REMOVING CONCRETE(MOW STRIP)
|
LF
|
450.000
|
$13.110
|
$2.000
|
$20.000
|
$25.000
|
$20.000
|
|
|
REMOVING CONC (CCA SLAB)
|
SY
|
10.000
|
$100.000
|
$2.000
|
$100.000
|
$100.000
|
$75.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (4")
|
SY
|
280.000
|
$13.000
|
$2.000
|
$50.000
|
$25.000
|
$20.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
7.000
|
$162.940
|
$141.000
|
$500.000
|
$250.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
50.000
|
$480.510
|
$400.000
|
$550.000
|
$450.000
|
$550.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
30.000
|
$534.480
|
$1.000
|
$200.000
|
$750.000
|
$500.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
6.000
|
$963.890
|
$1.000
|
$500.000
|
$750.000
|
$1,000.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 4)
|
LF
|
2,500.000
|
$30.000
|
$10.000
|
$35.000
|
$15.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
90.000
|
$35.670
|
$10.000
|
$35.000
|
$15.000
|
$30.000
|
|
|
CONC CURB (TY II)
|
LF
|
150.000
|
$20.000
|
$20.000
|
$50.000
|
$20.000
|
$8.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
350.000
|
$24.410
|
$18.000
|
$30.000
|
$25.000
|
$25.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
100.000
|
$36.280
|
$40.000
|
$60.000
|
$30.000
|
$65.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
30.000
|
$2,087.450
|
$1,280.000
|
$1,800.000
|
$1,450.000
|
$2,000.000
|
|
|
SHORT RADIUS
|
LF
|
220.000
|
$59.070
|
$5.000
|
$40.000
|
$50.000
|
$75.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$229.380
|
$250.000
|
$1,500.000
|
$500.000
|
$1,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,262.390
|
$1,400.000
|
$1,500.000
|
$1,250.000
|
$1,850.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
1.000
|
$1,690.700
|
$500.000
|
$2,000.000
|
$1,250.000
|
$1,800.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
5.000
|
$582.330
|
$200.000
|
$500.000
|
$1,250.000
|
$675.000
|
|
|
TL-2 31" SHORT RADIUS (COMPLETE)
|
EA
|
1.000
|
$2,000.000
|
$1,000.000
|
$15,000.000
|
$4,000.000
|
$2,500.000
|
|
|
TL-3 31" SHORT RADIUS (COMPLETE)
|
EA
|
1.000
|
$22,750.000
|
$1,000.000
|
$20,000.000
|
$5,000.000
|
$7,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
800.000
|
$3.930
|
$2.000
|
$1.000
|
$5.000
|
$1.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
24.000
|
$2,903.820
|
$1,650.000
|
$3,000.000
|
$2,800.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$8,966.150
|
$100.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
1.000
|
$18,900.000
|
$18,600.000
|
$30,000.000
|
$16,000.000
|
$24,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$23,535.000
|
$18,600.000
|
$30,000.000
|
$21,500.000
|
$24,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
5.000
|
$27.970
|
$4.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
6.000
|
$30.580
|
$5.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
|
EA
|
8.000
|
$27.630
|
$10.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
30.000
|
$9.610
|
$5.500
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
|
EA
|
12.000
|
$29.210
|
$5.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SR)SZ (BRF)GF1
|
EA
|
5.000
|
$10.000
|
$4.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
300.000
|
$15.910
|
$8.000
|
$20.000
|
$16.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
5.000
|
$21.330
|
$8.000
|
$20.000
|
$15.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
5.000
|
$13.570
|
$8.000
|
$20.000
|
$17.500
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
5.000
|
$30.740
|
$8.000
|
$20.000
|
$50.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
5.000
|
$10.710
|
$8.000
|
$20.000
|
$17.500
|
$20.000
|
|
|
INSTL DEL ASSM (D-SR)SZ 1(BRF)GF2
|
EA
|
5.000
|
$10.000
|
$8.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
8.000
|
$8.680
|
$8.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
5.000
|
$3.330
|
$7.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (NON-SPECIFIC)
|
EA
|
5.000
|
$80.000
|
$7.000
|
$20.000
|
$100.000
|
$20.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
4,480.000
|
$19.400
|
$30.000
|
$20.000
|
$20.000
|
$23.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
50.000
|
$42.090
|
$2.000
|
$50.000
|
$30.000
|
$20.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
40.000
|
$40.010
|
$8.000
|
$50.000
|
$30.000
|
$40.000
|
|
|
REM/REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
12.000
|
$29.780
|
$10.000
|
$50.000
|
$50.000
|
$35.000
|
|
|
RAISE RAIL ELEMENT
|
LF
|
10.000
|
$7.320
|
$0.200
|
$50.000
|
$50.000
|
$8.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
200.000
|
$45.170
|
$35.000
|
$30.000
|
$65.000
|
$40.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
250.000
|
$51.410
|
$45.000
|
$50.000
|
$80.000
|
$45.000
|
|
|
REM / REPL STEEL POST W / CONC FND
|
EA
|
12.000
|
$107.680
|
$0.010
|
$100.000
|
$150.000
|
$150.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
10.000
|
$146.660
|
$1.000
|
$300.000
|
$250.000
|
$250.000
|
|
|
REALIGN POSTS
|
EA
|
60.000
|
$38.250
|
$0.500
|
$50.000
|
$50.000
|
$23.000
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
50.000
|
$21.980
|
$0.500
|
$50.000
|
$50.000
|
$17.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
3,600.000
|
$47.050
|
$34.000
|
$25.000
|
$26.500
|
$25.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
400.000
|
$55.260
|
$38.000
|
$60.000
|
$90.000
|
$60.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
25.000
|
$3,351.710
|
$2,100.000
|
$2,900.000
|
$2,800.000
|
$3,100.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
100.000
|
$1,041.020
|
$2,200.000
|
$800.000
|
$1,300.000
|
$1,200.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
10.000
|
$140.330
|
$1.000
|
$50.000
|
$250.000
|
$85.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
90.000
|
$83.160
|
$100.000
|
$100.000
|
$85.000
|
$150.000
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
85.000
|
$73.080
|
$100.000
|
$100.000
|
$70.000
|
$85.000
|
|
|
REPLACE SGT STRUT
|
EA
|
50.000
|
$65.590
|
$100.000
|
$100.000
|
$70.000
|
$90.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
130.000
|
$27.050
|
$1.000
|
$50.000
|
$25.000
|
$25.000
|
|
|
REMOVE AND REPLACE LONG SPAN CRT POST
|
EA
|
2.000
|
$50.000
|
$120.000
|
$100.000
|
$100.000
|
$125.000
|
|
|
REMOVE AND REPLACE DAT
|
EA
|
1.000
|
$1,309.380
|
$500.000
|
$2,500.000
|
$1,750.000
|
$1,500.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
200.000
|
$117.200
|
$2.000
|
$175.000
|
$185.000
|
$220.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
1.000
|
$241.590
|
$150.000
|
$300.000
|
$750.000
|
$500.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
1.000
|
$174.000
|
$10.000
|
$100.000
|
$1,250.000
|
$150.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
1.000
|
$1,559.680
|
$1,150.000
|
$2,000.000
|
$3,000.000
|
$2,200.000
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
2.000
|
$273.980
|
$60.000
|
$200.000
|
$1,500.000
|
$300.000
|
|
|
REPAIR (TRACC)
|
LF
|
1.000
|
$706.250
|
$100.000
|
$500.000
|
$1,250.000
|
$25.000
|
|
|
REPAIR (ENERGY ABSORB SYS) (GDRAIL)
|
EA
|
1.000
|
$3,500.000
|
$500.000
|
$3,000.000
|
$2,500.000
|
$2,000.000
|
|
|
REPAIR REACT (MISC) (HARDWARE)
|
EA
|
40.000
|
$1,182.500
|
$350.000
|
$900.000
|
$400.000
|
$850.000
|
|
|
REPAIR REACT (CYLINDERS)
|
EA
|
1.000
|
$2,673.220
|
$1,800.000
|
$2,000.000
|
$2,500.000
|
$2,500.000
|
|
|
REPAIR (SHORTRACC)
|
LF
|
10.000
|
$300.000
|
$150.000
|
$500.000
|
$300.000
|
$250.000
|
|
|
REPAIR TAU II (N)
|
LF
|
12.000
|
$139.650
|
$150.000
|
$400.000
|
$300.000
|
$320.000
|
|
|
REPAIR TAU II (W)
|
LF
|
10.000
|
$194.350
|
$30.000
|
$500.000
|
$300.000
|
$50.000
|
|
|
REPAIR (SMTC) (N)
|
LF
|
10.000
|
$225.180
|
$85.000
|
$500.000
|
$100.000
|
$320.000
|
|
|
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
|
EA
|
1.000
|
$12,727.270
|
$12,000.000
|
$28,000.000
|
$10,000.000
|
$23,625.000
|
|
|
REPAIR (QUADGUARD)(MASH)(N)
|
EA
|
1.000
|
$6,173.000
|
$1.000
|
$5,000.000
|
$3,200.000
|
$3,524.000
|
|
|
REPAIR (QUADGUARD)(MASH)(N)
|
LF
|
100.000
|
$142.000
|
$1.000
|
$300.000
|
$500.000
|
$53.000
|
|
|
REMOVE AND REPLACE (TAU)(MASH)(N)
|
EA
|
1.000
|
$13,272.730
|
$12,000.000
|
$20,000.000
|
$10,000.000
|
$7,647.000
|
|
|
REPAIR (TAU)(MASH)(N)
|
EA
|
1.000
|
$2,579.000
|
$1.000
|
$5,000.000
|
$3,200.000
|
$2,050.000
|
|
|
REPAIR (STEEL POST W/ W-BEAM - T101)
|
LF
|
10.000
|
$28.880
|
$1.000
|
$300.000
|
$120.000
|
$75.000
|
|
|
REPAIR (STL POST W/ DOUBLED W-BEAMS-T6)
|
LF
|
12.500
|
$22.060
|
$80.000
|
$150.000
|
$120.000
|
$85.000
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$185.960
|
$218.000
|
$1.000
|
$750.000
|
$600.000
|
|
Totals: |
$1,076,423.840
|
$854,501.120
|
$1,047,125.000
|
$1,058,880.000
|
$1,099,473.500
|