|
$3.200
|
$15.000
|
$6.600
|
$4.000
|
$10.000
|
$6.200
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
930.000
|
$0.100
|
$1.100
|
$1.100
|
$0.700
|
$1.000
|
$1.100
|
$1.000
|
|
|
SP MIXES SP-C PG76-22
|
TON
|
2,947.000
|
$106.000
|
$110.000
|
$109.000
|
$125.000
|
$150.000
|
$155.000
|
$150.000
|
|
|
SP MIXES SP-D PG76-22
|
TON
|
2,525.000
|
$115.000
|
$110.000
|
$105.000
|
$126.000
|
$150.000
|
$142.000
|
$145.000
|
|
|
TACK COAT
|
GAL
|
3,500.000
|
$5.000
|
$4.000
|
$6.000
|
$3.600
|
$8.000
|
$8.000
|
$3.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,500.000
|
$8,000.000
|
$8,000.000
|
$18,000.000
|
$10,000.000
|
$8,500.000
|
$23,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
7,280.000
|
$4.000
|
$5.000
|
$5.200
|
$7.150
|
$5.000
|
$5.250
|
$5.000
|
|
|
REFL PAV MRK AWT (W) 4" (SLD) (100MIL)
|
LF
|
13,760.000
|
$0.400
|
$0.830
|
$0.820
|
$0.720
|
$0.800
|
$0.600
|
$0.750
|
|
|
REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)
|
LF
|
1,715.000
|
$0.500
|
$1.100
|
$1.100
|
$0.720
|
$1.000
|
$0.600
|
$0.750
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$225.000
|
$200.000
|
$150.000
|
$100.000
|
$150.000
|
$175.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$50.000
|
$30.000
|
$20.000
|
$100.000
|
$100.000
|
$75.000
|
$30.000
|
|
Totals: |
$4,498,344.100
|
$3,919,948.800
|
$4,065,123.466
|
$4,391,541.100
|
$4,497,963.000
|
$4,854,854.850
|
$5,194,759.850
|