REMOVING CONC (RIPRAP)
|
SY
|
276.000
|
$5.000
|
$15.000
|
$8.000
|
$8.500
|
$16.690
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
2,086.000
|
$10.330
|
$19.000
|
$6.000
|
$7.750
|
$3.480
|
|
|
BACKFILL (TY B)
|
STA
|
982.030
|
$165.000
|
$75.000
|
$50.000
|
$88.500
|
$164.170
|
|
|
ASPH (A-R TYPE II OR III)
|
GAL
|
254,301.000
|
$3.280
|
$2.880
|
$3.000
|
$5.070
|
$3.740
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
3,699.000
|
$128.660
|
$90.000
|
$110.000
|
$125.000
|
$155.100
|
|
|
D-GR HMA(SQ) TY-D PG76-22
|
TON
|
1,006.000
|
$105.000
|
$110.000
|
$152.000
|
$86.000
|
$135.670
|
|
|
TACK COAT
|
GAL
|
27,743.000
|
$3.750
|
$2.000
|
$2.100
|
$1.750
|
$3.140
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
2,219.000
|
$105.000
|
$108.000
|
$111.000
|
$114.000
|
$112.000
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
31,905.000
|
$110.000
|
$108.000
|
$111.000
|
$114.000
|
$112.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
1,921.000
|
$129.000
|
$103.000
|
$110.000
|
$110.000
|
$120.410
|
|
|
TOM - F (AGGREGATE) SAC - A
|
TON
|
25,514.000
|
$119.240
|
$103.000
|
$110.000
|
$110.000
|
$120.410
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
|
SY
|
400.000
|
$22.000
|
$37.000
|
$40.000
|
$40.000
|
$51.810
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
462,367.000
|
$1.300
|
$0.350
|
$1.050
|
$1.300
|
$1.460
|
|
|
PLANE ASPH CONC PAV (0"- 2 1/2")
|
SY
|
13,864.000
|
$5.000
|
$0.350
|
$4.900
|
$2.700
|
$3.480
|
|
|
PAV JT UNDERSEAL (24")
|
LF
|
1,008.000
|
$18.000
|
$20.000
|
$31.500
|
$30.000
|
$32.070
|
|
|
FULL - DEPTH REPAIR CRCP (10")
|
SY
|
200.000
|
$175.000
|
$400.000
|
$490.000
|
$465.000
|
$213.800
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
20.000
|
$225.000
|
$450.000
|
$735.000
|
$700.000
|
$32.070
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
12.000
|
$360.000
|
$450.000
|
$630.000
|
$600.000
|
$641.390
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
289.000
|
$500.000
|
$650.000
|
$1.000
|
$416.000
|
$523.800
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,008.000
|
$22.000
|
$18.000
|
$19.000
|
$18.000
|
$19.240
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$525,637.830
|
$100,000.000
|
$58,000.000
|
$390,000.000
|
$381,496.160
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$3,500.000
|
$5,000.000
|
$1,520.000
|
$4,800.000
|
$28,564.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,000.000
|
$21.550
|
$20.000
|
$53.000
|
$18.130
|
$20.850
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
24.000
|
$1,949.220
|
$2,200.000
|
$1,575.000
|
$1,611.220
|
$1,443.130
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
13.000
|
$770.000
|
$1,000.000
|
$525.000
|
$882.140
|
$769.670
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,975.000
|
$3.000
|
$1.500
|
$1.200
|
$1.010
|
$1.070
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
15.000
|
$205.480
|
$100.000
|
$185.000
|
$75.530
|
$106.900
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
24.000
|
$2,665.000
|
$2,600.000
|
$2,625.000
|
$2,416.830
|
$2,351.770
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
24.000
|
$355.000
|
$175.000
|
$290.000
|
$151.050
|
$106.900
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$525.000
|
$500.000
|
$435.000
|
$395.000
|
$482.090
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$90.000
|
$100.000
|
$80.000
|
$50.000
|
$64.140
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
24.000
|
$60.000
|
$100.000
|
$52.500
|
$55.000
|
$69.480
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
72.000
|
$25.000
|
$30.000
|
$37.000
|
$25.000
|
$19.240
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
99,600.000
|
$0.290
|
$0.130
|
$0.260
|
$0.200
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
11,520.000
|
$0.480
|
$0.130
|
$0.370
|
$0.240
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
399,284.000
|
$0.250
|
$0.130
|
$0.210
|
$0.180
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
59,812.000
|
$0.450
|
$0.180
|
$0.320
|
$0.400
|
$0.190
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
5,524.000
|
$0.960
|
$1.450
|
$0.600
|
$0.750
|
$1.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
428.000
|
$2.270
|
$2.900
|
$0.700
|
$2.000
|
$3.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
96.000
|
$52.660
|
$85.000
|
$37.000
|
$40.000
|
$90.860
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
96.000
|
$64.500
|
$85.000
|
$42.000
|
$40.000
|
$90.860
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
364,880.000
|
$0.250
|
$0.140
|
$0.210
|
$0.180
|
$0.150
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
2,880.000
|
$1.250
|
$0.550
|
$0.500
|
$1.000
|
$0.590
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
540.000
|
$1.300
|
$0.950
|
$0.650
|
$1.500
|
$1.020
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
14,953.000
|
$1.200
|
$0.750
|
$0.650
|
$0.750
|
$0.800
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,381.000
|
$3.150
|
$2.350
|
$2.100
|
$3.000
|
$2.510
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
107.000
|
$6.400
|
$4.750
|
$3.150
|
$8.000
|
$5.080
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
24,900.000
|
$0.700
|
$0.650
|
$0.500
|
$0.500
|
$0.690
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
24,900.000
|
$0.700
|
$0.520
|
$0.420
|
$0.500
|
$0.560
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
65,785.000
|
$0.500
|
$0.500
|
$0.370
|
$0.400
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
60,215.000
|
$0.500
|
$0.520
|
$0.370
|
$0.400
|
$0.560
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
99,821.000
|
$0.750
|
$0.750
|
$0.780
|
$0.700
|
$0.800
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
91,220.000
|
$0.750
|
$0.750
|
$0.780
|
$0.700
|
$0.800
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
24.000
|
$230.000
|
$175.000
|
$195.000
|
$175.000
|
$187.070
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
24.000
|
$270.000
|
$230.000
|
$235.000
|
$175.000
|
$245.870
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,160.000
|
$4.450
|
$3.950
|
$2.950
|
$4.000
|
$4.220
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
243,721.000
|
$0.050
|
$0.020
|
$0.010
|
$0.040
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
15,493.000
|
$0.100
|
$0.040
|
$0.010
|
$0.080
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
481.000
|
$0.200
|
$0.200
|
$0.020
|
$0.150
|
$0.210
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
107.000
|
$1.000
|
$0.450
|
$0.050
|
$0.250
|
$0.480
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
24.000
|
$10.000
|
$15.000
|
$3.150
|
$5.000
|
$16.030
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
24.000
|
$10.000
|
$15.000
|
$3.150
|
$5.000
|
$16.030
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
20.000
|
$600.000
|
$700.000
|
$515.000
|
$1,400.000
|
$748.290
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
366.000
|
$65.000
|
$75.000
|
$160.000
|
$37.330
|
$43.740
|
|
|
TMA (STATIONARY)
|
DAY
|
168.000
|
$175.000
|
$75.000
|
$160.000
|
$227.500
|
$309.890
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
45.000
|
$250.000
|
$100.000
|
$450.000
|
$578.000
|
$80.170
|
|
Totals: |
$11,074,795.780
|
$9,211,640.250
|
$9,943,004.320
|
$11,013,162.825
|
$11,439,307.685
|