PREPARING ROW
|
AC
|
46.100
|
$10,550.000
|
$7,700.000
|
$7,500.000
|
$2,500.000
|
$7,000.000
|
|
|
REMOV CONC (PAV)
|
SY
|
22,682.000
|
$10.000
|
$5.500
|
$10.000
|
$5.250
|
$10.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
1,954.000
|
$9.000
|
$12.000
|
$7.000
|
$9.000
|
$25.000
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
200.000
|
$17.000
|
$15.000
|
$10.000
|
$7.850
|
$25.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
2,042.000
|
$12.000
|
$12.000
|
$6.000
|
$8.800
|
$25.000
|
|
|
REMOV CONC (FOUNDATIONS)
|
SY
|
572.000
|
$60.000
|
$15.000
|
$32.000
|
$11.000
|
$25.000
|
|
|
REMOV CONC (MISC)
|
SY
|
870.000
|
$36.000
|
$15.000
|
$20.000
|
$7.500
|
$25.000
|
|
|
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
|
SY
|
11,549.000
|
$10.000
|
$11.000
|
$7.000
|
$9.700
|
$5.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
3,711.000
|
$10.000
|
$9.500
|
$8.000
|
$6.500
|
$10.000
|
|
|
EMBANK (VEH)(DC)(TY C)
|
CY
|
70,340.000
|
$20.000
|
$11.500
|
$14.000
|
$11.250
|
$15.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
22,250.000
|
$1.000
|
$1.500
|
$2.000
|
$2.000
|
$1.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
22,346.000
|
$0.500
|
$0.520
|
$0.570
|
$0.530
|
$0.650
|
|
|
BOND FBR MTRX SEED (TEMP)(WARM)
|
SY
|
11,173.000
|
$0.750
|
$0.500
|
$0.560
|
$0.500
|
$0.350
|
|
|
BOND FBR MTRX SEED (TEMP)(COOL)
|
SY
|
11,173.000
|
$0.750
|
$0.500
|
$0.560
|
$0.500
|
$0.350
|
|
|
FL BS (CMP IN PLC)(TY E GR 4) (4")
|
SY
|
80,093.000
|
$8.000
|
$2.650
|
$3.000
|
$2.000
|
$19.000
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
1,665.000
|
$350.000
|
$380.000
|
$443.000
|
$415.000
|
$350.000
|
|
|
LIME TRT (NEW BASE)(8")
|
SY
|
30,873.000
|
$3.000
|
$3.000
|
$2.000
|
$4.000
|
$3.500
|
|
|
LIME TRT (NEW BASE)(10")
|
SY
|
80,093.000
|
$3.000
|
$3.250
|
$2.000
|
$3.750
|
$3.500
|
|
|
CEMENT
|
TON
|
1,665.000
|
$225.000
|
$240.000
|
$250.000
|
$235.000
|
$250.000
|
|
|
CEMENT TRT (NEW BASE)(8")
|
SY
|
30,873.000
|
$3.000
|
$2.000
|
$2.000
|
$4.000
|
$2.500
|
|
|
CEMENT TRT (NEW BASE)(10")
|
SY
|
80,093.000
|
$3.000
|
$2.250
|
$2.000
|
$3.750
|
$2.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
27,743.000
|
$5.000
|
$5.500
|
$6.400
|
$5.250
|
$6.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
22,426.000
|
$3.500
|
$4.250
|
$2.000
|
$3.000
|
$5.250
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
15,440.000
|
$4.000
|
$5.000
|
$5.600
|
$4.700
|
$5.000
|
|
|
AGGR (TY-PB, GR-4)(SAC-A)
|
CY
|
256.000
|
$72.000
|
$215.000
|
$285.000
|
$190.000
|
$180.000
|
|
|
SP MIXES SP-C PG76-22
|
TON
|
15,759.000
|
$122.000
|
$132.000
|
$130.000
|
$134.000
|
$126.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
3,110.000
|
$125.000
|
$133.000
|
$132.000
|
$134.000
|
$126.000
|
|
|
TACK COAT
|
GAL
|
18,524.000
|
$4.000
|
$4.500
|
$4.000
|
$4.500
|
$6.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
764.000
|
$5.000
|
$10.000
|
$10.000
|
$8.000
|
$5.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
12.000
|
$190.000
|
$225.000
|
$150.000
|
$225.000
|
$205.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
200.000
|
$872.000
|
$770.000
|
$780.000
|
$1,020.000
|
$928.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$1,425.000
|
$1,500.000
|
$1,300.000
|
$1,500.000
|
$2,500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
207.000
|
$650.000
|
$585.000
|
$472.000
|
$600.000
|
$750.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
26.000
|
$475.000
|
$700.000
|
$505.000
|
$630.000
|
$700.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
16.000
|
$565.000
|
$650.000
|
$535.000
|
$600.000
|
$600.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
20.000
|
$219.000
|
$185.000
|
$300.000
|
$295.000
|
$180.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
168.000
|
$75.000
|
$55.000
|
$60.000
|
$60.000
|
$55.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
672.000
|
$89.000
|
$75.000
|
$72.000
|
$75.000
|
$70.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,012.000
|
$100.000
|
$105.000
|
$100.000
|
$100.000
|
$110.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
548.000
|
$205.000
|
$190.000
|
$175.000
|
$175.000
|
$250.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$9,000.000
|
$9,500.000
|
$7,500.000
|
$8,500.000
|
$5,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$5,530.000
|
$9,000.000
|
$11,000.000
|
$10,500.000
|
$9,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,270.000
|
$875.000
|
$950.000
|
$1,100.000
|
$700.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,145.000
|
$1,200.000
|
$1,315.000
|
$1,570.000
|
$750.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$3,189.000
|
$2,900.000
|
$2,500.000
|
$2,875.000
|
$1,250.000
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$5,220.000
|
$7,000.000
|
$5,830.000
|
$5,975.000
|
$7,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
8.000
|
$1,018.000
|
$500.000
|
$675.000
|
$550.000
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
15.000
|
$1,288.000
|
$500.000
|
$715.000
|
$785.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
905.000
|
$18.000
|
$10.000
|
$12.000
|
$12.500
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,128,000.000
|
$500,000.000
|
$800,000.000
|
$900,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$5,000.000
|
$2,500.000
|
$2,300.000
|
$5,500.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$10,000.000
|
$6,600.000
|
$19,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
177.000
|
$140.000
|
$200.000
|
$250.000
|
$150.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
26.000
|
$330.000
|
$200.000
|
$350.000
|
$275.000
|
$1,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
315.000
|
$49.000
|
$38.500
|
$42.000
|
$38.000
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
315.000
|
$12.000
|
$9.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
278.000
|
$30.000
|
$38.500
|
$44.000
|
$38.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
278.000
|
$8.000
|
$6.000
|
$10.000
|
$7.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,203.000
|
$4.000
|
$4.000
|
$4.000
|
$3.900
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,203.000
|
$1.000
|
$0.400
|
$0.660
|
$0.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
300.000
|
$9.000
|
$7.000
|
$5.500
|
$7.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
300.000
|
$1.250
|
$0.250
|
$1.100
|
$0.500
|
$1.000
|
|
|
PTB (FUR&INST)(SGL SLP)(TY 1) OR (STL)
|
LF
|
15,630.000
|
$42.000
|
$65.000
|
$63.000
|
$74.000
|
$90.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
7,605.000
|
$15.000
|
$6.000
|
$2.500
|
$5.000
|
$25.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
15,630.000
|
$20.000
|
$9.000
|
$10.000
|
$7.000
|
$35.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
275.000
|
$27.000
|
$27.000
|
$34.000
|
$29.000
|
$35.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,170.000
|
$1,400.000
|
$1,650.000
|
$1,550.000
|
$2,750.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,280.000
|
$3,500.000
|
$3,740.000
|
$3,650.000
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,130.000
|
$1,625.000
|
$1,120.000
|
$2,200.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$510.000
|
$850.000
|
$690.000
|
$900.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,500.000
|
$10,000.000
|
$7,590.000
|
$9,800.000
|
$7,500.000
|
|
|
PIPE UNDERDRAINS (TY 9) (6")
|
LF
|
400.000
|
$35.000
|
$40.000
|
$50.000
|
$40.000
|
$50.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
8.000
|
$54,250.000
|
$50,800.000
|
$50,845.000
|
$60,525.000
|
$55,025.000
|
|
|
LED HI MST IL ASM (6 FIXT) (TY A)
|
EA
|
8.000
|
$50,000.000
|
$31,400.000
|
$31,500.000
|
$45,000.000
|
$40,750.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
3,769.000
|
$13.000
|
$15.250
|
$15.400
|
$8.250
|
$7.500
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
2,246.000
|
$27.000
|
$29.000
|
$30.000
|
$20.350
|
$18.500
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
6,190.000
|
$3.000
|
$3.600
|
$3.600
|
$2.750
|
$2.500
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
12,410.000
|
$3.000
|
$3.600
|
$3.600
|
$3.000
|
$2.750
|
|
|
GROUND BOX TY A (122311)
|
EA
|
8.000
|
$986.000
|
$1,350.000
|
$1,345.000
|
$1,100.000
|
$1,000.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
19.000
|
$1,250.000
|
$2,175.000
|
$2,170.000
|
$1,295.000
|
$1,175.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
3.000
|
$9,770.000
|
$13,000.000
|
$12,900.000
|
$8,425.000
|
$7,658.000
|
|
|
ALUMINUM SIGNS (TY G)
|
EA
|
7.000
|
$1,000.000
|
$1,850.000
|
$1,860.000
|
$2,500.000
|
$150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$656.000
|
$880.000
|
$732.000
|
$895.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$787.000
|
$1,050.000
|
$915.000
|
$1,055.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$957.000
|
$1,150.000
|
$1,195.000
|
$1,200.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,264.000
|
$1,400.000
|
$1,540.000
|
$1,420.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
7.000
|
$2,248.000
|
$3,050.000
|
$3,155.000
|
$3,060.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
2.000
|
$368.000
|
$500.000
|
$660.000
|
$515.000
|
$700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
25.000
|
$130.000
|
$110.000
|
$87.000
|
$110.000
|
$100.000
|
|
|
RELOCATE LRSA
|
EA
|
1.000
|
$1,068.000
|
$7,000.000
|
$6,600.000
|
$5,000.000
|
$6,350.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
8.000
|
$43.000
|
$45.000
|
$27.500
|
$49.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
37.000
|
$114.000
|
$140.000
|
$66.000
|
$140.000
|
$45.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
15,420.000
|
$1.500
|
$1.100
|
$1.250
|
$1.100
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
2,070.000
|
$1.500
|
$1.300
|
$1.000
|
$1.320
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,495.000
|
$1.000
|
$1.300
|
$1.000
|
$1.320
|
$1.200
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,120.000
|
$2.500
|
$4.950
|
$3.300
|
$4.950
|
$4.500
|
|
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
|
LF
|
10,570.000
|
$1.000
|
$1.650
|
$0.830
|
$1.650
|
$1.500
|
|
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
|
LF
|
3,310.000
|
$1.000
|
$1.650
|
$0.830
|
$1.650
|
$1.500
|
|
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,825.000
|
$1.000
|
$1.650
|
$0.830
|
$1.650
|
$1.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
286.000
|
$4.250
|
$6.500
|
$4.400
|
$6.600
|
$6.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
13,220.000
|
$1.000
|
$0.570
|
$0.750
|
$0.570
|
$0.520
|
|
|
PERMEABLE CONCRETE EDGE DRAIN
|
LF
|
9,183.000
|
$67.000
|
$60.000
|
$55.000
|
$85.000
|
$40.000
|
|
Totals: |
$12,397,796.000
|
$10,625,436.470
|
$10,965,650.810
|
$11,520,690.130
|
$13,658,247.400
|