PREPARING ROW
|
STA
|
5.000
|
$2,000.000
|
$4,500.000
|
$1,514.000
|
$3,320.000
|
$3,573.000
|
|
|
PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
20.000
|
$500.000
|
$250.000
|
$694.000
|
$749.000
|
$469.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
836.000
|
$3.000
|
$10.000
|
$17.920
|
$8.200
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
200.000
|
$10.500
|
$8.000
|
$23.080
|
$15.900
|
$11.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
380.000
|
$19.000
|
$8.000
|
$7.830
|
$21.300
|
$8.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,700.000
|
$15.300
|
$9.000
|
$20.590
|
$19.600
|
$7.000
|
|
|
BACKFILL (TY B)
|
LF
|
1,000.000
|
$1.500
|
$11.000
|
$5.950
|
$3.110
|
$4.000
|
|
|
BLOCK SODDING
|
SY
|
1,293.000
|
$3.500
|
$5.000
|
$2.000
|
$5.400
|
$6.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
1,293.000
|
$0.500
|
$0.250
|
$2.000
|
$0.780
|
$1.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
1,293.000
|
$0.200
|
$0.200
|
$2.000
|
$1.170
|
$1.000
|
|
|
FERTILIZER
|
AC
|
0.540
|
$430.000
|
$1,750.000
|
$2,000.000
|
$1,810.000
|
$1,110.000
|
|
|
VEGETATIVE WATERING
|
MG
|
32.060
|
$20.000
|
$40.000
|
$77.000
|
$6.000
|
$31.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
1,350.000
|
$13.250
|
$18.000
|
$18.210
|
$17.500
|
$53.000
|
|
|
LIME TRT (NEW BASE) (6")
|
SY
|
1,350.000
|
$2.500
|
$4.000
|
$7.310
|
$8.900
|
$5.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
17.750
|
$160.000
|
$170.000
|
$241.630
|
$213.000
|
$194.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
166.500
|
$3.000
|
$20.000
|
$56.210
|
$7.500
|
$4.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
435.000
|
$72.000
|
$105.000
|
$133.860
|
$112.000
|
$59.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG70-22
|
TON
|
137.000
|
$87.000
|
$125.000
|
$136.420
|
$138.000
|
$172.000
|
|
|
CEM STABIL BKFL
|
CY
|
95.000
|
$75.000
|
$55.000
|
$100.000
|
$140.000
|
$136.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
30.000
|
$15.000
|
$2.000
|
$84.140
|
$15.600
|
$36.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
400.000
|
$40.000
|
$30.000
|
$33.000
|
$24.800
|
$42.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
420.000
|
$100.000
|
$105.000
|
$183.000
|
$170.000
|
$90.000
|
|
|
CL C CONC (ABUT)
|
CY
|
25.800
|
$900.000
|
$900.000
|
$500.000
|
$1,090.000
|
$790.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
1,810.000
|
$15.000
|
$11.500
|
$40.000
|
$20.400
|
$17.000
|
|
|
APPROACH SLAB
|
CY
|
51.500
|
$418.000
|
$400.000
|
$196.050
|
$597.000
|
$555.000
|
|
|
SHEAR KEY
|
CY
|
8.000
|
$30.000
|
$300.000
|
$297.970
|
$413.000
|
$506.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
357.000
|
$185.000
|
$200.000
|
$187.000
|
$199.000
|
$215.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
47.000
|
$430.000
|
$305.000
|
$342.640
|
$527.000
|
$377.000
|
|
|
RAIL (TY T223)
|
LF
|
144.000
|
$120.000
|
$145.000
|
$54.690
|
$140.000
|
$119.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
64.000
|
$330.000
|
$300.000
|
$405.920
|
$381.000
|
$343.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$7,100.000
|
$15,000.000
|
$7,000.000
|
$9,680.000
|
$14,502.000
|
|
|
REMOV STR (PIPE)
|
LF
|
60.000
|
$22.000
|
$10.000
|
$12.000
|
$27.400
|
$50.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$15,000.000
|
$20,000.000
|
$15,000.000
|
$22,900.000
|
$24,276.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$60,000.000
|
$54,050.000
|
$70,000.000
|
$73,000.000
|
$133,562.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,000.000
|
$2,250.000
|
$4,500.000
|
$5,460.000
|
$5,345.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
45.000
|
$32.000
|
$20.000
|
$45.160
|
$73.000
|
$37.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
45.000
|
$9.000
|
$10.000
|
$28.050
|
$16.400
|
$12.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$23.000
|
$20.000
|
$8.800
|
$42.100
|
$36.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$8.000
|
$10.000
|
$5.010
|
$14.400
|
$13.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
425.000
|
$3.000
|
$5.000
|
$1.840
|
$6.400
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
425.000
|
$1.000
|
$1.000
|
$1.830
|
$1.260
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
30.000
|
$5.000
|
$8.000
|
$30.950
|
$8.700
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
30.000
|
$2.000
|
$1.000
|
$5.210
|
$2.090
|
$1.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
120.000
|
$11.000
|
$20.000
|
$43.940
|
$14.600
|
$34.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$11.000
|
$20.000
|
$49.890
|
$20.900
|
$43.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
120.000
|
$11.000
|
$20.000
|
$42.100
|
$14.400
|
$34.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$11.000
|
$20.000
|
$63.000
|
$18.800
|
$43.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
169.000
|
$33.000
|
$30.000
|
$53.680
|
$56.000
|
$72.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
180.000
|
$22.000
|
$20.000
|
$22.880
|
$32.400
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$1,500.000
|
$1,650.000
|
$706.000
|
$1,270.000
|
$1,221.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$750.000
|
$1,400.000
|
$649.000
|
$1,040.000
|
$999.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,400.000
|
$1,350.000
|
$1,740.000
|
$3,010.000
|
$2,886.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
480.000
|
$20.000
|
$5.000
|
$9.570
|
$14.900
|
$13.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$540.000
|
$350.000
|
$176.000
|
$694.000
|
$666.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$575.000
|
$450.000
|
$120.000
|
$926.000
|
$888.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$70.000
|
$65.000
|
$3.790
|
$11.600
|
$11.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
24.000
|
$30.000
|
$65.000
|
$7.580
|
$20.800
|
$20.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,040.000
|
$0.200
|
$1.000
|
$1.260
|
$1.740
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
48.000
|
$2.000
|
$8.000
|
$9.350
|
$5.800
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
200.000
|
$0.200
|
$1.000
|
$0.800
|
$1.740
|
$1.000
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
1,000.000
|
$0.250
|
$3.000
|
$1.260
|
$2.310
|
$1.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
1,000.000
|
$0.250
|
$3.000
|
$1.260
|
$2.310
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
14.000
|
$2.750
|
$55.000
|
$19.000
|
$11.600
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,240.000
|
$0.250
|
$1.000
|
$1.260
|
$0.580
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
48.000
|
$1.500
|
$3.000
|
$3.000
|
$5.800
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
2,000.000
|
$0.030
|
$0.600
|
$1.260
|
$0.010
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
48.000
|
$0.150
|
$0.500
|
$1.260
|
$0.060
|
$1.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
250.000
|
$5.000
|
$15.000
|
$25.000
|
$12.200
|
$10.000
|
|
Totals: |
$568,799.700
|
$602,388.750
|
$731,870.112
|
$766,467.790
|
$775,364.260
|