PREPARING ROW
|
STA
|
13.400
|
$3,000.000
|
$9,500.000
|
$8,000.000
|
$1,300.000
|
$12,000.000
|
$10,000.000
|
$9,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
729.000
|
$5.000
|
$9.000
|
$7.000
|
$6.000
|
$17.000
|
$6.000
|
$20.000
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
1,795.000
|
$5.000
|
$9.000
|
$9.000
|
$6.000
|
$17.000
|
$7.000
|
$28.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(1"-9")
|
SY
|
97.000
|
$2.000
|
$13.000
|
$8.000
|
$6.000
|
$6.000
|
$6.000
|
$30.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,421.000
|
$10.000
|
$19.000
|
$20.000
|
$17.000
|
$20.000
|
$17.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
393.000
|
$20.000
|
$36.000
|
$22.000
|
$32.000
|
$15.000
|
$22.000
|
$65.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,844.000
|
$25.000
|
$15.000
|
$22.000
|
$32.000
|
$16.000
|
$6.000
|
$45.000
|
|
|
BLOCK SODDING
|
SY
|
60,874.000
|
$3.000
|
$1.000
|
$3.500
|
$2.750
|
$0.300
|
$3.350
|
$3.400
|
|
|
STRAW OR HAY MULCH
|
SY
|
60,874.000
|
$0.200
|
$0.280
|
$0.100
|
$0.350
|
$0.010
|
$0.120
|
$0.300
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
60,874.000
|
$0.100
|
$0.080
|
$0.050
|
$0.170
|
$0.010
|
$0.300
|
$0.100
|
|
|
FERTILIZER
|
AC
|
25.100
|
$700.000
|
$702.000
|
$500.000
|
$700.000
|
$75.000
|
$600.000
|
$1,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
3,012.000
|
$15.000
|
$1.000
|
$20.000
|
$14.000
|
$2.000
|
$20.000
|
$30.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
514.000
|
$1.000
|
$1.200
|
$2.000
|
$2.300
|
$1.200
|
$2.000
|
$2.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
1,758.000
|
$70.000
|
$95.000
|
$96.000
|
$115.000
|
$100.000
|
$95.000
|
$150.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG70-22
|
TON
|
295.000
|
$80.000
|
$133.000
|
$130.000
|
$230.000
|
$140.000
|
$133.000
|
$200.000
|
|
|
D-GR HMA(SQ) TY-D PG70-22
|
TON
|
308.000
|
$120.000
|
$133.000
|
$130.000
|
$145.000
|
$140.000
|
$133.000
|
$200.000
|
|
|
CEM STABIL BKFL
|
CY
|
197.100
|
$60.000
|
$40.000
|
$60.000
|
$46.000
|
$85.000
|
$40.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
40.000
|
$10.000
|
$1.000
|
$5.000
|
$2.300
|
$1.000
|
$1.000
|
$1.000
|
|
|
SHEET PILING (PZ - 22)
|
SF
|
1,921.000
|
$45.000
|
$42.000
|
$45.000
|
$74.000
|
$50.000
|
$37.000
|
$65.000
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
1,730.000
|
$75.000
|
$76.000
|
$178.000
|
$80.000
|
$125.000
|
$150.000
|
$150.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
460.000
|
$140.000
|
$190.000
|
$161.000
|
$138.000
|
$250.000
|
$360.000
|
$250.000
|
|
|
CL C CONC (ABUT)
|
CY
|
95.200
|
$950.000
|
$1,075.000
|
$1,500.000
|
$1,100.000
|
$1,400.000
|
$2,750.000
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
32.000
|
$1,050.000
|
$1,400.000
|
$1,500.000
|
$1,800.000
|
$1,400.000
|
$4,250.000
|
$1,500.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
8,052.000
|
$15.000
|
$20.000
|
$14.000
|
$16.000
|
$11.000
|
$20.000
|
$30.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
235.500
|
$180.000
|
$225.000
|
$180.000
|
$160.000
|
$200.000
|
$230.000
|
$180.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
754.900
|
$180.000
|
$225.000
|
$180.000
|
$165.000
|
$200.000
|
$270.000
|
$180.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
148.500
|
$180.000
|
$225.000
|
$180.000
|
$160.000
|
$200.000
|
$330.000
|
$180.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
509.500
|
$180.000
|
$225.000
|
$180.000
|
$188.000
|
$200.000
|
$250.000
|
$180.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
317.000
|
$420.000
|
$900.000
|
$300.000
|
$508.000
|
$500.000
|
$550.000
|
$800.000
|
|
|
RIPRAP (STONE TY R)(GROUT)(8 IN)
|
CY
|
108.000
|
$500.000
|
$180.000
|
$240.000
|
$250.000
|
$250.000
|
$200.000
|
$400.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
733.000
|
$205.000
|
$193.000
|
$75.000
|
$250.000
|
$200.000
|
$165.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
77.000
|
$500.000
|
$750.000
|
$400.000
|
$750.000
|
$600.000
|
$450.000
|
$800.000
|
|
|
RAIL (TY T223)
|
LF
|
609.700
|
$100.000
|
$110.000
|
$80.000
|
$88.000
|
$130.000
|
$110.000
|
$125.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
42.000
|
$160.000
|
$320.000
|
$250.000
|
$280.000
|
$200.000
|
$500.000
|
$400.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
72.000
|
$60.000
|
$85.000
|
$70.000
|
$71.000
|
$75.000
|
$150.000
|
$85.000
|
|
|
SET (TY I)(S=3 FT)(HW= 6 FT)(3:1)(C)
|
EA
|
1.000
|
$6,000.000
|
$8,000.000
|
$10,000.000
|
$5,100.000
|
$6,000.000
|
$20,000.000
|
$20,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 7 FT)(3:1)(C)
|
EA
|
1.000
|
$8,000.000
|
$8,000.000
|
$10,000.000
|
$8,300.000
|
$6,000.000
|
$20,000.000
|
$20,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,250.000
|
$1,800.000
|
$800.000
|
$1,100.000
|
$2,200.000
|
$2,500.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
76.000
|
$25.000
|
$7.000
|
$5.000
|
$22.000
|
$25.000
|
$10.000
|
$25.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
4.000
|
$20,000.000
|
$30,000.000
|
$50,000.000
|
$14,000.000
|
$50,000.000
|
$30,000.000
|
$20,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$230,000.000
|
$260,000.000
|
$260,000.000
|
$280,000.000
|
$290,000.000
|
$235,000.000
|
$390,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$5,000.000
|
$1,500.000
|
$2,000.000
|
$3,000.000
|
$3,200.000
|
$2,500.000
|
$7,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
400.000
|
$35.000
|
$29.190
|
$40.000
|
$44.000
|
$35.000
|
$38.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
400.000
|
$15.000
|
$13.000
|
$12.000
|
$11.000
|
$12.000
|
$10.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,200.000
|
$30.000
|
$31.360
|
$30.000
|
$32.000
|
$35.000
|
$28.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,200.000
|
$10.000
|
$6.000
|
$10.000
|
$11.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,819.000
|
$3.000
|
$5.310
|
$3.000
|
$5.000
|
$6.000
|
$4.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,819.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
60.000
|
$35.000
|
$17.000
|
$50.000
|
$85.000
|
$40.000
|
$30.000
|
$120.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$50.000
|
$17.000
|
$50.000
|
$85.000
|
$40.000
|
$40.000
|
$120.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
60.000
|
$10.000
|
$12.000
|
$10.000
|
$10.000
|
$15.000
|
$20.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$12.000
|
$15.000
|
$10.000
|
$15.000
|
$30.000
|
$15.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
685.000
|
$35.000
|
$29.280
|
$50.000
|
$70.000
|
$55.000
|
$70.000
|
$85.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
337.500
|
$25.000
|
$21.000
|
$27.250
|
$24.000
|
$25.000
|
$22.000
|
$28.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
350.000
|
$25.000
|
$21.000
|
$27.250
|
$24.000
|
$25.000
|
$22.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,650.000
|
$1,715.000
|
$1,625.000
|
$2,500.000
|
$1,800.000
|
$1,500.000
|
$1,800.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
8.000
|
$1,100.000
|
$1,170.000
|
$1,025.000
|
$1,200.000
|
$1,200.000
|
$1,100.000
|
$1,800.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$900.000
|
$750.000
|
$1,005.000
|
$807.000
|
$800.000
|
$950.000
|
$1,500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$2,600.000
|
$2,630.000
|
$2,550.000
|
$3,200.000
|
$2,700.000
|
$2,450.000
|
$3,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$410.000
|
$495.000
|
$540.000
|
$575.000
|
$450.000
|
$539.590
|
$750.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$85.000
|
$85.000
|
$87.310
|
$90.000
|
$75.000
|
$87.310
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
15.000
|
$15.000
|
$20.000
|
$30.000
|
$26.000
|
$10.000
|
$24.750
|
$12.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
42.000
|
$15.000
|
$30.000
|
$30.000
|
$27.000
|
$15.000
|
$24.750
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
23.000
|
$25.000
|
$50.000
|
$75.000
|
$73.000
|
$40.000
|
$53.710
|
$120.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
27.000
|
$5.000
|
$15.000
|
$21.000
|
$5.500
|
$15.000
|
$21.000
|
$27.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
5,110.000
|
$0.150
|
$0.400
|
$0.500
|
$0.200
|
$0.400
|
$0.500
|
$0.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
27.000
|
$0.500
|
$3.000
|
$1.500
|
$2.000
|
$3.000
|
$1.500
|
$1.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,588.000
|
$0.500
|
$1.350
|
$1.000
|
$0.300
|
$1.400
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
2,522.000
|
$0.500
|
$1.350
|
$1.000
|
$0.300
|
$1.400
|
$1.000
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
34.000
|
$4.000
|
$8.000
|
$15.000
|
$3.000
|
$8.000
|
$15.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
5,110.000
|
$0.100
|
$0.200
|
$0.200
|
$0.100
|
$0.200
|
$0.200
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
27.000
|
$0.800
|
$1.200
|
$1.500
|
$0.200
|
$1.200
|
$1.500
|
$1.500
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
34.000
|
$0.200
|
$1.000
|
$3.000
|
$1.000
|
$1.000
|
$3.000
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,284.000
|
$25.000
|
$20.000
|
$10.000
|
$52.000
|
$35.000
|
$71.740
|
$85.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$3,500.000
|
$720.000
|
$500.000
|
$12,000.000
|
$2,500.000
|
$3,000.000
|
$12,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$400.000
|
$450.000
|
$200.000
|
$330.000
|
$250.000
|
$285.000
|
$250.000
|
|
Totals: |
$2,529,569.100
|
$2,849,523.730
|
$2,905,558.505
|
$2,910,566.780
|
$2,969,423.380
|
$3,509,667.920
|
$4,088,021.700
|