|
|
PREPARING ROW
|
STA
|
63.800
|
$2,400.000
|
$1,000.000
|
$2,500.000
|
$1,200.000
|
|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
4.000
|
$1,000.000
|
$500.000
|
$2,000.000
|
$5,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
106.000
|
$40.000
|
$10.000
|
$30.000
|
$50.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
16,981.000
|
$12.000
|
$20.000
|
$14.500
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
3,364.000
|
$15.000
|
$30.000
|
$18.000
|
$18.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
STA
|
165.500
|
$250.000
|
$4.000
|
$650.000
|
$600.000
|
|
|
BLOCK SODDING
|
SY
|
137.000
|
$7.500
|
$10.000
|
$11.000
|
$22.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
68,338.000
|
$0.750
|
$0.600
|
$0.660
|
$0.561
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
34,169.000
|
$0.750
|
$0.600
|
$0.605
|
$0.550
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
34,169.000
|
$0.750
|
$0.600
|
$0.605
|
$0.550
|
|
|
VEGETATIVE WATERING
|
MG
|
1,093.300
|
$10.000
|
$40.000
|
$5.000
|
$25.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
1,614.000
|
$1.500
|
$3.000
|
$2.200
|
$1.485
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
2,194.000
|
$80.000
|
$85.000
|
$135.000
|
$182.000
|
|
|
REWORK BS MTL (TY B) (9-18") (ORD COMP)
|
SY
|
101.000
|
$10.000
|
$20.000
|
$72.000
|
$50.000
|
|
|
CUT & RESTORING PAV
|
SY
|
325.000
|
$110.000
|
$150.000
|
$120.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
3.000
|
$400.000
|
$600.000
|
$985.000
|
$2,000.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
86.000
|
$6.000
|
$10.000
|
$25.000
|
$20.000
|
|
|
CL A CONC (PLUG)
|
EA
|
2.000
|
$750.000
|
$1,000.000
|
$1,250.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
436.000
|
$85.000
|
$75.000
|
$70.000
|
$60.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
468.000
|
$105.000
|
$100.000
|
$112.000
|
$90.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
48.000
|
$155.000
|
$200.000
|
$184.000
|
$140.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$7,000.000
|
$3,000.000
|
$10,000.000
|
$10,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$700.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,150.000
|
$1,000.000
|
$1,400.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
2.000
|
$1,750.000
|
$2,000.000
|
$1,500.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,750.000
|
$2,000.000
|
$1,600.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,750.000
|
$2,000.000
|
$1,700.000
|
$1,200.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,750.000
|
$5,000.000
|
$3,100.000
|
$4,300.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,750.000
|
$5,000.000
|
$3,800.000
|
$4,300.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,250.000
|
$2,000.000
|
$3,500.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
238.000
|
$25.000
|
$20.000
|
$48.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$140,000.000
|
$160,000.000
|
$200,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$4,000.000
|
$5,000.000
|
$1,800.000
|
$1,792.090
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
258.000
|
$35.000
|
$40.000
|
$60.000
|
$37.400
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
18.000
|
$50.000
|
$80.000
|
$77.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
276.000
|
$12.500
|
$5.000
|
$16.500
|
$13.200
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
877.000
|
$27.500
|
$10.000
|
$44.000
|
$33.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
877.000
|
$10.000
|
$10.000
|
$11.000
|
$13.200
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,669.000
|
$4.000
|
$4.000
|
$3.850
|
$3.575
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,669.000
|
$1.500
|
$1.000
|
$0.550
|
$0.715
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
740.000
|
$7.000
|
$10.000
|
$6.600
|
$8.800
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
740.000
|
$1.500
|
$1.000
|
$1.100
|
$4.400
|
|
|
CONC SIDEWALKS (4")
|
SY
|
296.000
|
$78.000
|
$120.000
|
$120.000
|
$80.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
10.000
|
$750.000
|
$1,000.000
|
$560.000
|
$558.250
|
|
|
DECOMPOSED GRANITE PAVING MATERIALS
|
SY
|
17,891.000
|
$18.880
|
$10.000
|
$18.000
|
$37.000
|
|
|
INSTALL REMOVABLE BOLLARD
|
EA
|
28.000
|
$500.000
|
$500.000
|
$1,200.000
|
$400.000
|
|
|
TMA (STATIONARY)
|
DAY
|
185.000
|
$250.000
|
$400.000
|
$150.000
|
$350.000
|
|
|
MOBILIZATION
|
LS
|
0.010
|
$21,668.000
|
$1,000,000.000
|
$1,100.000
|
$2,000,000.000
|
|
|
1 1/2" C901 DR 9 POLYETHELENE TUBING
|
LF
|
115.000
|
$32.500
|
$15.000
|
$89.000
|
$44.000
|
|
|
8" C900 DR 18 PVC
|
LF
|
653.000
|
$68.750
|
$110.000
|
$74.250
|
$110.000
|
|
|
8" RJ C900 DR 18 PVC
|
LF
|
340.000
|
$77.500
|
$120.000
|
$47.000
|
$176.000
|
|
|
CONCRETE ENCASEMENT OF PIPE
|
LF
|
234.000
|
$90.000
|
$45.000
|
$170.000
|
$88.000
|
|
|
6" TAPPING SLEEVE AND VALVE
|
LF
|
1.000
|
$6,375.000
|
$6,000.000
|
$4,800.000
|
$6,600.000
|
|
|
5 1/4" FLUSH ASSY WITH VALVE & FITTINGS
|
LF
|
1.000
|
$2,775.000
|
$8,000.000
|
$10,000.000
|
$9,240.000
|
|
|
TESTING/FLUSHING LOCATION
|
EA
|
0.780
|
$25,000.000
|
$4,000.000
|
$3,000.000
|
$9,872.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
1.000
|
$2,125.000
|
$6,000.000
|
$25,000.000
|
$9,900.000
|
|
|
CUST SVCS TRANSFER & METER RELO
|
EA
|
1.000
|
$2,456.910
|
$3,000.000
|
$2,400.000
|
$7,700.000
|
|
|
ASPHALT DRIVEWAY REPAIR
|
LF
|
1.000
|
$2,775.000
|
$100.000
|
$2,200.000
|
$3,000.000
|
|
|
RESEEDING DISTURBED AREAS
|
LF
|
234.000
|
$7.630
|
$6.000
|
$2.200
|
$8.800
|
|
|
3" RJ SDR 21 CL 200 PVC
|
LF
|
236.000
|
$41.250
|
$40.000
|
$36.000
|
$25.000
|
|
|
8" DIRECTIONAL DRILL
|
LF
|
73.000
|
$142.500
|
$80.000
|
$145.000
|
$110.000
|
|
|
6" STEEL ENCASEMENT
|
LF
|
220.000
|
$78.750
|
$70.000
|
$57.000
|
$71.500
|
|
|
6" DRY BORE
|
LF
|
220.000
|
$106.250
|
$90.000
|
$184.000
|
$121.000
|
|
|
14" STEEL ENCASEMENT
|
LF
|
251.000
|
$158.750
|
$85.000
|
$123.000
|
$110.000
|
|
|
14" DRY BORE
|
LF
|
249.000
|
$148.750
|
$230.000
|
$355.000
|
$231.000
|
|
|
SAND EMBEDMENT
|
LF
|
35.100
|
$93.750
|
$35.000
|
$95.000
|
$11.000
|
|
|
ABAN EX 6" WATERLINE WITH CELLULAR GRT
|
LF
|
1,125.000
|
$30.000
|
$8.000
|
$31.000
|
$19.800
|
|
|
ABAN EX 2" WATERLINE WITH CELLULAR GRT
|
LF
|
75.000
|
$12.500
|
$4.000
|
$78.000
|
$66.000
|
|
Totals: |
$1,969,249.465
|
$1,958,509.100
|
$2,364,241.520
|
$2,819,845.658
|