PREPARING ROW
|
STA
|
27.530
|
$6,000.000
|
$1,100.000
|
$22,000.000
|
$24,000.000
|
$9,000.000
|
$12,000.000
|
$9,000.000
|
$2,005.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
466.000
|
$20.000
|
$15.000
|
$8.000
|
$7.290
|
$12.000
|
$6.000
|
$12.000
|
$43.250
|
|
|
REMOVING CONC (DRAIN)
|
SY
|
68.000
|
$30.000
|
$15.000
|
$20.000
|
$15.280
|
$13.000
|
$20.000
|
$15.000
|
$137.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,187.000
|
$7.000
|
$5.000
|
$3.000
|
$7.700
|
$2.750
|
$7.000
|
$8.000
|
$14.500
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
10,184.000
|
$8.000
|
$6.500
|
$5.000
|
$5.180
|
$8.000
|
$10.000
|
$7.000
|
$7.550
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,957.140
|
$31.000
|
$25.000
|
$15.000
|
$25.720
|
$23.000
|
$10.000
|
$10.000
|
$26.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,338.580
|
$34.000
|
$15.000
|
$13.000
|
$24.930
|
$23.000
|
$20.000
|
$12.800
|
$47.250
|
|
|
BLOCK SODDING
|
SY
|
10,246.170
|
$5.000
|
$4.350
|
$3.750
|
$4.350
|
$3.750
|
$4.000
|
$7.500
|
$1.450
|
|
|
FERTILIZER
|
AC
|
2.120
|
$655.340
|
$1,180.000
|
$500.000
|
$1,176.700
|
$500.000
|
$520.000
|
$2,000.000
|
$1,191.000
|
|
|
VEGETATIVE WATERING
|
MG
|
255.000
|
$18.830
|
$130.000
|
$32.000
|
$125.950
|
$12.000
|
$30.000
|
$29.000
|
$23.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
12,803.000
|
$5.000
|
$4.750
|
$6.000
|
$6.620
|
$3.500
|
$6.000
|
$5.000
|
$7.500
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
205.000
|
$300.000
|
$325.000
|
$325.000
|
$316.820
|
$320.000
|
$300.000
|
$250.000
|
$315.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TYA)(GR1-2)(9")
|
SY
|
12,803.000
|
$35.000
|
$20.000
|
$18.000
|
$29.960
|
$45.000
|
$22.000
|
$24.000
|
$41.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (3")
|
SY
|
10,083.000
|
$8.000
|
$2.000
|
$3.000
|
$3.320
|
$2.400
|
$3.500
|
$4.000
|
$5.460
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
3,742.000
|
$10.000
|
$5.250
|
$5.300
|
$5.370
|
$5.300
|
$5.500
|
$6.500
|
$9.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
48.000
|
$312.000
|
$240.000
|
$242.420
|
$852.130
|
$242.000
|
$250.000
|
$280.000
|
$843.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
46.000
|
$312.000
|
$240.000
|
$242.420
|
$852.130
|
$242.000
|
$250.000
|
$280.000
|
$892.000
|
|
|
CEM STABIL BKFL
|
CY
|
600.000
|
$100.000
|
$100.000
|
$71.290
|
$79.880
|
$145.000
|
$80.000
|
$55.000
|
$195.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
266.000
|
$150.000
|
$125.000
|
$85.000
|
$77.560
|
$124.000
|
$140.000
|
$255.000
|
$237.250
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
1,487.000
|
$275.000
|
$325.000
|
$230.000
|
$194.970
|
$314.000
|
$290.000
|
$330.000
|
$333.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
1,211.000
|
$400.000
|
$775.000
|
$450.000
|
$377.680
|
$480.000
|
$540.000
|
$385.000
|
$601.500
|
|
|
CL C CONC (ABUT)
|
CY
|
167.700
|
$1,700.000
|
$1,575.000
|
$1,500.000
|
$1,021.090
|
$970.000
|
$1,800.000
|
$1,160.000
|
$1,663.000
|
|
|
CL C CONC (CAP)
|
CY
|
137.200
|
$2,000.000
|
$1,650.000
|
$1,300.000
|
$1,258.840
|
$1,500.000
|
$1,600.000
|
$1,400.000
|
$1,680.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
59.300
|
$1,600.000
|
$1,650.000
|
$1,500.000
|
$1,052.580
|
$1,400.000
|
$1,800.000
|
$1,400.000
|
$2,800.000
|
|
|
REINF CONC SLAB
|
SF
|
19,728.000
|
$30.000
|
$35.000
|
$30.000
|
$36.000
|
$25.000
|
$30.000
|
$30.000
|
$34.250
|
|
|
APPROACH SLAB
|
CY
|
367.000
|
$883.000
|
$800.000
|
$461.660
|
$623.750
|
$650.000
|
$800.000
|
$720.000
|
$601.500
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,179.500
|
$260.000
|
$215.000
|
$200.000
|
$163.270
|
$200.000
|
$200.000
|
$320.000
|
$243.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,630.000
|
$190.000
|
$215.000
|
$190.000
|
$162.540
|
$200.000
|
$208.000
|
$330.000
|
$230.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
15.000
|
$520.000
|
$875.000
|
$688.570
|
$663.120
|
$450.000
|
$1,000.000
|
$550.000
|
$2,707.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
1,349.800
|
$235.000
|
$125.000
|
$125.000
|
$189.050
|
$180.000
|
$230.000
|
$185.000
|
$179.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
35.320
|
$900.000
|
$875.000
|
$319.820
|
$599.460
|
$550.000
|
$1,100.000
|
$560.000
|
$1,300.000
|
|
|
RAIL (TY T223)
|
LF
|
908.000
|
$140.000
|
$160.000
|
$75.000
|
$108.650
|
$195.000
|
$170.000
|
$165.000
|
$230.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
312.000
|
$370.000
|
$275.000
|
$175.150
|
$183.870
|
$165.000
|
$200.000
|
$220.000
|
$204.500
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$175,000.000
|
$90,500.000
|
$150,000.000
|
$50,064.590
|
$80,000.000
|
$125,000.000
|
$200,000.000
|
$113,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$808,000.000
|
$138,500.000
|
$612,000.000
|
$667,000.000
|
$623,291.560
|
$650,000.000
|
$700,000.000
|
$780,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$9,697.110
|
$7,500.000
|
$4,000.000
|
$4,565.740
|
$20,000.000
|
$2,300.000
|
$4,800.000
|
$17,200.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
2,400.000
|
$35.000
|
$20.000
|
$40.000
|
$41.470
|
$30.000
|
$40.000
|
$45.000
|
$23.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
2,400.000
|
$14.000
|
$5.000
|
$16.000
|
$10.400
|
$15.000
|
$10.000
|
$10.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
555.000
|
$4.000
|
$4.800
|
$4.000
|
$4.760
|
$3.000
|
$3.500
|
$3.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
425.000
|
$1.300
|
$2.000
|
$1.520
|
$2.020
|
$1.000
|
$0.500
|
$1.000
|
$3.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,620.000
|
$59.760
|
$50.000
|
$50.000
|
$85.790
|
$55.000
|
$80.000
|
$105.000
|
$48.500
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
870.000
|
$11.720
|
$7.500
|
$4.000
|
$3.180
|
$7.500
|
$5.000
|
$12.000
|
$17.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,620.000
|
$11.720
|
$10.000
|
$5.330
|
$11.730
|
$3.500
|
$5.000
|
$15.000
|
$19.750
|
|
|
CONC CURB (TY II)
|
LF
|
76.000
|
$6.000
|
$40.000
|
$6.400
|
$33.540
|
$25.000
|
$30.000
|
$15.000
|
$121.000
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
530.000
|
$47.000
|
$50.000
|
$38.980
|
$71.750
|
$23.150
|
$25.000
|
$28.000
|
$168.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
5,504.000
|
$0.800
|
$1.000
|
$0.750
|
$0.610
|
$1.000
|
$1.500
|
$1.200
|
$1.750
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
2,752.000
|
$0.800
|
$1.150
|
$0.750
|
$0.910
|
$1.000
|
$1.500
|
$1.200
|
$1.750
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
175.000
|
$39.000
|
$23.000
|
$26.800
|
$23.000
|
$26.000
|
$27.000
|
$28.000
|
$31.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$2,500.000
|
$2,100.000
|
$1,732.760
|
$2,100.000
|
$1,900.000
|
$1,800.000
|
$2,400.000
|
$1,965.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
787.000
|
$4.000
|
$2.500
|
$2.680
|
$2.500
|
$3.150
|
$3.000
|
$2.000
|
$3.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$250.000
|
$250.000
|
$220.670
|
$250.000
|
$242.000
|
$220.000
|
$250.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,500.000
|
$3,000.000
|
$2,962.180
|
$3,000.000
|
$3,400.000
|
$2,900.000
|
$3,400.000
|
$3,355.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$300.000
|
$250.000
|
$252.190
|
$265.180
|
$380.000
|
$250.000
|
$250.000
|
$285.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$3,000.000
|
$2,500.000
|
$4,496.280
|
$5,500.000
|
$2,600.000
|
$5,000.000
|
$1,850.000
|
$3,693.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$1,500.000
|
$250.000
|
$1,605.640
|
$1,500.000
|
$2,000.000
|
$2,500.000
|
$1,000.000
|
$285.500
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
11.000
|
$35,473.000
|
$5,000.000
|
$28,946.960
|
$29,250.000
|
$38,000.000
|
$32,000.000
|
$30,000.000
|
$33,350.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
6.000
|
$440.000
|
$500.000
|
$297.100
|
$367.000
|
$330.000
|
$150.000
|
$150.000
|
$160.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$700.000
|
$565.000
|
$692.500
|
$565.000
|
$725.000
|
$700.000
|
$670.000
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$135.000
|
$100.000
|
$115.250
|
$100.000
|
$90.000
|
$100.000
|
$120.000
|
$95.250
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$30.000
|
$25.000
|
$27.250
|
$25.000
|
$25.000
|
$25.000
|
$33.000
|
$106.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
21.000
|
$38.860
|
$35.000
|
$29.250
|
$35.000
|
$42.000
|
$30.000
|
$35.000
|
$142.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
4,214.000
|
$0.340
|
$0.600
|
$0.750
|
$0.750
|
$0.600
|
$0.800
|
$1.000
|
$0.900
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
4,214.000
|
$0.320
|
$0.600
|
$0.750
|
$0.750
|
$0.600
|
$0.800
|
$1.000
|
$0.900
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
9,750.000
|
$1.590
|
$1.400
|
$0.680
|
$0.680
|
$1.400
|
$0.700
|
$1.500
|
$0.820
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
9,750.000
|
$1.530
|
$1.400
|
$0.680
|
$0.680
|
$1.400
|
$0.700
|
$1.500
|
$0.820
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
5,506.000
|
$0.900
|
$0.950
|
$1.000
|
$1.000
|
$0.950
|
$1.100
|
$0.600
|
$1.200
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
5,506.000
|
$1.180
|
$0.950
|
$1.000
|
$1.000
|
$0.950
|
$1.100
|
$0.600
|
$1.210
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
72.000
|
$6.220
|
$8.000
|
$10.000
|
$10.000
|
$8.000
|
$10.000
|
$5.000
|
$13.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
10,000.000
|
$0.900
|
$0.750
|
$0.330
|
$0.330
|
$0.750
|
$0.350
|
$0.750
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
11,012.000
|
$0.040
|
$0.080
|
$0.080
|
$0.080
|
$0.080
|
$0.100
|
$0.300
|
$0.120
|
|
|
TACK COAT
|
GAL
|
706.000
|
$11.000
|
$4.250
|
$4.290
|
$3.610
|
$4.280
|
$4.500
|
$5.500
|
$13.750
|
|
|
D-GR HMA TY-D SAC-B PG70-22 (EXEMPT)
|
TON
|
969.000
|
$180.000
|
$147.000
|
$148.480
|
$222.860
|
$147.000
|
$160.000
|
$175.000
|
$220.000
|
|
|
D-GR HMA TY-D PG70-22 (EXEMPT)
|
TON
|
1,144.000
|
$180.000
|
$147.000
|
$148.480
|
$222.860
|
$147.000
|
$160.000
|
$175.000
|
$211.520
|
|
|
FILLING MILLED ASPHALT RUMBLE STRIPS
|
LF
|
2,452.000
|
$5.000
|
$11.500
|
$11.620
|
$8.350
|
$11.000
|
$12.000
|
$6.500
|
$20.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$300.000
|
$150.000
|
$75.000
|
$135.780
|
$115.000
|
$300.000
|
$250.000
|
$416.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$400.000
|
$1,125.000
|
$900.000
|
$1,041.460
|
$400.000
|
$500.000
|
$1,000.000
|
$595.000
|
|
Totals: |
$7,534,757.601
|
$6,034,019.350
|
$6,352,329.820
|
$6,805,350.471
|
$6,856,207.198
|
$7,027,379.380
|
$7,199,920.699
|
$8,104,213.792
|