|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
13.200
|
$375.000
|
$2,000.000
|
$3,750.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
29.410
|
$25.000
|
$18.000
|
$140.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
13.200
|
$190.000
|
$500.000
|
$680.000
|
|
|
BLOCK SODDING
|
SY
|
2,949.000
|
$3.500
|
$4.500
|
$6.500
|
|
|
FERTILIZER
|
AC
|
0.610
|
$561.110
|
$1,000.000
|
$1,520.000
|
|
|
VEGETATIVE WATERING
|
MG
|
73.120
|
$26.210
|
$20.000
|
$100.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
1,473.000
|
$16.000
|
$45.000
|
$48.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
361.000
|
$94.000
|
$145.000
|
$170.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
410.000
|
$5.000
|
$5.000
|
$8.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
2,488.000
|
$3.250
|
$10.000
|
$4.500
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
60.000
|
$171.750
|
$280.000
|
$440.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
54.000
|
$90.000
|
$160.000
|
$450.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
90.000
|
$31.680
|
$80.000
|
$250.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
6,193.000
|
$2.750
|
$4.000
|
$5.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$27,050.580
|
$40,000.000
|
$60,200.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
2.000
|
$3,500.000
|
$15,000.000
|
$1,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
75.000
|
$5.410
|
$5.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
75.000
|
$1.190
|
$2.500
|
$5.500
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
80.000
|
$65.000
|
$80.000
|
$160.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$290.000
|
$500.000
|
$360.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$350.000
|
$550.000
|
$475.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
93.500
|
$36.000
|
$18.000
|
$48.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$620.000
|
$700.000
|
$700.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$573.800
|
$900.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$96.000
|
$135.000
|
$130.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
5,622.000
|
$0.230
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,020.000
|
$0.550
|
$0.900
|
$0.950
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
22.000
|
$3.600
|
$6.000
|
$4.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$65.000
|
$100.000
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
4.000
|
$70.000
|
$110.000
|
$165.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
7,750.000
|
$0.230
|
$0.500
|
$0.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
510.000
|
$0.900
|
$2.200
|
$2.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
11.000
|
$7.360
|
$13.000
|
$8.100
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$130.000
|
$300.000
|
$310.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$147.000
|
$280.000
|
$310.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,875.000
|
$0.500
|
$1.000
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
2,811.000
|
$0.620
|
$2.500
|
$2.100
|
|
REFL PAV MRKR TY I-C
|
EA
|
27.000
|
$4.500
|
$6.500
|
$7.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
192.000
|
$4.500
|
$6.500
|
$7.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
6,686.000
|
$0.100
|
$0.100
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
510.000
|
$0.150
|
$0.150
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
11.000
|
$0.280
|
$0.300
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$15.500
|
$8.000
|
$16.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$15.500
|
$8.000
|
$16.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$399.830
|
$850.000
|
$850.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
4.000
|
$76.240
|
$250.000
|
$225.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$7,500.000
|
$7,800.000
|
$8,000.000
|
|
|
TACK COAT
|
GAL
|
170.000
|
$3.500
|
$4.000
|
$4.250
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
155.000
|
$150.000
|
$180.000
|
$250.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
|
TON
|
630.000
|
$180.000
|
$180.000
|
$195.000
|
|
|
TMA (STATIONARY)
|
DAY
|
27.000
|
$210.000
|
$250.000
|
$270.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
3.000
|
$633.710
|
$500.000
|
$700.000
|
|
Totals: |
$344,771.762
|
$532,257.180
|
$645,984.990
|