REMOVING CONC (RIPRAP)
|
SY
|
4.000
|
$17.680
|
$500.000
|
$375.000
|
$200.000
|
$430.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
348.000
|
$11.000
|
$10.000
|
$30.000
|
$29.000
|
$14.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
149.880
|
$149.570
|
$180.000
|
$250.000
|
$420.000
|
$575.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (1 1/2")
|
SY
|
39,069.000
|
$1.150
|
$2.000
|
$1.750
|
$2.000
|
$2.000
|
|
|
SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2")
|
SY
|
2,596.000
|
$1.870
|
$1.500
|
$1.750
|
$8.500
|
$3.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (4")
|
SY
|
274.000
|
$3.790
|
$8.000
|
$15.000
|
$11.000
|
$13.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
32,526.000
|
$3.100
|
$3.100
|
$2.970
|
$4.250
|
$4.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
651.000
|
$120.000
|
$95.000
|
$115.000
|
$124.000
|
$194.000
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
11.000
|
$64.980
|
$120.000
|
$300.000
|
$159.000
|
$230.000
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
47.000
|
$66.150
|
$100.000
|
$180.000
|
$98.000
|
$144.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
7,646.000
|
$74.000
|
$84.500
|
$88.000
|
$86.000
|
$97.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
160.000
|
$20.910
|
$40.000
|
$70.000
|
$86.000
|
$95.000
|
|
|
FULL - DEPTH REPAIR CRCP (9")
|
SY
|
214.000
|
$250.000
|
$480.000
|
$360.000
|
$360.000
|
$396.000
|
|
|
CEM STABIL BKFL
|
CY
|
18.000
|
$40.000
|
$100.000
|
$100.000
|
$110.000
|
$267.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
8.000
|
$360.000
|
$600.000
|
$400.000
|
$400.000
|
$360.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
64.000
|
$458.850
|
$450.000
|
$600.000
|
$600.000
|
$682.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$57,105.960
|
$25,000.000
|
$50,000.000
|
$63,000.000
|
$150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$3,500.000
|
$2,500.000
|
$2,500.000
|
$4,300.000
|
$15,300.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$20.000
|
$30.000
|
$30.000
|
$17.000
|
$21.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
375.000
|
$22.000
|
$37.000
|
$24.000
|
$27.000
|
$20.040
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
6.000
|
$1,834.080
|
$2,500.000
|
$2,000.000
|
$1,700.000
|
$1,214.930
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
275.000
|
$2.210
|
$5.000
|
$3.000
|
$6.500
|
$3.030
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$200.000
|
$750.000
|
$100.000
|
$135.000
|
$75.750
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,700.000
|
$3,500.000
|
$2,750.000
|
$2,700.000
|
$2,625.940
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$267.510
|
$500.000
|
$250.000
|
$270.000
|
$202.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
96.000
|
$27.500
|
$35.000
|
$15.000
|
$30.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
37.000
|
$28.870
|
$45.000
|
$25.000
|
$50.000
|
$20.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
13,128.000
|
$0.310
|
$0.170
|
$0.160
|
$0.200
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
111,880.000
|
$0.150
|
$0.160
|
$0.160
|
$0.170
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
3,342.000
|
$0.380
|
$3.000
|
$0.250
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,585.000
|
$1.500
|
$1.000
|
$1.250
|
$1.100
|
$1.010
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$57.990
|
$50.000
|
$55.000
|
$55.000
|
$50.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)(RR XING)
|
EA
|
16.000
|
$115.000
|
$215.000
|
$85.000
|
$230.000
|
$217.150
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
4.000
|
$61.020
|
$70.000
|
$55.000
|
$75.000
|
$70.700
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,120.000
|
$0.200
|
$0.180
|
$0.350
|
$0.200
|
$0.180
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
97,860.000
|
$0.170
|
$0.160
|
$0.160
|
$0.170
|
$0.160
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,221.000
|
$0.750
|
$0.700
|
$0.750
|
$0.750
|
$0.710
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
619.000
|
$5.100
|
$5.000
|
$6.000
|
$5.500
|
$5.050
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
605.000
|
$1.270
|
$0.850
|
$0.850
|
$1.000
|
$0.860
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
116.000
|
$3.040
|
$2.750
|
$3.000
|
$3.000
|
$2.780
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
7,249.000
|
$0.760
|
$0.810
|
$1.000
|
$0.900
|
$0.820
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,670.000
|
$0.490
|
$0.490
|
$0.550
|
$0.550
|
$0.490
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
36,809.000
|
$0.460
|
$0.460
|
$0.480
|
$0.500
|
$0.460
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
61,111.000
|
$0.470
|
$0.460
|
$0.480
|
$0.500
|
$0.460
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$212.760
|
$215.000
|
$200.000
|
$230.000
|
$217.150
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$300.090
|
$260.000
|
$300.000
|
$280.000
|
$262.600
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
7.000
|
$612.650
|
$425.000
|
$550.000
|
$460.000
|
$429.240
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
22.000
|
$36.000
|
$28.000
|
$32.000
|
$30.000
|
$28.280
|
|
REFL PAV MRKR TY I-C
|
EA
|
85.000
|
$4.000
|
$4.000
|
$3.000
|
$4.250
|
$4.040
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
604.000
|
$4.000
|
$4.000
|
$3.000
|
$4.250
|
$4.040
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
64,331.000
|
$0.420
|
$0.190
|
$0.010
|
$0.200
|
$0.190
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,246.000
|
$0.580
|
$0.400
|
$0.020
|
$0.450
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
82.000
|
$2.000
|
$1.500
|
$0.020
|
$1.600
|
$1.510
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
3.000
|
$133.570
|
$75.000
|
$0.020
|
$80.000
|
$75.750
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
97,920.000
|
$0.060
|
$0.010
|
$0.030
|
$0.010
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,826.000
|
$0.130
|
$0.030
|
$0.040
|
$0.030
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
116.000
|
$0.240
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
619.000
|
$0.450
|
$0.250
|
$0.060
|
$0.300
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$10.320
|
$3.000
|
$1.000
|
$3.250
|
$3.030
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$14.680
|
$3.000
|
$1.000
|
$3.250
|
$3.030
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
7.000
|
$25.770
|
$10.000
|
$1.000
|
$11.000
|
$10.100
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
22.000
|
$8.490
|
$0.500
|
$1.000
|
$0.550
|
$0.510
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
0.830
|
$200.000
|
$4,200.000
|
$6,000.000
|
$4,000.000
|
$10,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$3,350.000
|
$2,000.000
|
$8,000.000
|
$750.000
|
$5,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
35.000
|
$300.000
|
$185.000
|
$300.000
|
$550.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
176.000
|
$85.000
|
$55.000
|
$20.000
|
$84.000
|
$100.000
|
|
Totals: |
$1,213,337.122
|
$1,335,803.720
|
$1,375,685.210
|
$1,494,937.880
|
$1,765,463.930
|