|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
2,967.000
|
$5.000
|
$10.000
|
$7.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
21,086.000
|
$2.760
|
$11.000
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(15")
|
SY
|
450.000
|
$6.650
|
$20.000
|
$24.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
132.700
|
$900.000
|
$1,400.000
|
$950.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,613.000
|
$8.000
|
$30.000
|
$27.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
205.290
|
$176.000
|
$250.000
|
$630.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
40,496.000
|
$1.000
|
$0.500
|
$2.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
40,496.000
|
$0.200
|
$0.140
|
$0.500
|
|
|
DRILL SEEDING (PERM)(WARM OR COOL)
|
SY
|
40,496.000
|
$0.200
|
$0.180
|
$0.150
|
|
|
FERTILIZER
|
AC
|
8.370
|
$800.000
|
$600.000
|
$300.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,004.000
|
$17.000
|
$12.000
|
$32.000
|
|
|
CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(10")
|
SY
|
28,456.000
|
$45.000
|
$35.000
|
$41.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (1 1/2")
|
SY
|
11,681.000
|
$3.000
|
$4.000
|
$3.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (3 1/2")
|
SY
|
2,629.000
|
$5.000
|
$6.000
|
$5.000
|
|
|
SALV,HAUL & STKPL RCL APH PV (2")
|
SY
|
450.000
|
$1.090
|
$5.000
|
$4.000
|
|
|
SLV, HAUL, & STKPL REL APH PV (9")
|
SY
|
3,869.000
|
$5.220
|
$8.000
|
$10.000
|
|
|
SALV, HAUL & STKPL RECLM ASPH PAV(5.5")
|
SY
|
21,086.000
|
$1.400
|
$6.000
|
$7.000
|
|
|
SALV,HAUL & STKPL RECL ASPH PAV (4.5")
|
SY
|
1,240.000
|
$1.400
|
$6.000
|
$6.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
14,186.000
|
$2.900
|
$4.000
|
$4.500
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
284.000
|
$130.000
|
$130.000
|
$280.000
|
|
|
D-GR HMA(SQ) TY-D PG76-22
|
TON
|
1,437.000
|
$100.000
|
$130.000
|
$164.500
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
160.000
|
$114.000
|
$170.000
|
$125.750
|
|
|
PFC-C (AGGREGATE) (PG76 MIX) SAC-B
|
TON
|
2,304.000
|
$120.000
|
$170.000
|
$125.750
|
|
|
CEM STABIL BKFL
|
CY
|
142.000
|
$49.000
|
$100.000
|
$53.500
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
370.000
|
$60.000
|
$150.000
|
$130.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
12.000
|
$900.000
|
$2,000.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.010
|
$251,842.000
|
$170,000.000
|
$180,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$10,000.000
|
$3,000.000
|
$1,900.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,800.000
|
$2.500
|
$3.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,800.000
|
$0.800
|
$1.750
|
$1.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
22,842.000
|
$0.600
|
$0.380
|
$0.900
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
1,483.000
|
$35.000
|
$15.000
|
$34.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
34.000
|
$620.000
|
$480.000
|
$775.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$890.000
|
$520.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
40.000
|
$755.000
|
$550.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
|
EA
|
9.000
|
$540.000
|
$520.000
|
$700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
69.000
|
$144.000
|
$100.000
|
$101.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
12.000
|
$55.000
|
$95.000
|
$150.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
10,000.000
|
$1.200
|
$0.500
|
$0.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,000.000
|
$1.100
|
$0.800
|
$1.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
20.000
|
$150.000
|
$100.000
|
$126.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
20.000
|
$175.000
|
$200.000
|
$252.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
40.000
|
$160.000
|
$100.000
|
$126.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,750.000
|
$0.500
|
$0.600
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
43,743.000
|
$0.500
|
$0.600
|
$0.750
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
7,276.000
|
$0.650
|
$0.750
|
$0.950
|
|
REFL PAV MRKR TY I-A
|
EA
|
284.000
|
$3.500
|
$3.500
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
2,859.000
|
$0.300
|
$0.400
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
7,179.000
|
$0.500
|
$0.700
|
$0.900
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
30,118.000
|
$0.030
|
$0.070
|
$0.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
294.000
|
$23.000
|
$60.000
|
$95.000
|
|
|
TMA (STATIONARY)
|
DAY
|
69.000
|
$315.000
|
$600.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
27.000
|
$560.000
|
$200.000
|
$660.000
|
|
Totals: |
$2,852,771.040
|
$3,067,734.140
|
$3,385,296.750
|